Westport Canal | |
---|---|
Specifications | |
Locks | 1 + a flood gate |
Status | Derelict |
History | |
Original owner | Parrett Navigation Company |
Principal engineer | William Gravatt |
Date of act | 1836 |
Date of first use | 1840 |
Date closed | 1875 |
Geography | |
Start point | Westport |
End point | Muchelney |
Branch of | River Parrett |
The Westport Canal was built in the late 1830s to link Westport and Langport in Somerset, England. It was part of a larger scheme involving improvements to the River Parrett above Burrow Bridge. Langport is the point at which the River Yeo joins the River Parrett and the intention was to enable trade via the port at Bridgwater. [1] It remained in use until the 1870s, but closed when the Somerset Drainage Commissioners took over control of the River Parrett. Despite a petition against closure by local people, the Commissioners ruled that navigation of the canal must cease due to their interpretation of the Act which gave them control of it, leaving the canal to serve as a drainage channel since 1878.
The channel has survived to the modern day due to its drainage function, and many of the structures associated with the canal can still be seen. A number of them are on the listed building register because of their historic importance. There is some interest in improving the canal for its amenity value.
By the 1830s, the village of Westport was well-connected to the surrounding area, as a result of turnpike road construction in 1753, 1759 and 1823. The roads linked Westport to Ilminster and Chard, which were also on the planned route of the Chard Canal. Although that canal would link the towns to Taunton, those planning the Westport Canal made approaches to the Chard Canal proprietors about the possibility of a link from Westport to the new canal, but this was rejected. [2]
Against this background, and having engaged Isambard Kingdom Brunel as engineering consultant, the construction of the Westport Canal was authorised by an Act of Parliament obtained in 1836. The Act gave the newly formed Parrett Navigation Company powers to raise £10,500 by the issuing of shares, and an additional £3,300 from a mortgage if required. [3] The canal was part of a bigger scheme; the act authorised improvements to the River Parrett between Burrow Bridge and Langport, rebuilding of the river bridge at Langport, which had obstructed navigation up-river from there for many years, and construction of the canal to Westport. [4] [5] The scheme was supported by two local landowners, the Trevillian family and the Combe family, and so obtaining land for the route was not difficult. [6]
On Brunel's recommendation, the engineer for the whole scheme was William Gravatt, who had previously worked with Brunel on the Bristol and Exeter Railway, and he was assisted locally by Charles Hodgkinson. The cost of the initial work on the River Parrett exceeded the budget, and a second Act of Parliament was obtained in 1839, to allow the company to raise another £20,000 and to increase the tolls. Local merchants sought to oppose the increase by opposing the bill, but Benjamin Lovibond, who was acting for them at the House of Commons, produced a petition, which was investigated by a Select Committee and found to be forged. [7]
The route from Langport followed the River Parrett to its junction with the River Isle. Here a lock was built, to maintain the water levels on the River Isle, and about one mile (1.6 km) further upstream, the 2.3-mile (3.7 km) canal turned off towards Westport, where five wharfs and a basin were built. A half lock at the junction protected the canal from high river levels. [6] Gravatt is known to have designed an innovative set of flood gates as part of the project, which were described as "self-acting". [8] The canal was officially opened on 20 May 1839, but there were complains about water levels from some of the merchants, and further work was required to remove shoals in the river section. [6] The project was completed in 1840, and was initially profitable. [4] The Westport terminus gained two warehouses, a coal yard owned by Stukey and Bagehot, and a manager's office. Despite the opening of the Chard canal in 1842, Stukey and Bagehot's boats alone paid tolls on 10,402 tons of goods in 1843. [6] The main cargoes were coal, which was brought to the villages served by the canal, and grain, which was exported via the canal. [9] Other cargoes included incoming timber, which was stored in one of the warehouses for seasoning, together with outgoing stone and reeds. [10]
However, competition arrived in the form of the Durston to Yeovil Railway, started in 1847 and completed in 1853. [4] The six years prior to 1853 had all shown receipts in excess of £1,400, but these had dropped to £673 by 1857 and £347 by 1871. [11] Major clearance work to remove reeds and mud was required in 1858, which caused the canal to trade at a loss. A railway through Ilminster and Chard opened in 1866, [12] and trade continue to move from the canal to the railway. In 1875 there was flooding in Westmoor, and local landowners opened Langport Lock on the River Parrett, as the company could not afford to repair a broken culvert which carried drainage water under the river. With the lock open, no tolls could be charged, and the Somersetshire Drainage Bill was amended to allow the Somerset Drainage Commissioners to take over the whole of the River Parrett Navigation at no cost. The Bill became an Act of Parliament on 1 July 1878. Although the Act made provision for closing any of the navigations which came under their control, they took it to mean that all navigations must be closed. Users of the Westport Canal presented a petition requesting that the canal be retained in 1880, but were instructed that the Drainage Commissioners had no powers to allow this to happen. [13] The canal was effectively abandoned as a navigation from 1875, [4] and used as a drain for the Somerset levels from 1878. [5]
The canal still contains water, and can be navigated by light craft such as canoes, which can be portaged at Midelney lock. Some refurbishment of the canal was carried out by Wessex Water Authority in the 1970s. [14] Midelney lock is derelict, and the Westmoor Lane bridge at Hambridge has been lowered. [5] The bridge at the entrance to Westport wharfs has been refurbished, [15] as have the terminal warehouse buildings. [2] There is local interest in improving the canal as an amenity, and possibly the restoration of navigation for small boats. [9]
Westport Canal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The canal terminated at Westport, and there are a number of structures which have survived. The square, 3-storey warehouse which was built in 1836 and fronted onto the basin is grade II listed, although part of it is now used as a house. [16] The timber store, which was also built in 1836, has found new use as an industrial workshop, [17] while two semi-detached cottages, used by canal workers, still occupy a site near the canal basin entrance. [18] The bridge at the basin entrance, which carries a track called Barrington Broadway over the canal, was built of lias and ham stone with a single segmental arch. [19] A little further downstream, an almost identical bridge carries Knighton Drove over the canal. [20] The B3168 Westport to Curry Rivel road has run along the west bank since Westport, but soon the road and canal part. A footbridge carries the towpath over to the east bank, and the canal passes to the east of Hambridge. [21]
Near Hambridge, the towpath crosses back to the west bank, after which Westmoor bridge crosses. This has been lowered, and would prevent navigation. A little before the River Isle joins from the west, Middlemoor bridge carries the towpath back onto the east bank, where it remains until Midelney Bridge, another grade II listed structure, [22] which carries a minor road to Midelney Manor, a grade I listed house built on what was once an island owned by Muchelney Abbey. Much of it is sixteenth century, with some nineteenth century additions. [23] Below the bridge, the Southmoor main drain runs parallel to the channel, with the towpath sandwiched between the two on the western bank. Finally it reaches the derelict Midelney lock. Close by is Midelney pumping station, which was built in the 1960s [24] at the head of Westmoor main drain.
Point | Coordinates (Links to map resources) | OS Grid Ref | Notes |
---|---|---|---|
River Parrett Junction | 51°00′32″N2°49′55″W / 51.009°N 2.832°W | ST417235 | Rivers Isle and Parrett |
Midelney Lock | 51°00′29″N2°50′02″W / 51.008°N 2.834°W | ST416234 | disused |
Westport Canal start | 51°00′00″N2°51′00″W / 51.000°N 2.850°W | ST404226 | Junction with River Isle |
Westmoor bridge | 50°59′24″N2°51′11″W / 50.990°N 2.853°W | ST401215 | lowered |
Westport wharfs | 50°58′30″N2°52′41″W / 50.975°N 2.878°W | ST384194 |
The River Parrett flows through the counties of Dorset and Somerset in South West England, from its source in the Thorney Mills springs in the hills around Chedington in Dorset. Flowing northwest through Somerset and the Somerset Levels to its mouth at Burnham-on-Sea, into the Bridgwater Bay nature reserve on the Bristol Channel, the Parrett and its tributaries drain an area of 660 square miles (1,700 km2) – about 50 per cent of Somerset's land area, with a population of 300,000.
The Bridgwater and Taunton Canal is a canal in the south-west of England between Bridgwater and Taunton, opened in 1827 and linking the River Tone to the River Parrett. There were a number of abortive schemes to link the Bristol Channel to the English Channel by waterway in the 18th and early 19th centuries. These schemes followed the approximate route eventually taken by the Bridgwater and Taunton Canal, but the canal was instead built as part of a plan to link Bristol to Taunton by waterway.
The River Tone is a river in the English county of Somerset. The river is about 33 kilometres (21 mi) long. Its source is at Beverton Pond near Huish Champflower in the Brendon Hills, and is dammed at Clatworthy Reservoir. The reservoir outfall continues through Taunton and Curry and Hay Moors, which are designated as a Site of Special Scientific Interest. Finally, it flows into the River Parrett at Burrowbridge.
The Huddersfield Broad Canal or Sir John Ramsden's Canal, is a wide-locked navigable canal in West Yorkshire in northern England. The waterway is 3.75 miles (6 km) long and has 9 wide locks. It follows the valley of the River Colne and connects the Calder and Hebble Navigation at Cooper Bridge junction with the Huddersfield Narrow Canal near Aspley Basin in Huddersfield.
The Chard Canal was a 13.5 miles (21.7 km) tub boat canal in Somerset, England, that ran from the Bridgwater and Taunton Canal at Creech St. Michael, over four aqueducts, through three tunnels and four inclined planes to Chard. It was completed in 1842, was never commercially viable, and closed in 1868. The major engineering features are still clearly visible in the landscape.
The Glastonbury Canal ran for approximately 14 miles (23 km) through two locks from Glastonbury to Highbridge in Somerset, England, where it entered the River Parrett and from there the Bristol Channel. The canal was authorised by Parliament in 1827 and opened in 1834. It was operated by the Glastonbury Navigation and Canal Company. Most of it was abandoned as a navigation in 1854, when a railway was built along the towpath.
Aller is a village and parish in Somerset, England, situated 5 miles (8.0 km) west of Somerton on the A372 road towards Bridgwater. The village has a population of 410. The parish includes the hamlet of Beer and the deserted medieval village of Oath on the opposite bank of the River Parrett.
The Leven Canal runs for 3.18 miles (5.1 km) from the River Hull to the village of Leven, East Riding of Yorkshire, England. It was built for Mrs Charlotta Bethell in 1805, and remained in use until 1935. It is now a Site of Special Scientific Interest.
The Louth Navigation was a canalisation of the River Lud. It ran for 11 miles (18 km) from Louth in Lincolnshire, England, to Tetney Haven, at the mouth of the Humber. It was authorised by act of Parliament in 1763 and completed in 1770, under the supervision of the engineer John Grundy Jr. and then by James Hoggard. Eight locks were required to overcome the difference in altitude, six of which were constructed with sides consisting of four bays.
Langport is a town and civil parish in Somerset, England, 5 miles (8 km) west of Somerton. The parish, which covers only part of the town, has a population of 3,578. Langport is contiguous with Huish Episcopi, a separate parish that includes much of the town's outskirts.
The Nottingham Canal is a canal in the English counties of Nottinghamshire and Derbyshire. As built, it comprised a 14.7-mile (23.7 km) long main line between the River Trent just downstream of Trent Bridge in Nottingham and Langley Mill in Derbyshire. At the same time as the main line of the canal was built by its proprietors, the separate Trent Navigation Company built the Beeston Cut, from the main line at Lenton in Nottingham to rejoin the River Trent upstream of Nottingham, thus bypassing the difficult section of navigation through Trent Bridge. The section of the main line between Trent Bridge and Lenton, together with the Beeston Cut, is still in use, forming part of the navigation of the River Trent and sometimes referred to as the Nottingham & Beeston Canal. The remainder of the main line of the canal beyond Lenton has been abandoned and partially filled.
The Shrewsbury Canal was a canal in Shropshire, England. Authorised in 1793, the main line from Trench to Shrewsbury was fully open by 1797, but it remained isolated from the rest of the canal network until 1835, when the Birmingham and Liverpool Junction Canal built the Newport Branch from Norbury Junction to a new junction with the Shrewsbury Canal at Wappenshall. After ownership passed to a series of railway companies, the canal was officially abandoned in 1944; many sections have disappeared, though some bridges and other structures can still be found. There is an active campaign to preserve the remnants of the canal and to restore the Norbury to Shrewsbury line to navigation.
The Driffield Navigation is an 11-mile (18-kilometre) waterway, through the heart of the Holderness Plain to the market town of Driffield, East Riding of Yorkshire, England. The northern section of it is a canal, and the southern section is part of the River Hull. Construction was authorised in 1767, and it was fully open in 1770. Early use of the navigation was hampered by a small bridge at Hull Bridge, which was maintained by Beverley Corporation. After protracted negotiation, it was finally replaced in 1804, and a new lock was built to improve water levels at the same time. One curious feature of the new works were that they were managed quite separately for many years, with the original navigation called the Old Navigation, and the new works called the New Navigation. They were not fully amalgamated until 1888.
The Sheffield & Tinsley Canal is a canal in the City of Sheffield, England. It runs 3.9 miles (6.3 km) from Tinsley, where it leaves the River Don, to the Sheffield Canal Basin in the city centre, passing through 11 locks. The maximum craft length that can navigate this lock system is 61 feet 6 inches (18.75 m) with a beam of 15 feet 6 inches (4.72 m).
The Selby Canal is a 6-mile (9.7 km) canal with two locks, which bypasses the lower reaches of the River Aire in Yorkshire, England, from the village of West Haddlesey to the town of Selby where it joins the River Ouse. It opened in 1778, and provided the main outlet for the Aire and Calder Navigation until 1826, when it was bypassed by a new cut from Ferrybridge to Goole. Selby steadily declined after that, although traffic to York still used the canal.
The River Isle flows from its source near Combe St Nicholas, through Somerset, England and discharges into the River Parrett south of Langport near Midelney.
The Ivelchester and Langport Navigation was a scheme to make the River Ivel navigable from Langport to Ilchester, in Somerset, England. Work started in 1795, but the scheme was effectively bankrupt by 1797, and construction of the locks was never completed.
The Parrett Navigation Company was formed to improve river navigation on the River Parrett, Ivelchester and Langport Navigation and linked waterways. Tolls were introduced to pay for the improvements. It was a trading company owned by Vincent Stuckey and Walter Bagehot.
The Port of Bridgwater is a port, originally located in the town of Bridgwater, Somerset, England. Created under the Bridgwater Navigation and Quays Act 1845 it extends from Brean Down to Hinkley Point in Bridgwater Bay, and parts of the rivers Parrett, River Brue and River Axe. Although no ships now dock in the town, in 2001 103,613 (metric) tonnes of cargo were handled within the area of the Port Authority, most of which were stone products through the wharf at Dunball.
The River Sow Navigation was a short river navigation in Staffordshire, England, which connected the Staffordshire and Worcestershire Canal to the centre of Stafford. There was a coal wharf in Stafford, and a single lock to connect it to the canal. It opened in 1816, and closed in the 1920s. There are proposals to restore the navigation as the Stafford Riverway Link.
Media related to Westport Canal at Wikimedia Commons