Barnsley Canal

Last updated

Barnsley Canal
Barnsley Canal in Haw Park Woods.jpg
The canal in Haw Park Woods near Wakefield
Specifications
Length14.5 miles (23.3 km)
Maximum boat length 84 ft 0 in (25.60 m)
(originally 66 ft 0 in or 20.12 m)
Maximum boat beam 14 ft 0 in (4.27 m)
Locks17
StatusRestoration proposed
History
Original ownerBarnsley Canal Company
Principal engineerSamual Hartley
Date of act1793
Date of first use1799
Date completed1802
Date closed1893, 1946
Geography
Start pointBarnsley
End pointHeath Common
Branch ofAire and Calder Navigation
Connects toDearne and Dove Canal
Barnsley Canal
BSicon uCONTgq.svg
BSicon ugFABZq+lr.svg
BSicon uCONTfq.svg
Aire and Calder Navigation
BSicon gFGATEd.svg
Heath lock
BSicon gFGATEd.svg
Agbrigg bottom lock
BSicon gSKRZ-Au.svg
A638 road
BSicon gFGATEd.svg
Agbrigg top lock
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
railway
BSicon guENDExe.svg
watered section
BSicon ugENDExa.svg
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
railway
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
railway
BSicon uABZmgLl +g.svg
BSicon uLSTR+r.svg
Possible Walton Bypass
BSicon ugLOCKSd.svg
BSicon uLSTR.svg
Walton locks (7)
BSicon gSKRZ-Yu.svg
BSicon uLSTR.svg
B6378 Shay Lane, Walton
BSicon ugLOCKSd.svg
BSicon uLSTR.svg
Walton locks (5)
BSicon gSTR+l.svg
BSicon uLSTRq.svg
BSicon gSTRr.svg
BSicon uLSTRr.svg
BSicon guENDExe.svg
watered section
BSicon ugENDExa.svg
BSicon gTEEnl.svg
BSicon uRESRr.svg
BSicon uRESRr.svg
Cold Hiendley and Wintersett Resrs
BSicon guENDExe.svg
BSicon PUMPHOUSE.svg
Ryhill pumping station
BSicon uexSTR.svg
watered section
BSicon uexSKRZ-Yu.svg
B6428 Midland Rd, Royston
BSicon ugENDExa.svg
BSicon uLSTR.svg
BSicon gSTRl.svg
BSicon gSTR+r.svg
BSicon uLSTR.svg
BSicon gSTR.svg
Manor Bakery diversion
BSicon uLSTRl.svg
BSicon guKRZL.svg
BSicon uLSTR+r.svg
BSicon gSTR.svg
BSicon uLSTR.svg
Glassworks aqueduct diversion
BSicon uABZmg+Ll +g.svg
BSicon uLSTRr.svg
BSicon gFABZgl+l.svg
BSicon uLSTRq.svg
New Dearne and Dove junction
BSicon geuKRZo.svg
River Dearne aqueduct
BSicon guENDExe.svg
BSicon uexSTR+l.svg
BSicon uexFABZqlr.svg
BSicon gCONTfq.svg
Dearne and Dove Canal
BSicon ugENDExa.svg
BSicon ugWHRF.svg
Barnsley Wharf
BSicon guENDExe.svg
BSicon ugENDExa.svg
BSicon guENDExe.svg
Smithies
BSicon ugENDExa.svg
BSicon ugLOCKSd.svg
Barugh locks (5)
BSicon gSKRZ-Bu.svg
M1 motorway embankment
BSicon gKHSTe.svg
Barnby basin

The Barnsley Canal is a canal that ran from Barnby Basin, through Barnsley, South Yorkshire, England, to a junction with the Aire and Calder Navigation near Wakefield, West Yorkshire. It was built in the 1790s, to provide a transport link from coal reserves at Barnsley to a wider market. Both the Aire and Calder Navigation and the River Don Navigation took a keen interest in the project, the former buying many of the initial shares, and the latter constructing the Dearne and Dove Canal to link the canal to their waterway. Water supply issues meant that the Aire and Calder proposed pumping all of the water for the canal from the River Calder, using steam pumps, but a reservoir was built at Cold Hiendley instead, increasing the construction costs, but reducing the running costs. The canal as built was 14.5 miles (23.3 km) long and included 15 locks.

Contents

Traffic came initially from the colliery at Barnby Furnace, but this failed in 1806, and the company found itself with no money and little traffic. Gradually, tramways to other mines were built, and traffic increased, enough to pay dividends to the shareholders from 1810 onwards. Many bridges were raised between 1828 and 1830, to accommodate larger barges. Railways arrived in the area in the 1840s, and traffic volumes decreased rapidly, but the canal was taken over by the Aire and Calder Navigation in 1856, and despite competition from the railways, and structural damage from subsidence, remained profitable until 1942. The locks below Cold Hiendley were lengthened between 1879 and 1881, and the final section including the five Barugh locks was closed in 1893.

A major breach occurred in 1911, resulting in the canal being closed for nearly a year, and further breaches occurred in 1945 and 1946. The Aire and Calder applied to abandon the canal in 1947, and despite protestations from the fledgling Inland Waterways Association, the right to do so was granted in 1953. The aqueduct over the River Dearne was demolished immediately. The Barnsley Canal Group was formed in 1984, to campaign for restoration, eventually becoming the Barnsley, Dearne and Dove Canal Trust in June 2000. They are now part of the Barnsley Canal Consortium, which has commissioned a study which showed that restoration is feasible. A restored route would involve three diversions from the historic route, at Walton locks, near Cold Hiendley reservoir, and where the canal crosses the River Dearne.

History

The early 1790s were a time when there was an increasing demand for coal, but a shortage in many places because much of the coal being produced was being consumed by industries close to the mines. There were coal reserves near Barnsley, but no transport links to distribute it to the region. In July 1792, the Aire and Calder Canal Company asked William Martin, who was the manager of the canal, to prepare plans for a link from near Wakefield to the Barnsley mines. Hearing of the plans, the River Don Navigation Company proposed an alternative, which involved the canalisation of the River Dearne, to reach the same destination. The Aire and Calder scheme foresaw a healthy trade in coal and manufactured goods from Barnsley to the Aire and Calder, and agricultural lime from Knottingley in the reverse direction. [1]

Martin and the Aire and Calder's resident engineers surveyed the route, and at a public meeting held on 20 September 1792, the canal engineer William Jessop suggested that the line from just below Wakefield to Barnsley and Silkstone could be built for approximately £50,000. The Aire and Calder decided to subscribe £20,000 for shares, to ensure that they held a majority shareholding. A further meeting in mid-October reported that the cost was now £60,000, and that 86 people had subscribed to it. The River Don company attended the meeting, as they were keen to use the Barnsley to Silkstone route for their Dearne and Dove Canal, but an agreement was reached, whereby the Barnsley Canal company would build the Barnby to Barnsley section, but no water would be taken from the River Dearne, which was needed to supply the Dearne and Dove canal. A 2.5-mile (4.0 km) branch from Barugh to Haigh Bridge, including an extra seven locks, was added to the scheme. [2]

The Aire and Calder proposed to pump all the water for the canal from the River Calder, using steam-driven pumps at Agbrigg, Walton and Barugh. The Haigh branch would have required a fourth engine, but the Haigh furnace closed and the branch was never built. The pumps at Walton and Agbrigg were replaced by a reservoir at Cold Hiendley, which increased the construction costs by £3,000, but reduced running costs by £350 per year. [3] An Act of Parliament was obtained on 3 June 1793, which created the company and authorised them to raise £72,000 by the issuing of shares, with an additional £25,000 by shares or by mortgage if it was required. [4] The Dearne and Dove canal was authorised on the same day. [5]

Construction

Construction work started on 27 September 1793, at Heath Common, near the junction with the Aire and Calder Canal. Samual Hartley was the engineer, and John Pinkerton was contracted to build the canal. Construction was difficult, with Pinkerton unexpectedly encountering rock in the cutting at Cold Hiendley, and inflation pushed up the costs. There were disputes between Hartley and Pinkerton, which lasted until long after the canal was opened, and were finally settled in 1812, after a lawsuit. The northern section to Barnsley opened on 8 June 1799, while the Barnsley to Barnby section was not started until late 1798, and did not open until early 1802. The Dearne and Dove Canal was completed in late 1804. [6]

The cost of construction was £95,000. The original scheme envisaged a number of tramways to connect to the coal mines, but none of these were built initially. Major engineering features included a five-arched aqueduct where the canal crossed the River Dearne, a long cutting at Cold Hiendley, five locks at Barugh, another twelve at Walton, two at Agbrigg and the final one near Heath. This lock was situated at the end of a cut, which frequently filled with rubbish, and so it was replaced in 1816 by a new lock much closer to the Aire and Calder. [7] The Wintersett reservoir covered an area of 80 acres (32 ha) when first built, which increased to 127 acres (51 ha) when its banks were raised by 4 feet (1.2 m) [4] in 1807. In 1803, a pumping station was built at Ryhill, using a Cornish beam engine obtained from Harveys of Hayle, which pumped surplus water from the canal up into the reservoir. [8] Land for a second reservoir at Cold Hiendley was obtained in 1840, and it was built in 1854. It was located between Wintersett Reservoir and the canal, but was at a lower level, and the pumping station was modified so that water could also be pumped from the new reservoir into the canal. The Cold Hiendley reservoir was enlarged to cover 55 acres (22 ha) in 1874. [9] The beam engine, which was probably second-hand in 1803, gave good service and lasted until the closure of the canal in 1946. [8]

Traffic

Looking south near Walton Bridge over Barnsley Canal.jpg
Looking south near Walton

The canal was principally designed to carry coal from collieries in the Barnby region. The Low Moor Company had a colliery at Barnby Furnace, and constructed the 0.5-mile (0.80 km) long Low Moor Waggonway between there and Barnby basin, which was carrying coal by 1802. By 1804, around 10,000 tons was leaving the colliery, although the Dearne and Dove Canal had opened in late 1803, and only about half of the trade travelled the full length of the canal to the Aire and Calder. Coal from the Silkstone collieries was sporadic, as the tramway which had been authorised by the Act of Parliament was not built due to financial constraints. The Barnby Furnace mine failed in May 1807, [10] and the company found itself with no money and little traffic. It obtained a new Act of Parliament on 28 March 1808, authorising it to raise another £43,000 in share capital, and £10,000 by mortgage. They were also able to raise the tolls. [4]

The Silkstone Waggonway was completed in 1810. Barnby basin was enlarged to cope with the expected trade, which grew steadily. Coal accounted for just 23 per cent of the 22,270 tons carried in 1800, but had risen to 109,945 tons out of a total of 181,063 tons by 1821. The other main cargoes were corn and limestone. Receipts also rose, from £2,028 in 1803 to 7,649 in 1821, the latter figure being supplemented by a further £2,094 raised from tramway tolls. Profits were sufficient to pay dividends from 1810. In order to keep the boats moving, the Barnsley Canal Company attempted to take water from the River Dearne on several occasions, and were ordered to remove the works which diverted the water by the River Don Navigation Company, who had sponsored the Dearne and Dove Canal. A compromise was reached in 1812, which allowed some of the Dearne water to be used by the Barnsley canal. [11] Between 1828 and 1830, a number of bridges were raised, to allow larger vessels, called "Billy-boys", to use the canal. [12]

Competition

At Walton, the towpath forms part of the Trans Pennine Trail Barnsley Canal near Overtown.jpg
At Walton, the towpath forms part of the Trans Pennine Trail

Competition in the form of railways started to affect the canal from the 1840s. The canal company initially welcomed some of the schemes, but the Don Navigation Company proposed to lease the canal for a year in 1845 and then to buy it, in order to prevent the railways gaining access to the Silkstone coal resources, and to protect the water supplies. They quickly offered to pass the canal on to the Aire and Calder Company, and to buy the Dearne and Dove Canal, but although they took over the Dearne and Dove Canal from 1 January 1846, they dropped their ideas for the Barnsley Canal. The Barnsley Canal Company then tried to arrange a lease with the Aire and Calder, but negotiations foundered. [1] A series of negotiations took place with the Yorkshire Railway Company, the Manchester, Sheffield and Lincolnshire Railway and the Aire and Calder Navigation between 1846 and 1853. It was not until 1854 that the company finally agreed to a lease from the Aire and Calder, by which time traffic was falling rapidly. The takeover was ratified by an Act of Parliament in 1856, although the Barnsley Canal Company was not wound up, as it continued to collect the rent from the lease. [13]

By reducing tolls, the Aire and Calder managed to increase traffic from 179,295 tons in 1855 to 291,313 tons in 1863, but traffic gradually reduced after that, as railway links to the coalfields were built. The canal structures were increasingly affected by subsidence from the mining, and an inspection of the aqueduct in 1866 revealed "fissures in the rock and cracks in the arches". In 1870, Barnsley Corporation ordered the canal company to stop extracting water from the River Dearne, as they needed the supply. Faced with a dilemma, the Barnsley and the Aire and Calder companies negotiated, and the result was the Barnsley Canal Transfer Act of 1871, which authorised the takeover of the canal by the Aire and Calder, the replacing of ten of the twelve Walton locks by an inclined plane, and protection of the water supply at Barugh. [14]

The locks below Cold Hiendley were lengthened from 66 feet (20 m) to 84 feet (26 m) between 1879 and 1881, but by this time there was little traffic on the upper section. [15] The final 1.3-mile (2.1 km) section to Barnby, including the five locks at Barugh were abandoned under the terms of the Aire and Calder Act 1893. [16] Powers to build the inclined plane were renewed in 1889, but no construction took place. Despite railway competition, the canal still carried in excess of 200,000 tons per year between 1885 and 1909. [17]

Decline

Looking southeast along the canal and towpath below Hiendley Reservoir Barnsley Canal and towpath.jpg
Looking southeast along the canal and towpath below Hiendley Reservoir

A major breach of the canal occurred on 20 November 1911, when subsidence caused part of the aqueduct and the adjacent embankment to fail. Repairs were not completed until 10 July 1912, when the canal was reopened. The canal had to close for four months at the end of 1922 due to drought conditions. In 1934, the County Council installed an electric lift bridge at Royston. Traffic continued to fall, and maintenance costs increased as the effects of subsidence damaged the infrastructure, but the canal remained profitable until 1942. The following year, the Royston bridge was operated 856 times to allow boats to pass. Mottram Wood colliery was flooded on 13 June 1945, when another leak occurred near the aqueduct, and in 1946, 53 million imperial gallons (240,000 m3) of water escaped from the canal on 22 November, flooding a housing estate and the surrounding countryside. The Aire and Calder applied to abandon the canal in May 1947, [17] and although the fledgeling Inland Waterways Association campaigned for its retention, the Docks and Inland Waterways Executive (DIWE) expressed "grave doubts as to whether it would be in the national interest to reinstate the waterway." The DIWE then offered compensation to carriers who were affected by the closure, [18] and the abandonment order was finally granted in 1953. The aqueduct was demolished immediately, as it was deemed to be unsafe. [19]

Restoration

The line of the canal below Barugh has remained largely intact, and in April 1984, the Barnsley Canal Group was formed, with the aim of campaigning for the restoration of the canal. [20] Their first task was to undertake a detailed survey of the canal, to confirm that restoration was at least realistic. [21] Having become a Limited Company and obtaining charitable status in April 1991, the group reformed as the Barnsley, Dearne and Dove Canal Trust in June 2000. In May 2001, the Barnsley Canal Consortium, [20] consisting of a working group which includes local authorities, the Inland Waterways Association and the Canal Trust, was formed. The Consortium employed professional engineers to carry out a feasibility study on the reopening of both the Barnsley Canal and the Dearne and Dove Canal in August 2004, and the report, which was published in November 2006 [22] confirmed that restoration was possible. [23]

The restored canal would follow the original line from the Aire and Calder Navigation to Barnsley, where a new marina would be built near to the location of Barugh locks. Three diversions would be required, one at the foot of the Walton locks, one near Cold Hiendley reservoir, and one where the canal crosses the River Dearne, where the original aqueduct has been demolished. [24]

In 2019, a public enquiry about Barnsley Metropolitan District Council's local plan was held, at which the council recommended that a firm line for the restored canal should not be included, and this decision was upheld by the inspector. In the light of this, the lack of new members, and the impact of the coronavirus pandemic, the Trust took the decision to cease operation in April 2020, although the AGM at which the decision would be ratified was postponed due to the pandemic. They are expected to transfer their assets to the Chesterfield Canal Trust, who will also ensure that the Trust website is maintained as a source of information for some years. [25]

In 2020, a local resident from Redbrook called James Crampton set up a Facebook group called Barnsley Old Canal during the Coronavirus lockdown, where people could share their stories of the canal. Within a few months, over 450 people had registered an interest in maintaining the canal's heritage. Before long, people started to think about restoration, and the group have decided that their first objective should be improvements to the towpath between Barugh Green and Smithies. [26]

Points of interest

See also

Bibliography

Related Research Articles

<span class="mw-page-title-main">Lancaster Canal</span> Canal in Northwest England

The Lancaster Canal is a canal in North West England, originally planned to run from Westhoughton in Lancashire to Kendal in south Cumbria. The section around the crossing of the River Ribble was never completed, and much of the southern end leased to the Leeds and Liverpool Canal, of which it is now generally considered part.

<span class="mw-page-title-main">Calder and Hebble Navigation</span> Inland waterway in West Yorkshire, England

The Calder and Hebble Navigation is a broad inland waterway, with locks and bridgeholes that are suitable for 14-foot-wide (4.3 m) boats, in West Yorkshire, England. Construction to improve the River Calder and the River Hebble began in 1759, and the initial scheme, which included 5.7 miles (9.2 km) of new cuts, was completed in 1770 and has remained navigable since it was opened. Significant improvements were made, including the Salterhebble branch to Halifax, opened in 1828, and ever-longer cuts to bypass river sections. Trade was assisted by the opening of the Rochdale Canal in 1804, which provided a through route from Sowerby Bridge to Manchester. There were plans to abandon the river sections completely in the 1830s, but these were modified as the needs of mill owners and other riparian landowners were recognised.

<span class="mw-page-title-main">Aire and Calder Navigation</span> Canal in West Yorkshire, England

The Aire and Calder Navigation is the canalised section of the Rivers Aire and Calder in West Yorkshire, England. The first improvements to the rivers above Knottingley were completed in 1704 when the Aire was made navigable to Leeds and the Calder to Wakefield, by the construction of 16 locks. Lock sizes were increased several times, as was the depth of water, to enable larger boats to use the system. The Aire below Haddlesey was bypassed by the opening of the Selby Canal in 1778. A canal from Knottingley to the new docks and new town at Goole provided a much shorter route to the River Ouse from 1826. The New Junction Canal was constructed in 1905, to link the system to the River Don Navigation, by then part of the Sheffield and South Yorkshire Navigation.

<span class="mw-page-title-main">Sheffield and South Yorkshire Navigation</span> System of navigable inland waterways in South Yorkshire and Lincolnshire, England

The Sheffield and South Yorkshire Navigation (S&SY) is a system of navigable inland waterways in South Yorkshire and Lincolnshire, England.

<span class="mw-page-title-main">History of the British canal system</span> Building, use, decline and restoration of artificial waterways in the United Kingdom

The canal network of the United Kingdom played a vital role in the Industrial Revolution. The UK was the first country to develop a nationwide canal network which, at its peak, expanded to nearly 4,000 miles in length. The canals allowed raw materials to be transported to a place of manufacture, and finished goods to be transported to consumers, more quickly and cheaply than by a land based route. The canal network was extensive and included feats of civil engineering such as the Anderton Boat Lift, the Manchester Ship Canal, the Worsley Navigable Levels and the Pontcysyllte Aqueduct.

<span class="mw-page-title-main">Canals of the United Kingdom</span> Network of inland waterways

The canals of the United Kingdom are a major part of the network of inland waterways in the United Kingdom. They have a varied history, from use for irrigation and transport, through becoming the focus of the Industrial Revolution, to today's role of recreational boating. Despite a period of abandonment, today the canal system in the United Kingdom is again increasing in use, with abandoned and derelict canals being reopened, and the construction of some new routes. Canals in England and Wales are maintained by navigation authorities. The biggest navigation authorities are the Canal & River Trust and the Environment Agency, but other canals are managed by companies, local authorities or charitable trusts.

<span class="mw-page-title-main">Bradford Canal</span> English canal

The Bradford Canal was a 3.5-mile (5.6 km) English canal which ran from the Leeds and Liverpool Canal at Shipley into the centre of Bradford. It opened in 1774, and was closed in 1866, when it was declared to be a public health hazard. Four years later it reopened with a better water supply, and closed for the second time in 1922. It was subsequently filled in, although consideration has been given to restoring it. There are some remains, including a short section of canal at the junction and a pumping station building, which is now a dwelling.

<span class="mw-page-title-main">Huddersfield Broad Canal</span> Navigation canal in West Yorkshire, England

The Huddersfield Broad Canal or Sir John Ramsden's Canal, is a wide-locked navigable canal in West Yorkshire in northern England. The waterway is 3.75 miles (6 km) long and has 9 wide locks. It follows the valley of the River Colne and connects the Calder and Hebble Navigation at Cooper Bridge junction with the Huddersfield Narrow Canal near Aspley Basin in Huddersfield.

<span class="mw-page-title-main">Dearne and Dove Canal</span> Canal in South Yorkshire, England

The Dearne and Dove Canal ran for almost ten miles through South Yorkshire, England from Swinton to Barnsley through nineteen locks, rising 127 feet (39 m). The canal also had two short branches, the Worsbrough branch and the Elsecar branch, both about two miles long with reservoirs at the head of each. The Elsecar branch also has another six locks. The only tunnel was bypassed by a cutting in 1840.

<span class="mw-page-title-main">Rochdale Canal</span> Trans-Pennine navigable channel in northern England

The Rochdale Canal is in Northern England, between Manchester and Sowerby Bridge, part of the connected system of the canals of Great Britain. Its name refers to the town of Rochdale through which it passes.

<span class="mw-page-title-main">Sheffield & Tinsley Canal</span> United Kingdom legislation

The Sheffield & Tinsley Canal is a canal in the City of Sheffield, England. It runs 3.9 miles (6.3 km) from Tinsley, where it leaves the River Don, to the Sheffield Canal Basin in the city centre, passing through 11 locks. The maximum craft length that can navigate this lock system is 61 feet 6 inches (18.75 m) with a beam of 15 feet 6 inches (4.72 m).

<span class="mw-page-title-main">New Junction Canal</span> Canal in South Yorkshire, England

The New Junction Canal is a canal in South Yorkshire, England. It is part of the Sheffield and South Yorkshire Navigation (S&SYN), although it was jointly funded by the Aire and Calder Navigation, and was opened in 1905. It links the River Don Navigation and the Stainforth and Keadby Canal with the Aire and Calder Navigation. It is completely straight, and was the last canal built in England for commercial purposes.

<span class="mw-page-title-main">Yorkshire Ring</span>

The Yorkshire Ring is a canal ring in South and West Yorkshire, England. It was completed in 1905 with the construction of the New Junction Canal. It lasted for under thirty years before the closure of part of the Dearne and Dove Canal and subsequently the complete Barnsley Canal. Both these canals are currently under restoration.

<span class="mw-page-title-main">Stainforth and Keadby Canal</span> Canal in Yorkshire and Lincolnshire, England

The Stainforth and Keadby Canal is a navigable canal in South Yorkshire and Lincolnshire, England. It connects the River Don Navigation at Bramwith to the River Trent at Keadby, by way of Stainforth, Thorne and Ealand, near Crowle. It opened in 1802, passed into the control of the River Don Navigation in 1849, and within a year was controlled by the first of several railway companies. It became part of the Sheffield and South Yorkshire Navigation, an attempt to remove several canals from railway control, in 1895. There were plans to upgrade it to take larger barges and to improve the port facilities at Keadby, but the completion of the New Junction Canal in 1905 made this unnecessary, as Goole could easily be reached and was already a thriving port.

<span class="mw-page-title-main">Engine Arm</span> Historic English industrial canal

The Engine Arm or Birmingham Feeder Arm near Smethwick, West Midlands, England, is a short canal which was originally part of a feeder tunnel for a pumping engine. When the Smethwick flight of locks were reduced from six to three, the pumping engine was moved to a new site, which allowed part of the feeder tunnel to be opened up and made navigable, so that coal supplies for the engine could be delivered by barge. The Engine Arm also supplied the pumped water to the 473-foot (144 m) Wolverhampton level of the lowered summit. The arm was extended between 1825 and 1830 by Thomas Telford to carry water from Rotton Park Reservoir to the Old Main Line of the BCN Main Line Canal, and the Engine Arm Aqueduct was inserted to carry it over the new main line constructed at that time, which was 20 feet (6.1 m) lower. The arm is now managed by the Canal and River Trust and the basin beyond the site of the pumping station, which was replaced by a new engine house near Brasshouse Lane bridge in 1892, is used for residential moorings.

<span class="mw-page-title-main">Selby Canal</span> Canal with 2 locks in Yorkshire, England

The Selby Canal is a 6-mile (9.7 km) canal with 2 locks which bypasses the lower reaches of the River Aire in Yorkshire, England, from the village of West Haddlesey to the town of Selby where it joins the River Ouse. It opened in 1778, and provided the main outlet for the Aire and Calder Navigation until 1826, when it was bypassed by a new cut from Ferrybridge to Goole. Selby steadily declined after that, although traffic to York still used the canal.

<span class="mw-page-title-main">North Pennine Ring</span>

The North Pennine Ring is a canal ring which crosses the Pennines between Manchester, Leeds and Castleford. It follows parts of five canals, and shares much of its route with the Outer Pennine Ring, which uses a different route for the southern crossing of the Pennines.

<span class="mw-page-title-main">River Don Navigation</span> Waterway navigation in South Yorkshire, England

The River Don Navigation was the result of early efforts to make the River Don in South Yorkshire, England, navigable between Fishlake and Sheffield. The Dutch engineer Cornelius Vermuyden had re-routed the mouth of the river in 1626, to improve drainage, and the new works included provision for navigation, but the scheme did not solve the problem of flooding, and the Dutch River was cut in 1635 to link the new channel to Goole. The first Act of Parliament to improve navigation on the river was obtained in 1726, by a group of Cutlers based in Sheffield; the Corporation of Doncaster obtained an Act in the following year for improvements to the lower river. Locks and lock cuts were built and by 1751 the river was navigable to Tinsley.

<span class="mw-page-title-main">River Dove, Barnsley</span> River in South Yorkshire, England

The River Dove is a river that extends through the Low Valley in Barnsley, England. It flows from Worsbrough Reservoir to its confluence with the River Dearne.

The Silkstone Waggonway was a narrow-gauge industrial wagonway serving the Barnsley Canal, in England, at Silkstone in South Yorkshire.

References

  1. 1 2 Hadfield 1972 , p. 169
  2. Hadfield 1972 , pp. 170–171
  3. Hadfield 1972 , p. 171
  4. 1 2 3 Priestley 1831 , pp. 52–55
  5. Hadfield 1972 , p. 173
  6. Hadfield 1972, pp. 173–174.
  7. Hadfield 1972, p. 174.
  8. 1 2 Ware 1989 , pp. 5–8
  9. "History of the Barnsley Canal". Barnsley, Deare and Dove Canal Trust. Archived from the original on 18 June 2020. Retrieved 10 December 2008.
  10. Silkstone Waggonway, South Yorkshire: Survey Report (PDF). Vol. 1. Yorkshire Archaeological Trust. August 2012. Archived from the original (PDF) on 11 March 2016. Retrieved 10 August 2019.
  11. Hadfield 1972 , pp. 176–180
  12. Hadfield 1972 , pp. 181–182
  13. Hadfield 1973 , pp. 399–402
  14. Hadfield 1973 , pp. 406–407
  15. Hadfield 1973 , p. 408
  16. Russell 1982 , p. 235
  17. 1 2 Hadfield 1973 , pp. 408–409
  18. Squires 2008 , pp. 25–26
  19. Hadfield 1973 , p. 409
  20. 1 2 "The Trust: Potted History". Barnsley, Dearne and Dove Canal Trust. Archived from the original on 23 January 2009. Retrieved 10 December 2008.
  21. Squires 2008 , p. 114
  22. "The Trust: Introduction". Barnsley, Dearne and Dove Canal Trust. Archived from the original on 23 January 2009. Retrieved 10 December 2008.
  23. "The Canals: Restoration". Barnsley, Dearne and Dove Canal Trust. Archived from the original on 23 January 2009. Retrieved 10 December 2008.
  24. "Local map of proposed route". Barnsley, Dearne and Dove Canal Trust. Archived from the original on 3 March 2016. Retrieved 10 December 2008.
  25. "Closure of the Trust" (PDF). Barnsley, Dearne and Dove Canal Trust. 28 April 2020. Archived (PDF) from the original on 18 June 2020.
  26. Shepherd 2020.

Commons-logo.svg Media related to Barnsley Canal at Wikimedia Commons

Canals on the Yorkshire Ring - anticlockwise from the north