Barnsley Coal Railway

Last updated

Former trackbed under Back Lane, east of Wintersett. (2012) Disused railway passes under Back Lane (geograph 2811795).jpg
Former trackbed under Back Lane, east of Wintersett. (2012)

The Barnsley Coal Railway was a short railway which, when fully opened, ran between Stairfoot Junction, on the Mexborough to Barnsley line of the South Yorkshire Railway (SYR) and a triangular junction at Nostell on the line of the West Riding and Grimsby Railway (WR&GR).

Contents

The railway rights were purchased by the SYR in July 1863, just one year before that company was absorbed into the Manchester, Sheffield and Lincolnshire Railway.

Scheduled passenger services on the lined ended in 1930, and goods services in 1961.

History

Railway Clearing House diagram of 1911 showing the line Bierley, Cudworth, Monk Bretton, Nostell, Shafton & Stairfoot RJD 109.jpg
Railway Clearing House diagram of 1911 showing the line
Barnsley Coal Railway Act 1861
Act of Parliament
Royal Coat of Arms of the United Kingdom (variant 1, 1952-2022).svg
Citation 24 & 25 Vict. c. clxv

In the parliamentary session of 1860–61 an act was applied for to incorporate a company, and construct a line from a junction with the South Yorkshire Railway (SYR) west of Ardsley railway station to Crigglestone. [1] The Barnsley Coal Railway Act 1861 (24 & 25 Vict. c. clxv) was passed, allowing the creation of the Barnsley Coal Railway, with £40,000 of capital allowed to be raised by share issue, and £13,000 by loans. The first permitted section of line was from Stairfoot (west of Ardsley in Darfield) to Applehaigh (in Notton), 4 miles (6.4 km) long. [2] [3] [4]

The South Yorkshire Railway Act 1863 (26 & 27 Vict. c. 146) was passed allowing the South Yorkshire Railway, which had subscribed £10,000 of the railway's capital, to take over the company. [5] [6] [2]

The South Yorkshire Railway Act 1864 (27 & 28 Vict. c. 19) was obtained allowing a short 1+14-mile (2 km) extension to the Midland Railway's line near Barnsley; [2] [7] [8] [9] the new chord would have enabled the South Yorkshire company to take advantage of their recently acquired running powers to Wakefield and Leeds over the Midland's lines. [10] This connecting line was not built.[ clarification needed ] [11]

The first section line served Rosa Colliery, and opened to traffic in January 1870.[ citation needed ]

In the session of 1873–74 the SYR's successor the Manchester, Sheffield and Lincolnshire Railway (MS&LR) obtained powers in the Manchester, Sheffield and Lincolnshire Railway Act 1874 (37 & 38 Vict. c. 132) to build an extension from near the 1860s terminus at Notton, to a two way junction with the West Riding and Grimsby Railway north-west of Nostel station; also sought were powers for a junction from the line to the Midland's line near to the Barnsley Canal; [note 1] and a second junction from Coal railway to SYR's Barnsley line, creating an extended triangular junction to that line. [12] [13]

The second section was opened for goods traffic in August 1882. This section ran from Applehaigh to a triangular junction with the West Riding and Grimsby Railway (WR&GR) at Nostell. The line included passenger stations at Staincross and Mapplewell, Notton and Royston and Ryhill, later renamed Ryhill and Wintersett. A passenger service commenced on 1 September 1882.

Regular passenger services were withdrawn in 1930, goods services in 1961. [14]

Train services

The passenger service on the line was part of a Leeds Central to Barnsley Court House service via Wakefield Westgate. The July 1922 issue of Bradshaw's Railway Guide shows five trains in each direction on Mondays to Fridays, six trains on Saturday from Barnsley to Leeds and seven on Saturday from Leeds to Barnsley. There was no Sunday service.

Notes

  1. North-west of Royston and Notton railway station, and at the site of the (future) Royston junction.

Related Research Articles

<span class="mw-page-title-main">Great Central Railway</span> British pre-grouping railway company (1897–1922)

The Great Central Railway in England was formed when the Manchester, Sheffield and Lincolnshire Railway changed its name in 1897, anticipating the opening in 1899 of its London Extension. On 1 January 1923, the company was grouped into the London and North Eastern Railway.

<span class="mw-page-title-main">Great Northern Railway (Great Britain)</span> British railway company, 1846 to 1922

The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.

<span class="mw-page-title-main">Manchester, Sheffield and Lincolnshire Railway</span> Former British railway company

The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed in 1847 when the Sheffield, Ashton-under-Lyne and Manchester Railway joined with authorised but unbuilt railway companies, forming a proposed network from Manchester to Grimsby. It pursued a policy of expanding its area of influence, especially in reaching west to Liverpool, which it ultimately did through the medium of the Cheshire Lines Committee network in joint partnership with the Great Northern Railway and the Midland Railway.

<span class="mw-page-title-main">Cheshire Lines Committee</span> Railway in England: active from 1863 to 1947

The Cheshire Lines Committee (CLC) was formed in the 1860s and became the second-largest joint railway in Great Britain. The committee, which was often styled the Cheshire Lines Railway, operated 143 miles (230 km) of track in the then counties of Lancashire and Cheshire. The railway did not become part of the Big Four during the implementation of the 1923 grouping, surviving independently with its own management until the railways were nationalised at the beginning of 1948. The railway served Liverpool, Manchester, Stockport, Warrington, Widnes, Northwich, Winsford, Knutsford, Chester and Southport with connections to many other railways.

<span class="mw-page-title-main">Hull and Barnsley Railway</span> British pre-grouping railway company

The Hull Barnsley & West Riding Junction Railway and Dock Company (HB&WRJR&DCo.) was opened on 20 July 1885. It had a total projected length of 66 miles but never reached Barnsley, stopping a few miles short at Stairfoot. The name was changed to The Hull and Barnsley Railway (H&BR) in 1905. Its Alexandra Dock in Hull opened 16 July 1885.

<span class="mw-page-title-main">Hallam Line</span> Railway line in Yorkshire, England

The Hallam Line is a railway connecting Leeds and Sheffield via Castleford in the West Yorkshire Metro area of northern England. It is a slower route from Leeds to Sheffield than the Wakefield line. Services on this line are operated by Northern Trains. Services from Leeds to Nottingham also use the line.

The Ashton, Stalybridge and Liverpool Junction Railway was opened in 1846 to connect the industrial town of Ashton-under-Lyne to the developing railway network, and in particular to the port of Liverpool. It was a short line, joining the Manchester and Leeds Railway at Miles Platting and the connection to Liverpool was over that line and the Liverpool and Manchester Railway.

<span class="mw-page-title-main">Sheffield and Rotherham Railway</span>

The Sheffield and Rotherham Railway was a railway line in England, between the named places. The North Midland Railway was being promoted but its route was planned to go through Rotherham and by-pass Sheffield, so the S&RR was built as a connecting line. It opened in 1838. In Sheffield it opened a terminal station at Wicker, and in Rotherham at Westgate. When the NMR opened in 1840 a connecting curve was made between the two routes.

<span class="mw-page-title-main">Rotherham Central station</span> Railway station and tram stop in Rotherham, South Yorkshire, England

Rotherham Central railway station is in Rotherham, South Yorkshire, England. The station was originally named "Rotherham", becoming "Rotherham and Masborough" in January 1889 and finally "Rotherham Central" on 25 September 1950.

<span class="mw-page-title-main">Barnsley Court House railway station</span> Disused railway station in South Yorkshire, England

Barnsley Court House railway station was a railway station in Barnsley, South Yorkshire, England. It closed in 1960.

The South Yorkshire Railway was a railway company with lines in the West Riding of Yorkshire, England.

<span class="mw-page-title-main">South Yorkshire Junction Railway</span> Disused railway in Yorkshire, England

The South Yorkshire Junction Railway was a railway which ran from Wrangbrook Junction on the main line of the Hull and Barnsley Railway to near Denaby Main Colliery Village, South Yorkshire. It was nominally an independent company sponsored by the Denaby and Cadeby Colliery Company but was worked by the Hull and Barnsley Railway.

<span class="mw-page-title-main">Stairfoot railway station</span> Disused railway station in South Yorkshire, England

Stairfoot railway station was a railway station on the South Yorkshire Railway's main line between Mexborough and Barnsley. It was situated between Wombwell Central and Barnsley. The station was intended to serve the communities of Ardsley and Stairfoot, South Yorkshire, England.

<span class="mw-page-title-main">West Riding and Grimsby Railway</span>

The West Riding and Grimsby Railway was a railway company that promoted a line between Wakefield and Doncaster, in Yorkshire, England. There was also a branch line connection from Adwick le Street to Stainforth, which gave access towards Grimsby. The company was promoted independently, but it was sponsored by the Manchester, Sheffield and Lincolnshire Railway and the Great Northern Railway, and became jointly owned by them.

<span class="mw-page-title-main">Stockport, Timperley and Altrincham Junction Railway</span>

The Stockport, Timperley and Altrincham Junction Railway (ST&AJR) was authorised by an Act of Parliament, passed on 22 July 1861 to build a 8 miles 17 chains (13.2 km) railway from Stockport Portwood to Altrincham.

<span class="mw-page-title-main">Notton and Royston railway station</span> Former railway station in England

Notton and Royston railway station was a railway station that served the village of Royston, South Yorkshire, England. It was situated on the Barnsley Coal Railway between Staincross and Mapplewell and Ryhill.

The Trent, Ancholme and Grimsby Railway was a railway line in north Lincolnshire which commenced at an end on junction with the South Yorkshire Railway where that railway crossed the River Trent near the village of Gunhouse. This was known as Gunhouse Junction but the village has become known as "Gunness". The line ran for about 14 miles (22.5 km) through Frodingham to Wrawby Junction near Barnetby and included railway stations at Appleby, and Elsham. The line also included two branches to Gunness and Gunhouse Wharf on the River Trent. The line was opened on 1 October 1866.

The Hull and Doncaster Branch is a secondary main railway line in England, connecting Kingston upon Hull to South Yorkshire and beyond via a branch from the Selby Line near Gilberdyke to a connection to the Doncaster–Barnetby line at a junction near Thorne 8 miles north-east of Doncaster.

The Sheffield, Rotherham, Barnsley, Wakefield, Huddersfield and Goole Railway was an early British railway company. The company obtained an act in 1846 for 26 miles of railway, with a main section from Wakefield to Doncaster via Barnsley.

The Great Northern Railway developed an extensive network over time, having started in 1846 with the intention of connecting London and York, as well as other major Yorkshire towns. The Great Northern Railway in Yorkshire was a major part of that, although the GNR did not succeed in reaching York as it originally intended. By acquiring running powers it reached Leeds, Bradford and Halifax over other companies' lines, as well as Barnsley Sheffield and Grimsby, and then York too. After acquiring local companies it developed a network, chiefly in West Yorkshire. Later it built lines north and west of Bradford into hilly terrain, and these were very expensive to build, and never repaid the initial cost.

References

  1. "Barnsley Coal Railway. (Incorporation of Company for making Railway from South Yorkshire Railway to Crigglestone; Powers to South Yorkshire Railway Company.)", London Gazette (22450): 4505–4506, 23 November 1860
  2. 1 2 3 Bradshaw's Railway Manual 1866, p. 274.
  3. Barnsley Coal Railway Act 1861 (24 & 25 Vict. c. 165); An Act to authorize the Construction of a Railway in the West Riding of Yorkshire, to be called "The Barnsley Coal Railway".
  4. Ordnance Survey Sheets 274SE, 274NE, 262SE
  5. "South Yorkshire Railway. (Alteration of Line to Thorne, and continuation of Branch from that Line ; Arrangements with North-Eastern Railway Company, and with Manchester, Sheffield, and Lincolnshire Railway Company; Purchase of Barnsley Coal Railway; Level Crossing of Long Sandall Road).", The London Gazette: 5472–, 18 November 1862
  6. South Yorkshire Railway Act 1863 (26 & 27 Vict. c. 146); An Act to enable the South Yorkshire Railway and River Dun Company to alter their authorized Line; to purchase the Barnsley Coal Railway; and for other Purposes relating to the same Company.
  7. Rickards 1864, p. 543, "The South Yorkshire Railway Act, 1864.".
  8. "South Yorkshire Railway. (Branch to, and Running Powers over, Midland Railway).", London Gazette (22791): 5768–5769, 24 November 1863
  9. South Yorkshire Railway Act 1864 (27 & 28 Vict. c. 19); An Act to enable the South Yorkshire Railway and River Dun Company to extend their Railway to the Midland Railway at Barnsley.
  10. Sheardown, William (1965), Doncaster in 1864, p. 28
  11. See Ordnance Survey Sheets 274NE
  12. "Manchester, Sheffield, and Lincolnshire Railway (Additional Powers.) (Construction of new Railways in the counties of York, Nottingham, Derby, and Chester; consequential powers as to Compulsory Purchase of Lands; Purchase of Additional Lands by Compulsion and Agreement; Diversion of River Tame; Stopping up .and Diversion of Roads and Streets; Confirmation of Purchase, and Appropriation of Lands; Application of Funds Sale and Disposition of Lauds; Purchase by and vesting in the Company of Widues Railway; Dissolution of Widnes Railway Company; Release of Deposit Money, and Construction of New Road in Widnes; Vesting in the Company of Macclesfield, Knutsford and Warrington Railway; Deviation, Abandonment and alteration of levels of portions of that Railway; Revival of Powers for compulsory Purchase of Lands, and Extension of Time for completion of Works; Power to subscribe towards Hull Docks, and appoint Directors; Power to the Company, and North Staffordshire Railway Company, to subscribe to-undertaking of Macclesfield Committee; Additional Capital; Consolidation of Ordinary Guaranteed and Preference Stocks; Enlargement of Powers as to Superfluous Lands Power to Manchester, South Junction and Altrincham Railway Company to acquire additional Lands at Altrincham; Amendment of Acts, and other purposes.)", London Gazette (24037): 5210–5215, 21 November 1873
  13. Manchester, Sheffield and Lincolnshire Act 1874 (37 & 38 Vict. c. 132); An Act for authorizing the Manchester, Sheffield, and Lincolnshire Railway Company to make new Branch Railways and other Works; for Vesting in them the undertakings of the Macclesfield, Knutsford, and Warrington Railway Company and the Widnes Railway Company; for conferring upon them additional powers; and for other purposes.
  14. Speller.

Sources