An asset management plan (AMP) is a tactical plan for managing an organisation's infrastructure and other assets to deliver an agreed standard of service. Typically, an asset management plan will cover more than a single asset, taking a system approach - especially where a number of assets are co-dependent and are required to work together to deliver an agreed standard of service. [1]
The International Infrastructure Management Manual [2] defines an asset management plan as; "a plan developed for the management of one or more infrastructure assets that combines multi-disciplinary management techniques (including technical and financial) over the life cycle of the asset in the most cost effective manner to provide a specific level of service."
Twofold: justification and optimization
Clearly for either of the above to work, the Standard of Service needs to be defined (in a measurable way) for each asset in an asset system.
The first part can be achieved relatively quickly, and is necessary before the decentralization of decision-making around maintenance and replacement can really occur, but the second requires ongoing work in local teams, together with better guidance from the center.
An asset management plan should take a "horses for courses" approach - not a one size fits all, but needs based - taking into account the basic information required. Beyond this, it should be built upon by the local asset manager according to local needs. A fully developed Asset Management approach usually requires a number of iterations of the AMP, and needs to be reviewed more frequently for more complex systems, especially asset systems where the average annual cost required to provide the agreed standard of service is high.
An AMP typically covers the following areas:
Description of the problem that the asset system aims to reduce. What assets are currently employed to address the problem? Essentially, why do these assets exist? What would occur if these assets didn't exist. Identify dependencies between different parts of the asset system. This is important to understand why the assets are there in the first place.
How should the above assets be performing and to what condition? Define the Standard of Service (SoS) for the various parts of the asset system or group (a simple performance specification). Describe how the system, as a whole, is intended to perform in a measurable way. Usually consists of two parts, a measurable performance specification, and a minimum condition grade (CG).
The minimum CG should take account of the potential consequences of failure i.e. a flood defence protecting an urban area that would flood to a depth of 1m should the wall fail under design conditions should have a higher minimum CG (2 or 3). An earth embankment that is only protecting agricultural land, where the consequences of failure are significantly less will likely have a lower minimum CG (4 or 5).
If further refinement is necessary, the minimum condition grade should also take into account the likely failure mechanism - if failure of an asset is likely to occur very slowly and can be monitored, then a minimum condition of 2 or 3 is unlikely to be required - a minimum of CG4 can probably be justified. Conversely an asset that is liable to a fast failure mode with little warning will likely require a higher minimum condition.
Example Standards of Service for Flood Risk Management Assets:
A. Walls: 5.2m high until chainage 540m where the height drops to 5.1m. The condition of the walls will be maintained to CG3 or better (due to urban area).
B. Culverts: under 3 carriageways, total of 120 m length (40 m each) provide conveyance for 30 m³/s without surcharging. The condition of the culverts will be maintained to CG4 or better (under a rural road with alternative routings).
C. Pump station: provides capacity of 12 m³/s to drain the catchment during periods of tide-lock (usually every high-tide, for a period of 4 hours.) The condition of the pump station will be maintained to CG2 or better (no redundancy).
D. Weir: provides a minimum water-level of 3.6 m to the watercourse above. The condition of the weir will be maintained to CG5 or better (minimal consequences of failure).
For some assets, there may be a legal obligation to maintain and operate the asset to a certain SoS.
Therefore, it is important to understand what function the assets were designed to perform, and what minimum condition is considered acceptable.
What condition are the assets currently in? List/inventory and condition of all "assets" within the system, with their unique identifiers. This could include information such as asset owner, age, estimate of remaining life etc. This is important to understand what state the assets are currently in.
A short narrative explaining the near-term actions required to bridge the gap between where we are, and where we want to be. In the case where we are already at or above the agreed SoS, this section explains how we will continue to do so for the least cost - enabling an innovative approach to providing the agreed SoS.
This is important to understand what actions are planned to bring or keep the assets above their minimum condition, and able to perform their intended function.
As a form of preventative maintenance, a replacement policy tells when to replace the asset. An age replacement policy (ARP) call for replacement of an asset at a particular age. For assets with patterns of intermittent use, a modified age replacement policy (MARP) replaces the asset close to the replacement age, but without disrupting use of the asset. [3]
What are the short, medium and longer-term costs for the asset system? A forward looking cost-profile for operating, maintaining, refurbishing and replacing to sustain the Standard of Service. Ideally the cost-profile will extend to cover the life of the longest-lived asset in the system, so as to estimate the whole-life cost, and make it possible to determine the average annual costs.
This section may need to be revisited and updated annually, and may form the basis for an annual bid for funding.
The numbers provided for the in-year (year 0) and the next three years (1 - 3), should be fairly accurate. Beyond that, estimates of costs so as to enable planning for any large expenditure items expected in the medium-term and to allow sufficient time to do a more in depth appraisal for an asset system that may require a change to the Standard of Service. Alternative management regimes should be considered to optimise the cost of providing the SoS. Where assumptions have been made, the basis for these should be provided.
This is important to understand what the planned actions are going to cost, as well as the ongoing "management" and overheads directly related to this particular asset system. Also essential from a local perspective, is optimizing the approach to providing the SoS.
Why do we want to sustain the agreed standard of service of the assets in this asset system? Without exception, assets should provide some measure of benefits that can be measured or explained. This will usually involve the translation of the standard of service into a monetary figure. Other benefits may be social or environmental, which may be difficult to quantify in monetary or quantitative terms, but some attempt to record all the relevant benefits is important, and more qualitative means may be employed.
Potential improvements to the Standard of Service: The standard of service currently delivered may be improved by acquisition, enhancement or other means. An "improvement" may also include the potential to reduce the standard of service, and potentially even dispose or divest of an asset or assets in an asset system.
These improvements represents a potential change to the standard of service and is typically managed as a project, complete with some form of appraisal of the additional expenditure, comparing different options and selecting a preferred options based on whatever decision process is appropriate.
The development and justification of a change project is outside the scope of an asset management plan.
The Queensland Department of Local Government, Sport & Recreation circulated a letter to Queensland Councils in December 2008 which specified the minimum requirements for asset management plans in Queensland. [4] These requirements include:
Section 104(6) of the Queensland Local Government Bill 2008 [5] defines a "long-term asset management plan" as a document that -
It states that a local government must annually conduct, and report on the results of, a review of the implementation of the plan.
In Canada, since 2015 the government of Ontario has mandated municipalities to develop asset management plans for their infrastructure. [6] [7]
Risk management is the identification, evaluation, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability or impact of unfortunate events or to maximize the realization of opportunities.
Cost accounting is defined by the Institute of Management Accountants as "a systematic set of procedures for recording and reporting measurements of the cost of manufacturing goods and performing services in the aggregate and in detail. It includes methods for recognizing, classifying, allocating, aggregating and reporting such costs and comparing them with standard costs". Often considered a subset of managerial accounting, its end goal is to advise the management on how to optimize business practices and processes based on cost efficiency and capability. Cost accounting provides the detailed cost information that management needs to control current operations and plan for the future.
The technical meaning of maintenance involves functional checks, servicing, repairing or replacing of necessary devices, equipment, machinery, building infrastructure, and supporting utilities in industrial, business, and residential installations. Over time, this has come to include multiple wordings that describe various cost-effective practices to keep equipment operational; these activities occur either before or after a failure.
Inventory or stock refers to the goods and materials that a business holds for the ultimate goal of resale, production or utilisation.
Facility management or facilities management (FM) is a professional management discipline focused on the efficient and effective delivery of logistics and other support services related to real property and buildings. It encompasses multiple disciplines to ensure functionality, comfort, safety and efficiency of the built environment by integrating people, place, process and technology, as defined by the International Organization for Standardization (ISO). The profession is certified through Global Facility Management Association member organizations.
Total cost of ownership (TCO) is a financial estimate intended to help buyers and owners determine the direct and indirect costs of a product or service. It is a management accounting concept that can be used in full cost accounting or even ecological economics where it includes social costs.
Predictive maintenance techniques are designed to help determine the condition of in-service equipment in order to estimate when maintenance should be performed. This approach promises cost savings over routine or time-based preventive maintenance, because tasks are performed only when warranted. Thus, it is regarded as condition-based maintenance carried out as suggested by estimations of the degradation state of an item.
In the U.S., critical infrastructure protection (CIP) is a concept that relates to the preparedness and response to serious incidents that involve the critical infrastructure of a region or the nation. The American Presidential directive PDD-63 of May 1998 set up a national program of "Critical Infrastructure Protection". In 2014 the NIST Cybersecurity Framework was published after further presidential directives.
Reliability-centered maintenance (RCM) is a concept of maintenance planning to ensure that systems continue to do what their user require in their present operating context. Successful implementation of RCM will lead to increase in cost effectiveness, reliability, machine uptime, and a greater understanding of the level of risk that the organization is managing.
Financial Management for IT Services is a Service Strategy element of the ITIL best practice framework. The aim of this ITIL process area is to give accurate and cost effective stewardship of IT assets and resources used in providing IT Services. It is used to plan, control and recover costs expended in providing the IT Services negotiated and agreed to in a service-level agreement (SLA).
Asset management is a systematic approach to the governance and realization of all value for which a group or entity is responsible. It may apply both to tangible assets and to intangible assets. Asset management is a systematic process of developing, operating, maintaining, upgrading, and disposing of assets in the most cost-effective manner.
For the application of engineering economics in the practice of civil engineering see Engineering economics.
An energy service company (ESCO) is a company that provides a broad range of energy solutions including designs and implementation of energy savings projects, retrofitting, energy conservation, energy infrastructure outsourcing, power generation, energy supply, and risk management.
Whole-life cost is the total cost of ownership over the life of an asset. The concept is also known as life-cycle cost (LCC) or lifetime cost, and is commonly referred to as "cradle to grave" or "womb to tomb" costs. Costs considered include the financial cost which is relatively simple to calculate and also the environmental and social costs which are more difficult to quantify and assign numerical values. Typical areas of expenditure which are included in calculating the whole-life cost include planning, design, construction and acquisition, operations, maintenance, renewal and rehabilitation, depreciation and cost of finance and replacement or disposal.
Corrective maintenance is a maintenance task performed to identify, isolate, and rectify a fault so that the failed equipment, machine, or system can be restored to an operational condition within the tolerances or limits established for in-service operations.
An international joint venture (IJV) occurs when two businesses based in two or more countries form a partnership. A company that wants to explore international trade without taking on the full responsibilities of cross-border business transactions has the option of forming a joint venture with a foreign partner. International investors entering into a joint venture minimize the risk that comes with an outright acquisition of a business. In international business development, performing due diligence on the foreign country and the partner limits the risks involved in such a business transaction.
Infrastructure asset management is the integrated, multidisciplinary set of strategies in sustaining public infrastructure assets such as water treatment facilities, sewer lines, roads, utility grids, bridges, and railways. Generally, the process focuses on the later stages of a facility's life cycle, specifically maintenance, rehabilitation, and replacement. Asset management specifically uses software tools to organize and implement these strategies with the fundamental goal to preserve and extend the service life of long-term infrastructure assets which are vital underlying components in maintaining the quality of life in society and efficiency in the economy. In the 21st century, climate change adaptation has become an important part of infrastructure asset management competence.
IT risk management is the application of risk management methods to information technology in order to manage IT risk, i.e.:
Infrastructure is a platform for governance, commerce, and economic growth and is "a lifeline for modern societies". It is the hallmark of economic development.
Data center management is the collection of tasks performed by those responsible for managing ongoing operation of a data center. This includes Business service management and planning for the future.