The Bethesda branch line was a 4+14-mile (6.8 km) railway branch line between Bangor and Bethesda in Gwynedd, North Wales. Its primary purpose was to bring quarried slate down to the main line for onward transport.

Contents

It opened in July 1884, and a local passenger service was run as well as trains for the mineral traffic.

Intense road competition led to the cessation of ordinary passenger services in 1951; goods traffic and occasional passenger excursion journeys kept the line going until its complete closure in July 1962.

Conception

The Bethesda branch line in 1887 Bethesda-branch.png
The Bethesda branch line in 1887

The Chester and Holyhead Railway opened its main line in 1850. Its main objective was to convey the Irish mail traffic, and at the time intermediate traffic was expected to be insignificant.

Quarrying was a significant industry in Bethesda: the local quarries were known as Penrhyn Quarry, and they were served by a narrow gauge line, the Penrhyn Railway, opened in 1801. The slate was conveyed to Port Penrhyn, immediately east of Bangor for onward transport to market. The Penrhyn line had inclined planes. In 1852 a standard gauge line was built in partial substitution for the narrow gauge line. [1] [2]

Bethesda was situated on Thomas Telford’s road to Holyhead, so road communication was already unusually good for the early period. [3]

A line was proposed in 1866 for a line between Bangor and Llanberis through Bethesda, but it failed in Parliament. A similar scheme for a narrow gauge line was put forward in 1871 but it too failed.

Nevertheless there was local demand for a standard gauge railway connection, and a branch line from a junction with the Chester and Holyhead line near Bangor was authorised by Parliament on 6 August 1880. [1] By now the Chester and Holyhead Railway had been absorbed into the London and North Western Railway.

Opening

The line was duly built by the LNWR and opened for passenger traffic on 1 July 1884, [1] and for goods trains on 1 September 1885. [2]

1895 passenger service

Bradshaw’s Guide for 1895 shows the passenger trains service: there were four trains each way weekdays, with an additional later train each way on Saturdays. [4]

The passenger train service was six trains each way daily, but railmotors were introduced in 1908 and the service was increased to 16 daily, 9 on Sunday by the 1930s.

After 1923

In 1923 the main line railways of Great Britain were grouped in to one or other of four new, large concerns, under the Railways Act 1921. The LNWR was a constituent of the new London Midland and Scottish Railway. In 1948 a further restructuring took place, when the four railways including the branch were nationalisation under the Transport Act 1947, and combined into British Railways.

After World War II the passenger use of the line had reduced considerably; more convenient buses to Bangor used the Telford road, and passenger trains were withdrawn on 3 December 1951. Occasional excursions ran after that date, as the area had a certain beauty, but the line closed completely on 7 October 1963. [1] [3] [2]

Topography

Bethesda Branch Line
BSicon dCONTgq.svg
BSicon dBHFq.svg
BSicon eABZq+r.svg
BSicon dCONTfq.svg
Bangor
BSicon d.svg
BSicon exhbKRZWae.svg
Cegin Viaduct
over Afon Cegin
BSicon uexSTR+l.svg
BSicon exmKRZo.svg
BSicon uexdCONTfq.svg
BSicon uexLSTR.svg
BSicon exHST.svg
BSicon d.svg
Felin Hen Halt
BSicon uexLSTR.svg
BSicon exHST.svg
BSicon d.svg
Tregarth
BSicon uexSTRl.svg
BSicon exmKRZu.svg
BSicon uexdCONTfq.svg
Penrhyn Quarry Railway
BSicon d.svg
BSicon exTUNNEL1.svg
Tregarth Tunnel
BSicon d.svg
BSicon exhbKRZWae.svg
Ogwen Bridge
over Afon Ogwen
BSicon d.svg
BSicon exKHSTe.svg
Bethesda

The line climbed all the way from the main line, rising for much of the way at 1 in 40. [2]

Tregarth Tunnel was on the line, just below Bethesda. It is 279 yd (255 m) in length. [5]

Location list: all stations opened 1 July 1884; closed 3 December 1951:

Related Research Articles

<span class="mw-page-title-main">Bethesda, Gwynedd</span> Human settlement in Wales

Bethesda is a town and community on the River Ogwen and the A5 road on the edge of Snowdonia, in Gwynedd, north-west Wales. It is the fifth-largest community in Gwynedd.

<span class="mw-page-title-main">Bangor railway station (Wales)</span> Railway station in Gwynedd, Wales

Bangor railway station is a railway station in Bangor, Gwynedd, operated by Transport for Wales Rail. The station, which is 24+34 miles (40 km) east of Holyhead, is the last mainland station on the North Wales Coast line between Crewe and Holyhead. It is the busiest in terms of passenger numbers in North Wales, as it serves the community around Caernarfon and further west, it is close to the Snowdonia National Park and Bangor University, and has an interchange with bus services to the various towns and villages of northern/western Gwynedd and Anglesey.

<span class="mw-page-title-main">Penrhyn Quarry Railway</span> Railway line

The Penrhyn Quarry Railway was a narrow gauge railway in Caernarfonshire, Wales. It served the Penrhyn quarry near Bethesda, taking their slate produce to Port Penrhyn, near Bangor. The railway was around six miles (9.7 km) long and used a gauge of 1 ft 10+34 in.

<span class="mw-page-title-main">Shrewsbury and Birmingham Railway</span>

The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.

<span class="mw-page-title-main">Rhyl railway station</span> Railway station in Denbighshire, North Wales

Rhyl railway station is on the Crewe to Holyhead North Wales Coast Line and serves the holiday resort of Rhyl, Wales.

<span class="mw-page-title-main">Prestatyn railway station</span> Railway station in Denbighshire, Wales

Prestatyn railway station on the North Wales Coast Line serves the town of Prestatyn in North Wales.

The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland, as well as ordinary railway objectives. Its construction was hugely expensive, chiefly due to the cost of building the Britannia Tubular Bridge over the Menai Strait. The company had relied on Government support in facilitating the ferry service, and this proved to be uncertain. The company opened its main line throughout in 1850. It relied on the co-operation of other railways to reach London, and in 1859 it was absorbed by the London and North Western Railway.


The Mold and Denbigh Junction Railway was a railway company that built a 15+34-mile (25.3 km) railway line in North Wales. It formed a link between the Mold Railway and the Vale of Clwyd Railway towards Rhyl.

The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.

<span class="mw-page-title-main">Tregarth</span> Human settlement in Wales

Tregarth is a village near Thomas Telford's A5 London to Holyhead road between the town of Bethesda and the city of Bangor in Gwynedd, north Wales. It is in Llandygai Community. It had a population of over 1,300 as of the 2011 census..

The Anglesey Central Railway was a 17.5-mile (28.2 km) standard-gauge railway in Anglesey, Wales, connecting the port of Amlwch and the county town of Llangefni with the North Wales Coast Line at Gaerwen. Built as an independent railway, the railway opened in portions from 1864 to 1867. Due to financial troubles the railway was sold to the London and North Western Railway in 1876, which invested significantly in the infrastructure. Operation continued under various companies during the 20th century, but passenger services were withdrawn in 1964 as part of the Beeching Axe. Industrial freight services continued until 1993. The railway's tracks remain and local groups have demonstrated an interest in restoring services as a heritage railway.

The Vale of Clwyd Railway (VoCR) was a standard-gauge line which connected the towns of Rhyl and Denbigh via St Asaph in North Wales.

The Bangor and Carnarvon Railway was a railway company promoted to build a branch railway connecting Caernarfon with the main line at Bangor, in north-west Wales. It opened in 1852 as far as Port Dinorwic and was extended to Caernarfon later in the same year.

<span class="mw-page-title-main">Shrewsbury and Chester Railway</span> Former railway company

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.

The Holywell branch line was a railway branch line in North Wales that connected Holywell with the North Wales Coast Line at Holywell Junction. Holywell had quite a large amount of mineral resources and the branch line was built originally as a mineral railway. When the local industry declined, the line fell into disuse, but it was reopened as a tourist passenger line in 1912. Road competition made the railway non-viable and this then cauded the line to be closed in 1954.

The Mold Railway was a railway company that built a line in north-east Wales. The line linked Mold to Chester and it opened on 14 August 1849. The company built a mineral branch line to Ffrith, opened in November 1849. Mold itself was an important regional centre, and contained considerable mineral resources.

The Dyserth branch line was a short standard-gauge mineral railway between the northern end of the Clwydian Range at Dyserth and the North Wales Coast Line at Prestatyn. The line was constructed by the London and North Western Railway in 1869; it was built to carry quarried stone and coal. The rise of tourism led to the introduction of a passenger service in 1905. There were stations at Dyserth and Meliden, and basic halts were built at other stopping places. Competition from road transport led to the passenger service being withdrawn in 1930. With the eventual demise of all the mineral industries around Dyserth the entire line was closed in September 1973.

<span class="mw-page-title-main">Blaenau Ffestiniog North railway station</span> Disused railway station in Gwynedd, Wales

Blaenau Ffestiniog North was the London and North Western Railway's (LNWR's) second passenger station in Blaenau Ffestiniog, then in Merionethshire, now in Gwynedd, Wales.

<span class="mw-page-title-main">Blaenau Ffestiniog passenger stations</span>

North west Wales experienced a slate boom in the first half of the nineteenth century. Three sites stood out as experiencing the most explosive growth: Dinorwic near Llanberis, Penrhyn near Bethesda and Blaenau Ffestiniog.

The Llandudno branch line is a three-mile railway branch to the town from the main line at Llandudno Junction, Wales. It was opened in 1858, and it encouraged the development of the town as a tourist and holiday destination. Due to the popularity of the town, the station facilities at Llandudno station were progressively improved. Deganwy, on the branch line, was for some time a useful port.

References

  1. 1 2 3 4 Peter E Baughan, A Regional History of the Railways of Great Britain: volume 11: North and Mid Wales, David St John Thomas, 1991, Nairn, ISBN   0946537 59 3, pages 110 to 112
  2. 1 2 3 4 Bill Rear, From Chester to Holyhead: the Branch Lines, Oxford Publishing Company, Hersham, 2003, ISBN   0 86093 569 8, pages 129 to 135
  3. 1 2 Rex Christiansen, Forgotten Railways: North and Mid Wales, David St John Thomas, 1984, ISBN   0-946537-05-4, pages 97 and 98
  4. Bradshaw's Rail Times for Great Britain and Ireland: December 1895, reprint, Middleton Press, Midhurst, 2018, ISBN   978 1 908174 11 6
  5. Tregarth Tunnel on Subterranea Britannica
  6. Michael Quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, 2002