The Armored Systems Modernization (ASM) was a U.S. Army combat vehicle procurement program canceled in 1992. The Army sought to develop a family of six armored vehicles based on two common chassis, one heavy and one medium, which would both share commonalities. Systems that the ASM sought to replace included the M1 Abrams main battle tank, M109 howitzer and M2 Bradley infantry fighting vehicle. The Army spun out several of the systems—Advanced Field Artillery System, Line-of-Sight Anti-Tank and the Armored Gun System—after canceling the program, but all of these programs were eventually canceled.

Contents

History

The ASM program began in the mid-1980s, when the Army planned to simultaneously develop, produce, and field 24 new combat vehicles, including tanks, self-propelled artillery, infantry fighting vehicles, and other armored systems, under what was called the "Armored Family of Vehicles Program". The Army planned to base its armored modernization approach on a family of vehicles with a common chassis and common modular components. Army studies showed that using a common chassis and common components could reduce future operational and support costs. However, the Army's effort was dramatically scaled back because of the high costs involved in developing and producing so many different systems. In March 1985, the Army downsized the program to its six highest priority vehicles: four to be built on a heavy common chassis (weighing 55 to 62 tons) and two on a medium chassis (weighing up to 36 tons). The downsized program was renamed the "Heavy Force Modernization Program".

In February 1990, the Army added a light, direct-fire weapon—the Armored Gun System (AGS)—and renamed the program "Armored Systems Modernization."

In July 1990, the Senate Armed Services Committee (SASC) passed markup requiring that the Army develop the Advanced Field Artillery System (AFAS) first, rather than the Block III tank as the Army intended. [1] In October, the Senate Appropriations Committee (SAC) passed similar language deferring the Block III main battle tank and zeroing the $113 million R&D request for the Block III tank. The House Armed Services Committee directed the Army to make the AGS its top priority modernization program. [2] In September 1991, for FY1992 SAC slashed $125 million from the Advanced Technology Transition Demonstrator ATTD) common chassis in a move some industry officials characterized as a wake-up call for the Army. The Army had not been responsive to Congressional calls to prioritize AFAS. Funding for ATTD was restored in a conference report accompanying the Defense Appropriations Bill, however overall ASM funding was reduced $100 million. [3] In a memo to Congress in October 1991, the Army agreed to align its strategy with Congress. [4]

In December 1990, the Army awarded Teledyne Motors and Armored Vehicle Technologies Associated (a joint venture of FMC Corporation and General Dynamics Land Systems Division [5] ) a contract to develop ASM Advanced Technology Transition Demonstrators. Teledyne received $343 million and Armored Vehicles received $287 million. [6]

Both the heavy and medium chassis would share some commonalities. [7]

In response to funding shortfall estimates beyond fiscal year 1997, the Defense Acquisition Board reviewed the Army's ASM program and directed that the Army develop a more realistic acquisition program. In its response, the Army insisted that the ASM program was affordable. The Army added a prototype phase to each of the vehicles at the direction of the Board in August 1990. The Board wanted the prototype phase to minimize integration risks brought about by the separate development of the common chassis and individual weapon components.

In December 1991, Army Secretary Michael P. W. Stone proposed delaying the Block III tank, Future Infantry Fighting Vehicle, and Combat Mobility Vehicle. The Advanced Field Artillery System (AFAS) and Future Armored Resupply Vehicle-Ammunition (FARV-A) were given top priority, as requested by Congress. [8] [9] In March, the Congressional Budget Office proposed cutting ASM funding to $100 million over the following five years. [10] In June, the Army delivered a plan that would additionally cut back on funding for LOSAT. The plan called for wrapping up the common chassis program by May 1993. [11] Later in June, the Office of the Secretary of Defense approved the Army's plan. Under the plan the Army would reduce the scope of the common chassis contracts, with termination occurring in FY23. [12]

In October 1992, the Army canceled Armored Systems Modernization due to changing budgetary priorities due to the collapse of the Soviet Union. The Army restructured two contracts worth $629 million between Teledyne Continental Motors and Armored Vehicle Technologies Associated. The funds were directed towards engine and electric drive system research. [13]

Comparison of variants
NameVehicle replacedAcquisition target [14]
Block III tank M1 Abrams 1946
Future Infantry Fighting Vehicle (FIFV) M2 Bradley 1321
Combat Mobility Vehicle (CMV) M728 Combat Engineer Vehicle & M9 258
Advanced Field Artillery System (AFAS) M109 howitzer 824
Future Armored Resupply Vehicle (FARV) M992 Field Artillery Ammunition Support Vehicle & M548 824
Line-of-Sight Antitank System (LOSAT) M901 ITV 907

Heavy Chassis

Army conception of Heavy Chassis variants ASM - Heavy Chassis.png
Army conception of Heavy Chassis variants

The Army developed the heavy chassis using a two-pronged development strategy: an in-house Army component development and test program and a competitive contractor development phase.

The four systems to be built on a common heavy chassis were the Block III tank, a main battle tank; the Combat Mobility Vehicle, an engineering vehicle for mine clearance and other engineering tasks; the Advanced Field Artillery System, a self-propelled howitzer; and the Future Infantry Fighting Vehicle, an infantry fighting vehicle. The chassis will have certain common elements such as engines, transmissions, suspensions, modular armor, and tracks. The ASM common heavy chassis could have actually been two chassis, one with the engine in the rear and one with the engine in the front because tanks traditionally have had the engine in the rear, while self-propelled artillery and infantry fighting vehicles have had the engine in the front. However, the chassis were required to be sufficiently similar to permit production on a single assembly line.

The Army's initial development priority was the Block III tank, with the other heavy chassis systems to follow.

The Army planned for each of the three remaining heavy chassis systems to go through a technology demonstrator phase prior to the start of prototype development. The award of the demonstrator contracts was scheduled for the Combat Mobility Vehicle and for the Advanced Field Artillery System in fiscal year 1991 and for the Future Infantry Fighting Vehicle in fiscal year 1993. The demonstrator for the Combat Mobility Vehicle would integrate obstacle-breaching components on a surrogate tank chassis. The demonstrator for the Advanced Field Artillery System would integrate a new artillery cannon and fire control system on a surrogate chassis. The demonstrator for the Future Infantry Fighting Vehicle would integrate a new cannon and fire control system on a modified existing chassis.

The Army planned to award prototype development contracts for the other three vehicles in 1994. The prototypes would integrate each system's unique weapons on the common heavy chassis. The full-scale development phase would begin in 1998 for the Advanced Field Artillery System and the Combat Mobility Vehicle and in 1997 for the Future Infantry Fighting Vehicle. Vehicle production was scheduled to begin in 2001 for the Advanced Field Artillery System and Future Infantry Fighting Vehicle and in 2002 for the Combat Mobility Vehicle. The scheduled first-unit-equipped dates were 2003 for the Advanced Field Artillery System and 2004 for the remaining two vehicles.

Block III tank

The Army's initial development priority was the Block III, with the other heavy chassis systems to follow.

The Block III was the service's replacement for the M1 Abrams. Two gun tubes, 120 mm and 140 mm, were developed for the Advanced Tank Cannon System. The 140 mm tube was considered necessary if the Soviets ever developed an advanced main battle tank. The service figured that the smaller barrel could be fitted when the situation did not call for the larger gun. [15]

In fiscal year 1990, the Army began work on the in-house phase when it began to develop a "test bed", a modified M1 Abrams chassis that was used to test components for the common heavy chassis, such as the engine, transmission, and suspension, and for the Block III tank's weapon system, including the fire control, new 140 mm gun, [16] and autoloader. This effort was scheduled to continue through fiscal year 1993.

In December 1990, the Army awarded contracts to Teledyne Continental Motors and to Armored Vehicle Technologies Associated (a joint venture of General Dynamics Land Systems and FMC Corporation) for the competitive design and development of a common heavy chassis. This effort was scheduled to continue through the first quarter of fiscal year 1994. The contractors could use either the Army developed or independently developed components.

After the chassis was developed, the Army planned to select one of the contractors to develop the tank. This selection was scheduled for fiscal year 1994, and the selected contractor was required to develop a prototype tank integrating the common heavy chassis with the tank weapons components.

The contractor was allowed to choose which weapons components to use. The prototype tank phase was scheduled to end in 1997, and full-scale tank development was scheduled to begin later that year. Block III tank production was scheduled to start in the fourth quarter of fiscal year 2001, with the first unit equipped in the second quarter of 2003.

In June 1991 the House denied funding for the 140 mm gun. [15]

In December 1991, Army Secretary Michael P. W. Stone proposed delaying the Block III tank, and the Advanced Field Artillery System and Future Armored Resupply Vehicle-Ammunition replaced the Block III as the service's first ASM priority. [8]

Future Infantry Fighting Vehicle

The Future Infantry Fighting Vehicle was the M2 Bradleys intended successor. It was expected to have a more lethal autocannon, improved anti-tank missile system. The crew was reduced from three, of the Bradley, to two. [16]

Advanced Field Artillery System

The Advanced Field Artillery System (AFAS), the successor to the M109 howitzer, was armed with a 155 mm L/52 gun capable of firing at least 12 rounds a minute. Ammunition storage was increased. AFAS required fewer crew members and incorporated a computer fire control system. [16]

Combat Mobility Vehicle

The award of the demonstrator contracts was scheduled for the in fiscal year 1991. The demonstrator for the Combat Mobility Vehicle would integrate obstacle-breaching components on a surrogate tank chassis. The Army planned to award prototype development contracts for the CMV in 1994. The full-scale development phase would begin in 1998. Production would begin in 2002. First-unit-equipped would occur in 2004.

In April 1991, the Army awarded BMY Combat Systems a $10.9 million contract for a CMV Advanced Technology Transition Demonstrator. A near-term solution was eventually desired so the contract was modified in September 1992. This became the "Breacher". [17]

Medium Chassis

LOSAT and FARV Armored System Modernization medium chassis.png
LOSAT and FARV

The ASM Program plans called for two systems to be built on a common medium chassis: the Line-of-Sight Anti-Tank system, a vehicle carrying a high-speed, kinetic-energy anti-tank missile; and the Future Armored Resupply Vehicle-Ammunition, an artillery resupply vehicle for the Advanced Field Artillery System. However, while work on requirements for a medium chassis were underway, these systems would initially be integrated on a surrogate modified Bradley Fighting Vehicle chassis.

Line-of-Sight Anti-Tank

The Line-of-Sight Anti-Tank vehicle was the intended successor to the M901 Improved TOW Vehicle. [16]

The Army initiated development of the LOSAT missile prior to the ASM program. LOSAT was tested on a surrogate chassis.

The Army tested the missile from 1990 to 1991. On December 5, 1990, the Defense Acquisition Board approved continued development of the missile. The Army planned to begin full-scale development of the system in early 1992, with production in 1997.

As of July 1990, the chassis was planned to be based on the Bradley Fighting Vehicle. [18]

Future Armored Resupply Vehicle-Ammunition

Future Armored Resupply Vehicle-Ammunition (FARV-A) was the planned replacement for the M992 Field Artillery Ammunition Support Vehicle. FARV-A was a companion vehicle to the Advanced Field Artillery System. FARV-A allowed crews to supply ammunition under armor (i.e. without leaving their vehicle).

The Army planned to initiate advanced development of the FARV-A in fiscal year 1991. The advanced development phase would demonstrate technologies for ammunition stowage and advanced material handling on a modified Bradley Fighting Vehicle chassis (A Multiple Launch Rocket System as of July 1990). [18] The Army planned to begin the prototype development phase for the vehicle in 1994, with full-scale development to follow in 1997 and production in 2002. The Army struggled to find the needed funding for the vehicle before the end of fiscal year 1991.

Armored Gun System

A third vehicle, added in February 1990, constituted the third, light category of vehicle called the Armored Gun System. The Army planned to buy 300 of these to replace the M551 Sheridan light tank. Select models were designed to be air-dropped from a C-130. In 1992 the Army selected FMC Corporation's Close Combat Vehicle Light. This was redesignated as the M8 Armored Gun System. The AGS was canceled just before production in 1996 due to budget constraints.

See also

Related Research Articles

<span class="mw-page-title-main">Armoured fighting vehicle</span> Combat vehicle with both armament and armour

An armoured fighting vehicle or armored fighting vehicle (AFV) is an armed combat vehicle protected by armour, generally combining operational mobility with offensive and defensive capabilities. AFVs can be wheeled or tracked. Examples of AFVs are tanks, armoured cars, assault guns, self-propelled artilleries, infantry fighting vehicles (IFV), and armoured personnel carriers (APC).

<span class="mw-page-title-main">Infantry fighting vehicle</span> Type of armored personnel carrier with direct-fire support

An infantry fighting vehicle (IFV), also known as a mechanized infantry combat vehicle (MICV), is a type of armoured fighting vehicle used to carry infantry into battle and provide direct-fire support. The 1990 Treaty on Conventional Armed Forces in Europe defines an infantry fighting vehicle as "an armoured combat vehicle which is designed and equipped primarily to transport a combat infantry squad, and which is armed with an integral or organic cannon of at least 20 millimeters calibre and sometimes an antitank missile launcher". IFVs often serve both as the principal weapons system and as the mode of transport for a mechanized infantry unit.

<span class="mw-page-title-main">Self-propelled artillery</span> Artillery mounted on a vehicle for mobility and protection

Self-propelled artillery is artillery equipped with its own propulsion system to move toward its firing position. Within the terminology are the self-propelled gun, self-propelled howitzer, self-propelled mortar, and rocket artillery. They are high mobility vehicles, usually based on continuous tracks carrying either a large field gun, howitzer, mortar, or some form of rocket/missile launcher. They are usually used for long-range indirect bombardment support on the battlefield.

<span class="mw-page-title-main">XM2001 Crusader</span> American 155 mm self propelled artillery project

The XM2001 Crusader was to be the United States Army's next-generation self-propelled howitzer (SPH), designed to improve the survivability, lethality, mobility, and effectiveness of the artillery as well as the overall force. It was initially scheduled for fielding by 2008. United Defense was the prime contractor; General Dynamics the major subcontractor. In early May 2002, Secretary of Defense Donald Rumsfeld canceled the US$11 billion program because he considered it neither mobile nor precise enough. The prototype SPH vehicle is on display at the cannon park at Fort Sill.

<span class="mw-page-title-main">Merkava</span> Israeli main battle tank

The Merkava is a series of main battle tanks used by the Israel Defense Forces and the backbone of the IDF's armored corps. The tank began development in 1970, and its first generation, the Merkava mark I, entered official service in 1979. Four main variants have been deployed. As of 2023, the Merkava mark IV is the latest version. The Merkava was first used extensively in the 1982 Lebanon War. The name "Merkava" was derived from the IDF's initial development program name.

<span class="mw-page-title-main">Combat Vehicle 90</span> Swedish Infantry fighting vehicle

The Combat Vehicle 90 (CV90) is a family of Swedish tracked armored combat vehicles designed by the Swedish Defence Materiel Administration (FMV), Hägglunds and Bofors during the mid-1980s to early 1990s, entering service in Sweden in the mid-1990s. The CV90 platform design has continuously evolved from the Mk 0 to current Mk IV with technological advances and changing battlefield requirements. The Swedish version of the main infantry fighting vehicle (IFV) is fitted with a turret from Bofors equipped with a 40 mm Bofors autocannon. Export versions are fitted with Hägglunds E-series turrets, armed with either a 30 mm Mk44 or a 35 mm Bushmaster autocannon.

<span class="mw-page-title-main">Bradley Fighting Vehicle</span> American tracked armoured fighting vehicle

The Bradley Fighting Vehicle (BFV) is a tracked armoured fighting vehicle platform of the United States developed by FMC Corporation and manufactured by BAE Systems Land & Armaments, formerly United Defense. The BFV is named after U.S. General Omar Bradley.

<span class="mw-page-title-main">Stryker</span> Armored personnel carrier–infantry fighting vehicle hybrid

The Stryker is a family of eight-wheeled armored fighting vehicles derived from the Canadian LAV III. Stryker vehicles are produced by General Dynamics Land Systems-Canada (GDLS-C) for the United States Army in a plant in London, Ontario. It has four-wheel drive (8×4) and can be switched to all-wheel drive (8×8).

<span class="mw-page-title-main">Future Combat Systems</span> Modernization program of United States Army

Future Combat Systems (FCS) was the United States Army's principal modernization program from 2003 to early 2009. Formally launched in 2003, FCS was envisioned to create new brigades equipped with new manned and unmanned vehicles linked by an unprecedented fast and flexible battlefield network. The U.S. Army claimed it was their "most ambitious and far-reaching modernization" program since World War II. Between 1995 and 2009, $32 billion was expended on programs such as this, with little to show for it.

<span class="mw-page-title-main">Brigade combat team</span> Basic deployable unit of maneuver in the U.S. Army

The brigade combat team (BCT) is the basic deployable unit of maneuver in the U.S. Army. A brigade combat team consists of one combat arms branch maneuver brigade, and its assigned support and fire units. A brigade is normally commanded by a colonel (O-6) although in some cases a brigadier general (O-7) may assume command. A brigade combat team contains combat support and combat service support units necessary to sustain its operations. BCTs contain organic artillery training and support, received from the parent division artillery (DIVARTY). There are three types of brigade combat teams: infantry, Stryker, and armored.

<span class="mw-page-title-main">ASCOD</span> Austro-Spanish armoured fighting vehicle

The ASCOD armoured fighting vehicle family is the product of a cooperation agreement between Austrian Steyr-Daimler-Puch AG and Spanish General Dynamics Santa Bárbara Sistemas. The ASCOD family includes the LT 105, a light tank equipped with a 105 mm gun, a surface-to-air missile launcher, an anti-tank guided missile launcher, mortar carrier, R&R vehicle, command and control vehicle, ambulance, artillery observer, and the AIFV model. In Spanish service, the vehicle is called "Pizarro", while the Austrian version is called "Ulan".

<span class="mw-page-title-main">M8 Armored Gun System</span> American light tank

The M8 Armored Gun System (AGS), sometimes known as the Buford, is an American light tank that was intended to replace the M551 Sheridan and TOW missile-armed Humvees in the 82nd Airborne Division and 2nd Armored Cavalry Regiment of the U.S. Army respectively.

<span class="mw-page-title-main">M1128 Mobile Gun System</span> US assault gun based on the Stryker AFV

The M1128 Mobile Gun System (MGS) is an eight-wheeled assault gun of the Stryker family, mounting a 105 mm tank gun, based on the Canadian LAV III light-armored vehicle manufactured by General Dynamics Land Systems for the U.S. Army.

List of abbreviations, acronyms and initials related to military subjects such as modern armour, artillery, infantry, and weapons, along with their definitions.

<span class="mw-page-title-main">Namer</span> Israeli heavy armoured personnel carrier

Namer, means "leopard" and also a syllabic abbreviation of "Nagmash" (APC) and "Merkava", is an Israeli armoured personnel carrier based on a Merkava Mark IV tank chassis. Namer was developed by and is being assembled by the Israeli Ordnance Corps. It has entered service in limited numbers with the Israel Defense Forces since the end of 2008. However, as of 2014, still only very limited numbers of Namers were in service with the IDF. Due to budgetary constraints, the introduction of the Namer into the IDF has been slow, leaving the ground forces dependent on the M113 for many years to come.

<span class="mw-page-title-main">Future Combat Systems Manned Ground Vehicles</span> Tracked armored fighting vehicles

The Manned Ground Vehicles (MGV) was a family of lighter and more transportable ground vehicles developed by BAE Systems and General Dynamics as part of the U.S. Army's Future Combat Systems (FCS) program. The MGV program was intended as a successor to the Stryker of the Interim Armored Vehicle program.

<span class="mw-page-title-main">Ground Combat Vehicle</span> Infantry fighting vehicle

The Ground Combat Vehicle (GCV) was a program initiated by the United States Army in 2009, with the goal of developing a next-generation armored fighting vehicle. The first variant of the GCV to be developed would be an infantry fighting vehicle to replace the M2 Bradley.

<span class="mw-page-title-main">M2 Bradley</span> American infantry fighting vehicle

The M2 Bradley, or Bradley IFV, is an American infantry fighting vehicle that is a member of the Bradley Fighting Vehicle family. It is manufactured by BAE Systems Land & Armaments, which was formerly United Defense.

<span class="mw-page-title-main">Interim Armored Vehicle</span> Acquisition program of United States Army

The Interim Armored Vehicle (IAV), previously known as the Medium Armored Vehicle (MAV), was a U.S. Army armored fighting vehicle acquisition program. General Dynamics Land Systems (GDLS) and General Motors Defense proposed a vehicle based on the LAV III. The Army selected the LAV III proposal over three other submissions. The LAV III was renamed Stryker.

<span class="mw-page-title-main">General Dynamics Griffin</span> Series of American armored fighting vehicles

The General Dynamics Griffin is a series of armored fighting vehicles under development by General Dynamics Land Systems (GDLS) for the United States Army. The Griffin is a derivative of ASCOD family of AFVs, which was also designed by GDLS.

References

  1. "SASC requires Army to develop ASM artillery before tank". Defense Daily. Vol. 168, no. 13. Access Intelligence. 19 July 1990. Retrieved 16 January 2023.
  2. "SAC makes AFAS priority over block III tank". Defense Daily. Vol. 169, no. 13. Access Intelligence. 18 October 1990. Retrieved 16 January 2023.
  3. "otal ASM funding reduced, but common chassis money restored; wake-up call for Army". Defense Daily. Vol. 173, no. 38. Access Intelligence. 25 November 1991. Retrieved 16 January 2023.
  4. [Congress adheres to Army's plan in ASM authorization "Congress adheres to Army's plan in ASM authorization"]. Defense Daily. Vol. 173, no. 24. Access Intelligence. 4 November 1991. Retrieved 16 January 2023.{{cite news}}: Check |url= value (help)
  5. "Chassis contract awarded to Armored Vehicle Technologies Associated, a joint venture of FMC Corporation and General Dynamics Land Systems". PR Newswire. 17 December 1990. Retrieved 16 January 2023.
  6. "Army awards ASM tech contracts". Defense Daily. Vol. 169, no. 52. Access Intelligence. 17 December 1990. Retrieved 16 January 2023.
  7. Watkins, Steven (18 April 1991). "Senate Panel Levels Sharp Criticism at Army's Next Generation Armored Force". Inside the Pentagon. Vol. 7, no. 16. Inside Washington Publishers. p. 14. JSTOR   43987042 . Retrieved 7 February 2022.
  8. 1 2 "Army Chief Delivers New ASM Plan to OSD; Proposes Delay in Block III Tank". Inside the Pentagon. Vol. 7, no. 51. Inside Washington Publishers. 19 December 1991. pp. 2–3. JSTOR   43987647 . Retrieved 7 February 2022.
  9. "Army formally spells out ASM restructuring". Defense Daily. Vol. 174, no. 2. Access Intelligence. 6 January 1992. Retrieved 16 January 2023.
  10. "Congressional Budget Office Proposes 47 Options to Cut Defense Spending". Inside the Pentagon. Vol. 8, no. 11. Inside Washington Publishers. 12 March 1992. pp. 16–17. JSTOR   43987854 . Retrieved 7 February 2022.
  11. Watkins, Steven (4 June 1992). "New Program Will Focus on AFAS, FARV-A Vehicles: Under Pressure by OSD and Congress, Army Scraps ASM Program". Inside the Pentagon. Vol. 8, no. 23. Inside Washington Publishers. p. 14. JSTOR   43988094 . Retrieved 7 February 2022.
  12. "OSD formally approves ASM restructuring". Defense Daily. Vol. 175, no. 53. Access Intelligence. 15 June 1992. Retrieved 16 January 2023.
  13. Schafer, Susanne M. (9 October 1992). "Army drops contracts for armored vehicles". Austin American-Statesman. Associated Press. Retrieved 18 November 2021.
  14. GAO, Ch. 3, p. 18-21.
  15. 1 2 "Future of Army's 140-mm Gun in Doubt After Funds Slashed by House". Inside the Pentagon. Vol. 7, no. 24. Inside Washington Publishers. 13 June 1991. p. 16. JSTOR   43987191 . Retrieved 7 February 2022.
  16. 1 2 3 4 Bates, Kelley (29 November 1990). "Says Official From Army's Tank Command: Future Infantry Vehicle to Be Major Improvement Over Existing Bradleys". Inside the Pentagon. Vol. 6, no. 48. Inside Washington Publishers. pp. 7–8. JSTOR   43986641 . Retrieved 7 February 2022.
  17. Foss, Christopher F., ed. (1994). "Armoured Engineer Vehicles". Jane's Military Vehicles and Logistics 1994–95 (15th ed.). Surrey: Jane's Information Group. p. 17. ISBN   0-7106-1162-5.
  18. 1 2 "Dab Asm Review Postponed Due to Procedural Problem ... Army Also Releases Asm Specs for Family of Vehicles". Defense Daily. Vol. 168, no. 1. Access Intelligence. 2 July 1990. Retrieved 16 January 2023.

Sources

PD-icon.svg This article incorporates public domain material from websites or documents of the United States Army .