Big Hill

Last updated
Looking west, 1890. Safety Switch No. 1 and its uphill spur are shown foreground and right; the truss bridge under the rear of the train, now known as the "Old Bridge", survives as a tourist attraction Big Hill CPR.jpg
Looking west, 1890. Safety Switch No. 1 and its uphill spur are shown foreground and right; the truss bridge under the rear of the train, now known as the "Old Bridge", survives as a tourist attraction
Panorama of the tunnels from the west, 1908 Spiral Tunnels 1908 Kodak.jpg
Panorama of the tunnels from the west, 1908

The Big Hill on the Canadian Pacific Railway main line in British Columbia, Canada, was the most difficult piece of railway track on the CPR's route. [1] It was in the rugged Canadian Rockies west of the Continental Divide of the Americas and Kicking Horse Pass. Even though the Big Hill was replaced by the Spiral Tunnels in 1909, the area has long been a challenge to the operation of trains and remains so to this day. [2]

Contents

Construction

To complete the Pacific railway as quickly as possible, a decision was made to delay blasting a lengthy 1,400-foot (430 m) tunnel through Mount Stephen and instead build a temporary 8-mile (13 km) line over it. Instead of the desired 2.2% grade (116 feet to the mile) a steep 4.5% (some sources say 4.4%) grade was built in 1884. [3] This was one of the steepest adhesion railway lines anywhere. (4.5% = 1 in 22). It descended from Wapta Lake to the base of Mount Stephen, along the Kicking Horse River to a point just west of Field, then rose again to meet the original route.

Seen as a temporary solution, this grade was twice the percentage normally allowed for a downhill track. The first construction train to go down the pass ran away off the hill to land in the Kicking Horse River, killing three. [4] [5] The CPR soon added three safety switches (runaways) on the way down to protect against runaway trains. The switches led to short spurs with a sharp reverse upgrade and they were kept in the uphill position until the operator was satisfied that the train descending the grade towards him was not out of control. Speed was restricted to 8 miles per hour (13 km/h) for passenger trains and 6 miles per hour (9.7 km/h) for freight, and elaborate brake testing was required of trains prior to descending the hill. Nevertheless, disasters occurred with dismaying frequency.

Field was created as a work camp solely to accommodate the CPR's need for additional locomotives to be added to trains about to tackle the Big Hill. Here a stone roundhouse with turntable was built at what was first known simply as Third Siding. In December 1884 the CPR renamed it Field after C.W. Field, a Chicago businessman who, the company hoped, might invest in the region after he had visited on a special train they had provided for him.

At that time, standard steam locomotives were 4-4-0s, capable enough for the prairies and elsewhere, but of little use on the Big Hill. Baldwin Locomotive Works was called upon to build two 2-8-0s for use as Field Hill pusher engines in 1884. At the time they were the most powerful locomotives built. Two more followed in June 1886. The CPR began building its own 2-8-0s in August 1887, and over the years hundreds more were built or bought.

Spiral Tunnels

3D model of the Spiral Tunnels and Highway 1 (black) KickingHorseModell.jpg
3D model of the Spiral Tunnels and Highway 1 (black)
Lower portal of "Number Two" tunnel. The locomotives are passing under the train they are pulling. Power exits Lower Spiral.jpg
Lower portal of "Number Two" tunnel. The locomotives are passing under the train they are pulling.

The Big Hill "temporary" line remained the main line for 25 years until the spiral tunnels were opened on September 1, 1909.

The improvement project was started in 1906, under the supervision of John Edward Schwitzer, the senior engineer of CPR's western lines. The first proposal had been to extend the length of the climb, and thus reduce the gradient, by bypassing the town of Field at a higher level, on the south side of the Kicking Horse river valley. This idea had quickly been abandoned because of the severe risk of avalanches and landslips on the valley side. Also under consideration was the extension of the route in a horseshoe loop northwards, using both sides of the valley of the Yoho River to increase the distance, but again the valley sides were found to be prone to avalanches. It was the experience of severe disruption and delay caused by avalanches on other parts of the line (such as at the Rogers Pass station, which was destroyed by an avalanche in 1899) that persuaded Schwitzer that digging spiral tunnels was the only practical but expensive way forward.

The route decided upon called for two tunnels driven in three-quarter circles into the valley walls. The higher tunnel, "number one", is 992 metres (3,250 ft) in length and runs under Cathedral Mountain, to the south of the original track. When the new line emerges from this tunnel it has doubled back, running beneath itself and 15 metres (50 ft) lower. It then descends the valley side in almost the opposite direction to its previous course before crossing the Kicking Horse River and entering Mount Ogden to the north. This lower tunnel, "number two", is 891 m (2,920 ft) in length and the descent is again about 15 metres. From the exit of this tunnel the line continues down the valley in the original direction, towards Field. The constructions and extra track effectively double the length of the climb and reduce the ruling gradient to 2.2%. The new distance between Field and Wapta Lake, where the track levels out, is 11+12 miles (18.5 km). [6]

The contract was awarded to the Vancouver engineering firm of MacDonnell, Gzowski and Company and work started in 1907. The labour force amounted to about 1000 and the cost was about $1.5 million.

Regardless of the opening of the spiral tunnels, Field Hill remained a significant challenge and it was necessary to retain the powerful locomotives at Field locomotive depot. [6] Even after the introduction of modern locomotives with dynamic braking and continuous pneumatic brakes, accidents were not eliminated. [7] There were 64 derailments between Calgary and Field between 2004 and 2019. [8]

On February 4, 2019, two of the three locomotives and 99 grain hopper railcars of westbound Canadian Pacific train 301 derailed at Mile 130.6, just outside of the western portal of Upper Spiral Tunnel. The three crew members were killed in the accident. [8]

See also

Related Research Articles

<span class="mw-page-title-main">Canadian Pacific Railway</span> Class I railroad in Canada and the United States

The Canadian Pacific Railway, also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), is a Canadian Class I railway incorporated in 1881. The railway is owned by Canadian Pacific Kansas City Limited, known until 2023 as Canadian Pacific Railway Limited, which began operations as legal owner in a corporate restructuring in 2001.

<span class="mw-page-title-main">Kettle Valley Railway</span> Former subsidiary of the Canadian Pacific Railway on British Columbia

The Kettle Valley Railway was a subsidiary of the Canadian Pacific Railway (CPR) that operated across southern British Columbia, west of Midway running to Rock Creek, then north to Myra Canyon, down to Penticton over to Princeton, Coalmont, Brookmere, Coquihalla and finally Hope where it connected to the main CPR line.

<span class="mw-page-title-main">Field, British Columbia</span> Unincorporated in British Columbia, Canada

Field is an unincorporated community of approximately 169 people located in the Kicking Horse River valley of southeastern British Columbia, Canada, within the confines of Yoho National Park. At an elevation of 1,256 m (4,121 ft), it is 27 km (17 mi) west of Lake Louise along the Trans-Canada Highway, which provides the only road access to the town. The community is named for Cyrus West Field of Transatlantic telegraph cable fame, who visited the area in 1884.

<span class="mw-page-title-main">Canadian Pacific Selkirk locomotive</span> 36 steam locomotives built for Canadian Pacific Railway

The Selkirk locomotives were 36 steam locomotives of the 2-10-4 wheel arrangement built for Canadian Pacific Railway by Montreal Locomotive Works, Montreal in Quebec, Canada.

<span class="mw-page-title-main">Rogers Pass (British Columbia)</span> Mountain pass in Canada

Rogers Pass is a high mountain pass through the Selkirk Mountains of British Columbia, but the term also includes the approaches used by the Canadian Pacific Railway (CP) and the Trans-Canada Highway. In the heart of Glacier National Park, this National Historic Site has been a tourist destination since 1886.

Field Hill is a steep portion of the mainline of the Canadian Pacific Kansas City located near Field, British Columbia. Field was created solely to accommodate the Canadian Pacific Railway's need for additional locomotives to be added to trains about to tackle both Field Hill, and the Big Hill. Here a stone roundhouse with turntable was built at what was first known simply as Third Siding. In December 1884 the CPR renamed it Field after Cyrus W. Field, a Chicago businessman who had visited recently on a special train.

<span class="mw-page-title-main">Connaught Tunnel</span> Tunnel in British Columbia, Canada

The Connaught Tunnel is in southeastern British Columbia, on the Revelstoke–Donald segment. The 5.022-mile (8.082 km) tunnel carries the Canadian Pacific Kansas City (CPKC) main line under Mount Macdonald in the Selkirk Mountains. The tunnel, opened by the Canadian Pacific Railway (CP) in 1916, replaced the previous routing over Rogers Pass.

<span class="mw-page-title-main">Bessemer and Lake Erie Railroad</span> Railroad in the United States

The Bessemer and Lake Erie Railroad was a class II railroad that operates in northwestern Pennsylvania and northeastern Ohio.

<span class="mw-page-title-main">Kicking Horse River</span> River in British Columbia, Canada

The Kicking Horse River is in the Canadian Rockies of southeastern British Columbia, Canada. The river was named in 1858, when James Hector, a member of the Palliser Expedition, reported being kicked by his packhorse while exploring the river. Hector named the river and the associated pass as a result of the incident. The Kicking Horse Pass, which connects through the Rockies to the valley of the Bow River, was the route through the mountains subsequently taken by the Canadian Pacific Railway when it was constructed during the 1880s. The railway's Big Hill and associated Spiral Tunnels are in the Kicking Horse valley and were necessitated by the steep rate of descent of the river and its valley.

<span class="mw-page-title-main">Kicking Horse Pass</span> Mountain pass in Canada, between Alberta and British Columbia

Kicking Horse Pass is a high mountain pass across the Continental Divide of the Americas of the Canadian Rockies on the Alberta–British Columbia border, and lying within Yoho and Banff national parks. Divide Creek forks onto both sides of the Continental Divide.

The Mount Macdonald Tunnel is in southeastern British Columbia, on the Revelstoke–Donald segment. This single-track 14.66-kilometre (9.11 mi) tunnel, which carries the Canadian Pacific Kansas City (CPKC) main line under Mount Macdonald in the Selkirk Mountains, handles most westbound traffic, whereas the Connaught Tunnel handles mostly eastbound. The tunnel was opened by the Canadian Pacific Railway (CP) in 1988.

<span class="mw-page-title-main">Royal Hudson</span> Canadian steam locomotive series

The Royal Hudsons are a series of semi-streamlined 4-6-4 "Hudson" type steam locomotives formerly owned and operated by the Canadian Pacific Railway (CPR) and built by Montreal Locomotive Works (MLW). The engines were built in 1937. In 1939, King George VI allowed the CPR to use the term after Royal Hudson number 2850 transported the royal train across Canada with no need of replacement. These locomotives were in service between 1937 and 1960. Four of them have been preserved. No. 2839 was used to power excursions for the Southern Railway Steam Program between 1979 and 1980. No. 2860 was used for excursion service in British Columbia between 1974 and 1999, then again between 2006 and 2010.

<span class="mw-page-title-main">Huron Central Railway</span> Railway in Ontario, Canada

The Huron Central Railway is a railway operating in northern Ontario, Canada. It is operated by Genesee & Wyoming Canada, the Canadian subsidiary of Genesee & Wyoming.

The Toronto, Grey and Bruce Railway (TG&B) was a railway company which operated in Ontario, Canada in the years immediately following the Canadian Confederation of 1867. It connected two rural counties, Grey County and Bruce County, with the provincial capital of Toronto to the east.

<span class="mw-page-title-main">1910 Rogers Pass avalanche</span>

The 1910 Rogers Pass Avalanche killed 58 men clearing a railroad line just outside of Revelstoke in Rogers Pass through the Selkirk Mountains in British Columbia on March 4, 1910. It is Canada's worst avalanche disaster.

John Edward Schwitzer was assistant chief engineer for the Canadian Pacific Railway in the early 1900s. He was known for two major projects on the CPR, both that removed costly bottlenecks on the routes.

<span class="mw-page-title-main">Canadian Pacific 29</span> Preserved CPR class A1e 4-4-0 locomotive

Canadian Pacific Railway No. 29 is a preserved Canadian A-1e class 4-4-0 steam locomotive. It was built by the Canadian Pacific's DeLorimier Shops in 1887 as locomotive No. 390, before being renumbered 277 in 1905. It was renumbered again to 29 after being rebuilt in 1912. By the 1950s, No. 29 was the youngest of three CPR 4-4-0s that were regularly used on the Norton-Chipman mixed train. After being retired from the Canadian Pacific in 1960, the locomotive was donated to the Canadian Railway Museum in Saint-Constant, Quebec for static display. In 1983, No. 29 was acquired by the Salem and Hillsborough Railway, and it was then moved to Hillsborough, New Brunswick, for further display. It was subsequently restored to operating condition for the locomotive's 100th birthday in 1987. In late 1994, No. 29 fell victim to a shed fire that would put an end to the locomotive's S&H career. Two years later, the locomotive was reacquired by the Canadian Pacific, who moved and cosmetically restored it for static display in front of their headquarters in Calgary, Alberta. In 2017, the locomotive was moved again to the CPR's new headquarters in Ogden yard. Although the locomotive is in good condition, an operational restoration on No. 29 would be expensive.

The history of the Canadian Pacific Railway dates back to 1873. Together with the Canadian Confederation, the creation of the Canadian Pacific Railway was a task originally undertaken as the "National Dream" by the Conservative government of Prime Minister John A. Macdonald. A key component of his National Policy, Macdonald was helped by Alexander Tilloch Galt, who was the owner of the North Western Coal and Navigation Company. British Columbia, a four-month sea voyage away from the East Coast, had insisted upon a land transport link to the East as a condition for joining Confederation, after initially requesting a wagon road.

References

  1. "Construction of the CPR". Old Time Trains.
  2. Lake Louise & Yoho (Map) (5 ed.). Cochrane, Alberta: Gem Trek Publishing. ISBN   1-895526-14-0.
  3. Buck (1997: 23)
  4. Graeme Pole, The Spiral Tunnels and the Big Hill: A Canadian Railway Adventure. Canmore: Altitude Publishing, 2000, p. 50
  5. Baird, Craig. "The Kicking Horse Pass". Canadian History Ehx. Retrieved 20 September 2021.
  6. 1 2 Soole, G. H (1937). "Field and the Big Hill". Factors in railway and steamship operation. Montreal: Canadian Pacific Railway. General Publicity Department. OCLC   264115110. Archived from the original on 2012-03-14. Retrieved 2011-04-27.
  7. "Runaway/Derailment Canadian Pacific Railway Train No. 353-946 Laggan Subdivision Field, British Columbia 02 December 1997: Other Occurrences" (PDF). Transportation Safety Board of Canada. 10 December 1999. p. 21. Retrieved 28 January 2018.
  8. 1 2 Feb 06, CBC News · Posted; February 6, 2019 10:35 AM MT | Last Updated. "Fatal train derailment: A closer look at what happened that tragic day | CBC News". CBC. Retrieved 2019-02-20.{{cite web}}: CS1 maint: numeric names: authors list (link)

Further reading

51°26′10″N116°24′13″W / 51.435976°N 116.403653°W / 51.435976; -116.403653