Bujumbura Thermal Power Station | |
---|---|
Official name | French: Centrale thermique de Bujumbura |
Country | Burundi |
Coordinates | 3°22′20″S29°21′05″E / 3.372177°S 29.35130°E |
Purpose | Power |
Owner(s) | Regideso Burundi |
Installed capacity | 5.5 megawatts (7,400 hp) |
The Bujumbura Thermal Power Station (French : French: Centrale thermique de Bujumbura) is a 5.5 MW thermal power station in the Commune of Buyenzi in Bujumbura Mairie Province, Burundi. It is owned by Regideso Burundi.
In 1995 REGIDESO acquired a 5.5 MW thermal power station in Bujumbura, but up to 2008 it was generally idle, available as an emergency back-up. Low prices for electricity and high costs for diesel made it uneconomical. [1] By 2010, the severe electrical power deficit could only be rectified through overhaul of the Bujumbura thermal power plant and rental of a 10 MW thermal power plant. [2] [lower-alpha 1]
In December 2010 the World Bank agreed to provide US$15 to improve the electricity supply in Burundi, including an extension of the thermal power plant in Bujumbura. [3] The second thermal plant, with 5.0MW capacity, operated through subsidies from the World Bank and the European Union. [4] In 2012 Burundi was facing a large electrical power deficit, reaching 40% - 50% of demand in peak hours. The government was forced to order "load shedding" (power cuts). [5] The Bujumbura Thermal Power Plant resumed operating in June 2012 to make up for the deficit at the Rwegura Hydroelectric Power Station and to reduce the need for load shedding. [6]
As of 2013 Regideso owned just one thermal power plant in Bujumbura. There was no budget for fuel for the 5.5MW plant, installed in 2007, so it was not operating. A 10MW group on a 2-year lease with fuel financed for a year started operation in April 2013. Another 5MW group was to be set up later in 2013 under a World Bank emergency project. [7] The 5.5MW thermal power plant was shut down in August 2014, and the 5MW plant in November 2015. The leased 10MW plant continued to supply power in 2016. [8]
In 2017 Regideso signed a contract with Interpetrol to build and operate the 30MW Interpetrol Power Station. The contract with Interpetrol was for ten years. [9] In October 2022 the director general of Regideso said he would restart the 5.5 Megawatt Buyenzi Thermal Power Station later that month, using fuel that was being used to power the Interpetrol Power Station. The Bujumbura Thermal Power Station, owned by Regideso, had been shut down for nine years. [10]
The Burundi Ministry of Energy and Mines also known as the Ministry of Hydraulics, Energy and Mines is responsible for managing energy development and distribution in Burundi. The main function of the Ministry of Energy and Mines include: design and implement the National policy in energy, geology and Mines; promote geological research and mining industry activities; developing and implementing policies related to electricity, minerals, petroleum and petroleum products. The current Cabinet Minister of Energy is Hon. Ibrahim Uwizeye, Jiji and Mulembwe Hydropower Project (PHJIMU), Hydro-Electric Plant Mpanda, Hydro-Electric Plant Kabu 16, Hydro-Electric Plant Rusumo falls, Kagu Project, Ruzizi III, Ruvyironza, Hydro-Electric Plant in Kirasa-Karonge, Peat Power Project.
The Ruvyironza River is a river in Burundi, the main tributary of the Ruvubu River. Its headwaters are the most remote source of the Nile when measured by river length from the Nile's mouth.
REGIDESO Burundi is a state-owned water and power distribution company in Burundi.
Rwegura Hydroelectric Power Station is a 18 megawatts (24,000 hp) hydroelectric power station in the Cibitoke Province of Burundi.
MugereHydroelectric Power Station is an 8 megawatts (11,000 hp) run-of-the-river hydroelectric power station in the Bujumbura Rural Province of Burundi.
Ruvyironza Hydroelectric Power Station is an 1.28 megawatts (1,720 hp) run-of-the-river hydroelectric power station in the Gitega Province of Burundi.
Nyemanga Hydroelectric Power Station is an 1.44 megawatts (1,930 hp) run-of-the-river hydroelectric power station in the Bururi Province of Burundi.
The Jiji and Murembwe Hydroelectric Project is an project to build two hydroelectric power stations with shared infrastructure in the Bururi Province of Burundi.
The Jiji Hydroelectric Power Plant is a hydroelectric power station in the Bururi Province of Burundi. As of 2024 it was nearing completion.
The Murembwe Hydroelectric Power Plant is a hydroelectric power station in the Bururi Province of Burundi. As of 2024 it was expected to the completed in 2025.
Ruvyironza Hydroelectric Power Station is an 0.8 megawatts (1,100 hp) run-of-the-river hydroelectric power station in the Muyinga Province of Burundi.
The Kavuruga River is a river in Muyinga Province, Burundi. It is a left tributary of the Ruvubu River.
The Ruzibazi Hydroelectric Power Plant is a hydroelectric power station in the Rumonge Province of Burundi.
The Interpetrol Power Station is a thermal power station in the Bujumbura Mairie Province of Burundi. It is owned by Interpetrol Burundi SA.
Interpetrol Burundi S.A. is a Bujumbura-based company that imports and sells petrol in Burundi.
Société d'Entreposage Pétrolier au Burundi, is a private company that operates a fuel storage depot near the Port of Bujumbura in Burundi.
Société Pétroliere du Burundi, or SOPEBU, is a public company that imports, stores and distributes petroleum products in Burundi.
The Bujumbura Slaughterhouse Management Company, or SOGEAB, is a company that operates abbatoirs in Burundi. It took over the assets of the Bujumbura Public Slaughterhouse or APB.