Interpetrol Power Station

Last updated
Interpetrol Power Station
Burundi physical map.svg
Red pog.svg
Location of Interpetrol Power Station in Burundi
Official name French: Centrale Interpetrol
Country Burundi
Coordinates 3°22′17″S29°21′04″E / 3.371464°S 29.351183°E / -3.371464; 29.351183
Purpose Power
Owner(s) Interpetrol Burundi
Installed capacity 45 megawatts (60,000 hp)

The Interpetrol Power Station (French : French: Centrale Interpetrol) is a thermal power station in the Bujumbura Mairie Province of Burundi. It is owned by Interpetrol Burundi SA.

Contents

Location

The Centrale Interpetrol is to the west of the Buyenzi district of Bujumbura, south of the Ntahangwa River. It is on the east side of the RN5 Boulevard Melchior Ndadaye opposite the Brarudi Brewery and the Port of Bujumbura on Lake Tanganyika. [1]

History

In 2010 the state-owned water and power company Regideso Burundi signed a contract with Interpetrol to supply 10 MW for six months. Regideso lost money on the contract. [2]

In 2017 Regideso signed a contract with Interpetrol to build and operate a thermal power plant. By June 2017 six of the nineteen planned generators had arrived and the others were on the way. The site for the generators had been prepared. A protective wall was being built to prevent damage from the Ntahangwa River, and a 1,000,000 litres (220,000 imp gal; 260,000 US gal) fuel tank was being built. It was expected that the 30MW plant would be ready by September 2017, and Regideso would no longer have to practice "load shedding" power cuts. The contract with Interpetrol was for ten years. [3]

In April 2018 the Director General of Interpetrol Burundi threatened to suspend production, since Regideso had failed to make payments on schedule. He also noted that Regideso was only requesting about 20MW on average while the sale price was based on 30MW, which was causing Interpetrol to lose money. Other complaints were that the tax administration was not respecting exemptions for spare parts and equipment, and the Bank of the Republic of Burundi (BRB) was not releasing dollars for Interpetrol to pay suppliers. Regideso refuted these charges, complaining that Interpetrol was charging above the agreed price, which would cause huge losses to Regideso since their retail sales price was fixed. [4]

In October 2022 the director general of Regideso said he would restart the 5.5 Megawatt Buyenzi Thermal Power Station later that month, using fuel that was being used to power the Interpetrol power station. The Buyenzi Thermal Power Station, owned by Regideso, had been shut down for nine years. [2]

See also

Related Research Articles

<span class="mw-page-title-main">Bujumbura</span> Largest city of Burundi

Bujumbura, formerly Usumbura, is the economic capital, largest city and main port of Burundi. It ships most of the country's chief export, coffee, as well as cotton and tin ore. Bujumbura was formerly the country's political capital. In late December 2018, Burundian president Pierre Nkurunziza announced that he would follow through on a 2007 promise to return Gitega its former political capital status, with Bujumbura remaining as economical capital and center of commerce. A vote in the Parliament of Burundi made the change official on 16 January 2019, with all branches of government expected to move to Gitega within three years.

The Ruvyironza River is a river in Burundi, the main tributary of the Ruvubu River. Its headwaters are the most remote source of the Nile when measured by river length from the Nile's mouth.

<span class="mw-page-title-main">Burundian unrest (2015–2018)</span> Period of unrest in Burundi

On 25 April 2015, the ruling political party in Burundi, the National Council for the Defense of Democracy – Forces for the Defense of Democracy (CNDD-FDD), announced that the incumbent President of Burundi, Pierre Nkurunziza, would run for a third term in the 2015 presidential election. The announcement sparked protests by those opposed to Nkurunziza seeking a third term in office.

<span class="mw-page-title-main">REGIDESO Burundi</span>

REGIDESO Burundi is a state-owned water and power distribution company in Burundi.

Rwegura Hydroelectric Power Station is a 18 megawatts (24,000 hp) hydroelectric power station in the Cibitoke Province of Burundi.

MugereHydroelectric Power Station is an 8 megawatts (11,000 hp) run-of-the-river hydroelectric power station in the Bujumbura Rural Province of Burundi.

The Mugere River is a river in Bujumbura Rural Province, Burundi.

The Ntahangwa River is a river in Burundi that flows through the city of Bujumbura..

Nyemanga Hydroelectric Power Station is an 1.44 megawatts (1,930 hp) run-of-the-river hydroelectric power station in the Bururi Province of Burundi.

The Jiji and Murembwe Hydroelectric Project is an project to build two hydroelectric power stations with shared infrastructure in the Bururi Province of Burundi.

The Jiji Hydroelectric Power Plant is a hydroelectric power station in the Bururi Province of Burundi. As of 2024 it was nearing completion.

The Murembwe Hydroelectric Power Plant is a hydroelectric power station in the Bururi Province of Burundi. As of 2024 it was expected to the completed in 2025.

Ruvyironza Hydroelectric Power Station is an 0.8 megawatts (1,100 hp) run-of-the-river hydroelectric power station in the Muyinga Province of Burundi.

The Kavuruga River is a river in Muyinga Province, Burundi. It is a left tributary of the Ruvubu River.

The Mpanda River is a river in Bubanza Province, Burundi. It is a tributary of the Ruzizi River.

The Nyamuswaga River is a river in Burundi, a tributary of the Kinyankuru River.

The Ruzibazi Hydroelectric Power Plant is a hydroelectric power station in the Rumonge Province of Burundi.

The Bujumbura Thermal Power Station is a 5.5 MW thermal power station in the Commune of Buyenzi in Bujumbura Mairie Province, Burundi. It is owned by Regideso Burundi.

Interpetrol Burundi S.A. is a Bujumbura-based company that imports and sells petrol in Burundi.