Formerly | Multibrid GmbH Areva Wind GmbH |
---|---|
Company type | Subsidiary |
Industry | Engineering |
Founded | 2000 |
Founders | Areva Gamesa |
Defunct | 2017 |
Fate | merged into Gamesa |
Successor | Siemens Gamesa |
Headquarters | , Germany |
Key people | Carsten König (CEO) Michael Krause (CFO) Stephen Deehan (COO) |
Services | Offshore wind services |
Owner | Siemens Energy (via Siemens Gamesa) |
Number of employees | 480 (2018) |
Parent | Siemens Energy |
Website | www |
Adwen GmbH (now Siemens Gamesa Renewable Energy Deutschland GmbH ) is an offshore wind service company headquartered in Bremerhaven, Germany. It is a wholly owned subsidiary of Spanish-German company Siemens Gamesa. Previously the company designed, assembled, and installed 5-Megawatt wind turbines for offshore wind farms. It also designed and manufactured rotor blades through its subsidiary Adwen Blades GmbH, headquartered in Stade, Germany.
Adwen was established as Multibrid GmbH by Pfleiderer Wind Energy GmbH in 2000, after acquiring Multibrid turbine technology from aerodyn Energiesysteme GmbH. [1] In 2003, Multibrid was bought by Prokon Nord Energiesysteme GmbH. [2] [3] In 2007, Multibrid opened a wind turbine assembly plant in Bremerhaven. [1] At the same year, Prokon Nord established a blade manufacturer PN Rotor GmbH.
The French nuclear corporation Areva invested in Multibrid in 2007, buying 51% of the company's shares for €150 million. [1] [4] In 2009, Areva acquired PN Rotor, [5] which became Areva Blades. Areva bought the remaining 49% of shares of Multibrid in 2010. [4] Correspondingly, the company was renamed Areva Wind GmbH.
The first prototype was installed in 2004. Three additional onshore turbines were installed in 2008 in order to develop expertise with tripods, large hub heights, erection, lifting equipment, logistics and serial manufacturing. In 2009, Multibrid installed six wind turbines at the Alpha Ventus Offshore Wind Farm. [6] In 2009, Areva Wind was selected as a turbine supplier for the Global Tech 1 offshore wind farm, in 2010 for the Borkum West II offshore wind farm and in 2012 for the Wikinger offshore wind farm. [7]
In 2014, Areva and Gamesa Corporación Tecnológica started negotiations to create a joint venture for the offshore wind energy. [8] The equally owned joint venture named Adwen was formed in 2015 and it was created on the basis of Areva Wind, including Areva's M5000-135 turbine and 8 MW turbine platform under development. Gamesa contributed its G132-5.0 MW Offshore turbine technology. [9] In 2017, Areva sold its stake in Adwen to Gamesa, after the merger of Gamesa and Siemens Wind Power was announced. [10] [11]
In 2017, Siemens Gamesa announced a restructuring plan for Adwen, to be completed by September 2020. Manufacturing of wind turbines by Adwen was discontinued and Adwen focused on servicing installed turbines. Plants in Bremen and Emden would be closed and the number of employees in Germany would be reduced from 480 to 211. [12] [13]
Adwen had plants in Bremerhaven, Bremen and Emden in Germany, and it planned to build manufacturing or assembling plants in other markets, particularly in Le Havre in France. However, due to restructuring the only plant which would remain is the plant in Bremerhaven, which would support the offshore services.
Adwen provided two different 5 MW offshore turbines: AD 5-135 (formerly Areva M5000-135) for the Wikinger Project and AD 5-116 for the North Sea Projects GlobalTech One, Borkum West II and Alpha Ventus. In addition, it has developed 8 MW AD 8-180 turbine prototype, which has the world largest wind turbine gearbox, developed jointly with the wind energy engineering company Winergy. [14] Due to the restructuring, the Adwen's AD 8-180 project was discontinued and Siemens Gamesa replaced it with its SWT 8MW turbine model. [15] [16]
Adwen has provided wind turbines for Alpha Ventus (6 x 5 MW), Trianel (former Borkum West II, 40 x 5 MW), Global Tech I (80 x 5 MW), and Wikinger (80 x 5 MW) offshore wind farms, all located in the German waters.
Areva S.A. is a French multinational group specializing in nuclear power headquartered in Courbevoie, France. Before its 2016 corporate restructuring, Areva was majority-owned by the French state through the French Alternative Energies and Atomic Energy Commission (54.37%), Banque publique d'investissement (3.32%), and Agence des participations de l'État (28.83%). Électricité de France, of which the French government has a majority ownership stake, owned 2.24%; Kuwait Investment Authority owned 4.82% as the second largest shareholder after the French state.
Enercon GmbH is a wind turbine manufacturer based in Aurich, Lower Saxony, Germany. It has been the market leader in Germany since the mid-1990s. Enercon has production facilities in Germany, Brazil, India, Canada, Turkey and Portugal. In June 2010, Enercon announced that they would be setting up Irish headquarters in Tralee.
Wind power in Germany is a growing industry. The installed capacity was 55.6 gigawatts (GW) at the end of 2017, with 5.2 GW from offshore installations. In 2020, 23.3% of the country's total electricity was generated through wind power, up from 6.2% in 2010 and 1.6% in 2000.
Siemens Gamesa Renewable Energy, S.A., born in 2017 as the merger of Siemens's Wind Power Division with Gamesa Corporación Tecnológica, S.A., is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. In Spain, the company has two other main sites in Spain: one in Madrid and the other one in Sarriguren. Other than its headquarters, its onshore business is primarily based in Spain, while the offshore business is based in Germany and Denmark. It is the world's second largest wind turbine manufacturer behind Vestas.
Nordex SE is a European company that designs, sells and manufactures wind turbines. The company's headquarters in the German city of Rostock while management is in Hamburg. Production takes place in Rostock as well as in China and in the city of Heroica Matamoros, state of Tamaulipas, México for a brief time in Jonesboro, Arkansas. The company was founded in 1985 in Give, Denmark. Since then the company steadily grew. In 1995 Nordex was the first company to mass-produce a 1 MW turbine booster. The company Südwind Babcock-Borsig has been fully implented into Nordex on October 1, 2001. Nordex began also producing the turbines of the manufacturer Südwind, which had previously gone bankrupt. Nordex started producing turbines in the 1.5 MW class from 2001 - originally from "pro + pro Energiesysteme" developed the S70 and later the S77 - under license.
Senvion S.A. was a German wind turbine manufacturer founded in 2001 in Germany, majority owned by a private equity firm. Senvion as REpower Systems, as it was initially called, was established in 2001 through the merger of German wind companies: HSW, the engineering consultancy Pro+Pro, the wind turbine manufacturer BWU and Jacobs Energie; and since April 2015 Centerbridge Partners. It was under the ownership of Suzlon, an India wind turbine manufacturer, from 2007 to 2015.
BARD Offshore 1 is a 400 megawatt (MW) North Sea offshore wind farm with 80 BARD 5.0 turbines. Since the owner could not buy such 5MW offshore wind turbines in sufficient numbers in 2006, Dr. Bekker set up its own production of turbines. This should serve as the legacy for his children. The systems were developed by aerodyn Energiesysteme GmbH. A plant for rotor blades and nacelle assembly was built in Emden and a plant for the offshore foundations in Cuxhaven. Two turbine prototypes were set up at the Rysumer Nacken in 2007, and another prototype in Hooksiel in 2008. Construction was finished in July 2013 and the wind farm was officially inaugurated in August 2013. The wind farm is located 100 kilometres (60 mi) northwest of the isle Borkum in 40-metre (130 ft) deep water.
Alpha Ventus Offshore Wind Park is a German offshore wind farm. This is Germany’s first offshore wind farm. It is situated in the North Sea, 45 kilometres (28 mi) north of the island of Borkum.
DanTysk is a 288 megawatt (MW) offshore wind farm in the North Sea 70 kilometres (43 mi) west of the island Sylt, in the German EEZ at the border to Denmark. The wind farm operates 80 Siemens Wind Power's SWT-3.6-120 turbines with a capacity of 3.6 MW each.
The Ormonde Wind Farm is a wind farm west of Barrow-in-Furness in the Irish Sea. The wind farm covers an area of 8.7 square kilometres (3.4 sq mi). It has a total capacity of 150 MW and is expected to produce around 500 GWh of electricity per year.
WinWinD was a wind turbine manufacturer headquartered in Espoo, Finland. It manufactured and supplied wind turbines with capacity of 1 and 3 MW.
The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.
Trianel Windpark Borkum is an offshore wind farm near Borkum. Its first phase of 40 turbines rated at a total capacity of 200 MW is operational, with a planned, additional 200 MW in a second phase. The project was approved for construction in 2008 and will cost over €1 billion to construct once fully operational. Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013.
Energiekontor is a German company specialized in the development and management of wind farms and solar parks. The main activities are concentrated in Germany, Portugal and in the United Kingdom. The company sells developed facilities or takes the ownership. Energiekontor manages external wind farms for clients as well.
The tripod is a type of foundation for offshore wind turbines. The tripod is generally more expensive than other types of foundation. However, for large turbines and higher water depth, the cost disadvantage might be compensated when durability is also taken into account.
Veja Mate is a German 402 MW offshore wind farm in the German Bight of the North Sea about 95 km northwest of Borkum. The wind farm consists of 67 Siemens Wind Power SWT-6.0-154 turbines, each with a 6 MW capacity.
The AEROVIDE GmbH is a German company and engineering consultancy that develops wind turbines. Its headquarters are located in Rendsburg, Schleswig-Holstein.