Bujagali Falls

Last updated
View of Bujagali Falls Bujagali.jpg
View of Bujagali Falls

Bujagali Falls (also spelled Budhagali) was a waterfall near Jinja in Uganda where the Nile River comes out of Lake Victoria, sometimes considered the source of the Nile. Starting November 2011, the falls were submerged by the new Bujagali Power Station.

Contents

Dam

Rafters flipping in Bujagali Falls. Flipping raft in Bujagali falls, Uganda.jpg
Rafters flipping in Bujagali Falls.

An acute electricity crisis impacted the livelihoods of millions of Ugandans and threatened the country's development. Hospitals, schools, businesses, and residences suffered daily power shortages, which have stunted Uganda's economic growth by an estimated one percent of the country's gross domestic product. The Bujagali project is a 200MW hydropower [1] facility on the Victoria Nile in Uganda that will help address the country's energy crisis. The project supports Uganda's broader development strategy, which focuses in large part on improving the investment climate to promote growth and reduce poverty.

Others say the costly dam's power will not meet the needs of the vast majority of the country's population, will drown a sacred waterfall, and could do further harm to Lake Victoria, the world's largest tropical lake. Approximately 6,800 people will be directly affected by the creation of the dam. [1]

The Bujagali 'Spirit'

The Spirit of Bujagali Bujagali-doctor.jpg
The Spirit of Bujagali

The falls are said by local residents to be the site of a spirit, called the "Spirit of Bujabald," who protects the community by performing rituals at the falls. The spirit is embodied in a man, Jjaajja Budhagali, who lives next to the falls; he is the thirty-ninth person to be the spirit. [2]

See also

Related Research Articles

<span class="mw-page-title-main">Hydropower</span> Power generation via movement of water

Hydropower, also known as water power, is the use of falling or fast-running water to produce electricity or to power machines. This is achieved by converting the gravitational potential or kinetic energy of a water source to produce power. Hydropower is a method of sustainable energy production. Hydropower is now used principally for hydroelectric power generation, and is also applied as one half of an energy storage system known as pumped-storage hydroelectricity.

<span class="mw-page-title-main">White Nile</span> River originating in Burundi or Rwanda

The White Nile is a river in Africa, one of the two main tributaries of the Nile, the other being the Blue Nile. The name comes from the clay sediment carried in the water that changes the water to a pale color.

<span class="mw-page-title-main">Jinja, Uganda</span> Place in Eastern Region, Uganda

Jinja is a city in the Eastern Region of Uganda, located on the north shore of Lake Victoria.

<span class="mw-page-title-main">Nalubaale Hydroelectric Power Station</span> Dam in Jinja

Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. Nalubaale is the Luganda name for Lake Victoria.

<span class="mw-page-title-main">Murchison Falls</span> Waterfall on the Victoria Nile in Western Region, Uganda

Murchison Falls, also known as Kabalega Falls, is a waterfall at the apex of Lake Albert on the Victoria Nile in Uganda. At the top of Murchison Falls, the Nile forces its way through a gap in the rocks, only 7 m (23 ft) wide, and tumbles 43 m (141 ft), before flowing westward into Lake Albert. The outlet of Lake Victoria sends around 300 cubic meters per second (11,000 ft³/s) of water over the falls, squeezed into a gorge less than 10 m (33 ft) wide.

<span class="mw-page-title-main">Owen Falls</span> Waterfall in Uganda

The Owen Falls was a waterfall on the White Nile in Uganda near the city of Jinja. The falls, together with the nearby Ripon Falls, were submerged in 1954 with the completion of the Nalubaale Hydroelectric Power Station. The dam that houses the power station was originally named Owen Falls Dam, but was later renamed Nalubaale Dam and the name of the power station was also changed, from Owen Falls Power Station to Nalubaale Power Station.

Bujagali may refer to:

<span class="mw-page-title-main">Rusumo Falls</span> Waterfall in Rwanda-Tanzania border

Rusumo Falls is a waterfall located on the Kagera river on the border between Rwanda and Tanzania, part of the most distant headwaters of the river Nile. The falls are approximately 15 m (49 ft) high and 40 m (130 ft) wide and have formed on Precambrian schists and quartz–phyllites.

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

The Nile Basin Initiative (NBI) is a partnership among the Nile riparian states that “seeks to develop the river in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security”. The NBI began with a dialogue among the riparian states that resulted in a shared vision objective “to achieve sustainable socioeconomic development through the equitable utilization of, and benefit from, the common Nile Basin water resources." It was formally launched in February 1999 by the water ministers of nine countries that share the river: Egypt, Sudan, Ethiopia, Uganda, Kenya, Tanzania, Burundi, Rwanda, the Democratic Republic of Congo (DRC), as well as Eritrea as an observer. From its beginning the Nile Basin Initiative has been supported by the World Bank and by other external partners. The World Bank has a mandate to support the work of the NBI, as lead development partner and as administrator of the multi-donor Nile Basin Trust Fund. One of the partners is the "Nile Basin Discourse", which describes itself as "a civil society network of organisations seeking to achieve positive influence over the development of projects and programmes under the Nile Basin Initiative".

<span class="mw-page-title-main">Bujagali Hydroelectric Power Station</span> Power station in Uganda

The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake; the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 October 2012 by Ugandan President Yoweri Museveni and Aga Khan IV in the presence of African politicians and investors.

<span class="mw-page-title-main">Kiira Hydroelectric Power Station</span> Power station in Uganda

Kiira Hydroelectric Power Station, is a hydroelectric power station in Uganda, with an installed capacity of 200 megawatts (270,000 hp).

Nyagak Power Station is a 3.5 megawatts (4,700 hp) mini hydroelectric power plant in Uganda.

Kimaka is a neighborhood in the city of Jinja, in the Eastern Region of Uganda.

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.

Ayago Hydroelectric Power Station, also Ayago Power Station, is a planned 840 megawatt hydroelectric power project to be constructed in Uganda. If it is built, Ayago would be the largest power station in Uganda, based on generating capacity.

Bujagali Energy Limited (BEL), is an electric energy generating company in Uganda. The company owns and operates the Bujagali Power Station, which was the largest hydropower plant in the country as of July 2014.

Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.

The Angololo Multipurpose Dam is a planned dam across the Malaba River, at the border between Kenya and Uganda. The dam will create a reservoir capable of storing 43,000,000 cubic meters (4.3×1010 L) of water for drinking, irrigation and power generation. An estimated 3,300 hectares (8,200 acres) are expected to come under irrigation (1,180 hectares (2,900 acres) in Kenya and 2,120 hectares (5,200 acres) in Uganda), with water from this dam. The dam is expected to benefit at least 127,300 people in both countries. The dam is also expected to support a mini-hydroelectric power station with capacity of 1.75 megawatts.

References

  1. 1 2 "Bujagali Dam, Uganda | International Rivers". internationalrivers.org. Archived from the original on 21 March 2008. Retrieved 6 June 2022.
  2. Linaweaver, Stephen. "Uganda Debates Damming the Nile - Falling for AES's Plan?". International Rivers.org. Retrieved 11 August 2016.

0°29′56″N33°08′24″E / 0.49889°N 33.14000°E / 0.49889; 33.14000