CNR diesel multiple unit

Last updated
CNR diesel multiple unit
J30 653 Hp Doctor Antonio Saenz, CM 1011.jpg
CM 1011 at Doctor Antonio Sáenz station, 2018
Stock typeDiesel multiple unit
Manufacturer CNR Corporation
Constructed2014
Number built81 cars
Formation3 cars per trainset
Operators Trenes Argentinos Operaciones
Lines served Belgrano Sur line
Specifications
Width2,750 mm (9 ft 14 in)
Maximum speed100 km/h (62 mph)
Track gauge 1,000 mm (3 ft 3+38 in)

The CNR diesel multiple unit is a diesel multiple unit (DMU) designed for suburban passenger service in the south and west of the Buenos Aires metropolitan area. The trains were acquired by the Argentine government in 2013 at a cost of $89 million, and are used on the Belgrano Sur line, which formerly used locomotive-hauled stock. [1]

Contents

The contract established the manufacture of 27 formations consisting of two control cars and one intermediate trailer car. The purchase of the formations facilitated the extension of services on branch G to Marcos Paz, a section which not see rail service since 1993. [2]

Background and construction

An EMD G22 hauling a loco-hauled commuter train, 2015 Belgrano Sur Line G22.jpg
An EMD G22 hauling a loco-hauled commuter train, 2015

When the state-owned Trenes Argentinos took over the Belgrano Sur line from Argentren on 2 March 2015, [3] Minister of the Interior and Transport Florencio Randazzo decided to purchase 81 cars (formed into 27 3-car sets) from the Chinese company CNR Corporation, as part of the Government's plan to modernise the line. [1]

The first batch of new rolling stock was expected to be arrive from May 2015, [4] [5] but only arrived in Buenos Aires on 7 July of that year. [6] It was then announced that the new rolling stock would begin running on the Buenos Aires to González Catán route in August. [7] [8] The other parts of the line received the new rolling stock before the end of 2015, as more railcars arrived in the country. [9]

As the railcars were being delivered, all 28 stations were to be refurbished and modernised, which included raising the platform height to match the new rolling stock. [6] [10]

Service history

A six-car CNR DMU set leaving Buenos Aires station, 2015 CNR DMU Belgrano Sur.jpg
A six-car CNR DMU set leaving Buenos Aires station, 2015

In early October 2019, set CM 1015 was trialed on the section from González Catán and 20 de Junio, which had overseen rehabilitation since its abandonment in 1993. [11] Services to 20 de Junio was supposed to commence on 14 November 2019, but was delayed after inspections found numerous flaws with the line, including signaling issues and lack of staff training. [12] Although the 20 de Junio service eventually started on 2 December 2019, [13] the single CNR DMU that initially ran the section was displaced by two Emepa Alerce railcars in January 2020, due to low demand. [14]

The CNR DMUs suffered from a shortage of spare parts, causing service reduction on the Belgrano Sur line in July 2023 (although officially, the service reduction was due to infrastructural maintenance, rather than delayed rolling stock repairs and parts delivery some sources noted), [15] and again in August, which also delayed service commencement on the Marinos del Crucero Gral branch by a week until the 14th. [16]

To address the issue, in September 2023, Trenes Argentinos handed out tenders in purchasing spare parts from both domestic and international contracts. [17] Trenes Argantinos and the Ministry of Transport had previously signed a contract in 2020 with CRRC Tangshan to supply parts for the CNR DMUs, as well as the 20 CNR CKD8 diesel locomotives that hauled Argentina's long-distance trains, but has not been fulfilled in time. [17] [18] The contract failed in March 2024, [19] causing further reduction of services during April, with the González Catán branch seeing the daily number of trains dwindled from 110 to 88, and off-peak frequency doubled to 40 minutes per train. [20]

Trenes Argentinos made another attempt in gathering spare parts for the CNR DMUs, by signing a new contract in July 2024, [19] followed by the purchase of 802 wheels in January 2025 for its fleet operating on the Roca, San Martin, and Belgrano Sur lines. [21]

See Also

Related Research Articles

<span class="mw-page-title-main">Buenos Aires Underground</span> Rapid transit railway in Buenos Aires, Argentina

The Buenos Aires Underground, locally known as Subte, is a rapid transit system that serves the area of the city of Buenos Aires, Argentina. The first section of this network opened in 1913, making it the 13th earliest subway network in the world and the first underground railway in Latin America, the Southern Hemisphere, and the Spanish-speaking world, with the Madrid Metro opening nearly six years later, in 1919. As of 2023, Buenos Aires is the only Argentine city with a metro system.

<span class="mw-page-title-main">Buenos Aires Belgrano Sur Line railway station</span> Former railway station in Buenos Aires, Argentina

Buenos Aires is a former passenger railway station in the city of Buenos Aires, Argentina. The station was terminus of the Belgrano Sur line that runs trains along Greater Buenos Aires region.

<span class="mw-page-title-main">Ferrovías</span> Argentine private railway company

Ferrovías S.A.C. is a privately owned company which, on 1 April 1994, took over the concession, granted by the Argentine government as part of railway privatisation during the presidency of Carlos Menem, for the operation of the 1,000 mm Belgrano Norte Line commuter rail service in Buenos Aires, Argentina.

<span class="mw-page-title-main">Belgrano Norte Line</span> Commuter rail service in Buenos Aires

The Belgrano Norte line is a commuter rail service in Buenos Aires, Argentina run by the private company Ferrovías since 1 April 1994. This service had previously been run by the state-owned General Belgrano Railway since nationalisation of the railways in 1948. Ferrovías also formed part of the consortium Unidad de Gestión Operativa Ferroviaria de Emergencia (UGOFE) which operated other commuter rail services in Buenos Aires.

<span class="mw-page-title-main">San Martín Line</span> Railway line in Buenos Aires, Argentina

The San Martín line is a 70-kilometre (43 mi), 22-station commuter rail service in the metropolitan area of Buenos Aires, Argentina. The San Martín line operates from the city-centre terminus of Retiro north-west to Doctor Cabred in Luján Partido along a broad gauge line built by the British-owned Buenos Aires and Pacific Railway.

<span class="mw-page-title-main">Roca Line</span> Commuter rail service in Buenos Aires

The Roca line is a 1,676 mm gauge commuter rail service in the Buenos Aires Province, Argentina, part of General Roca Railway network. The service is currently operated by State-owned company Trenes Argentinos, from the city-centre terminus of Constitución south to Ezeiza, Alejandro Korn, La Plata, Cañuelas, Chascomús, Gutiérrez and Lobos, and west to Sarmiento Line's station Haedo. The transfer stations between the branch lines are Avellaneda, Temperley, Bosques and Berazategui.

<span class="mw-page-title-main">Belgrano Sur Line</span> Commuter rail service in Buenos Aires

The Belgrano Sur line is an Argentine 1,000 mmmetre gauge commuter rail service in the Greater Buenos Aires area, currently operated by state-owned enterprise Trenes Argentinos. The Belgrano Sur runs over tracks and through stations built by the Franco–Belgian-owned Compañía General de Buenos Aires and British Midland companies at the beginning of the 20th century.

<span class="mw-page-title-main">Railway privatisation in Argentina</span> Privatisation of Argentine railways

Railway privatisation in Argentina was a process which began in 1989 under the presidency of Carlos Menem, following a series of neoliberal economic reforms. This primarily consisted of breaking up the state-owned railway company Ferrocarriles Argentinos (FA) and allowing the former lines to be operated by private companies instead of the state.

<span class="mw-page-title-main">Rail transport in Argentina</span>

The Argentine railway network consisted of a 47,000 km (29,204 mi) network at the end of the Second World War and was, in its time, one of the most extensive and prosperous in the world. However, with the increase in highway construction, there followed a sharp decline in railway profitability, leading to the break-up in 1993 of Ferrocarriles Argentinos (FA), the state railroad corporation. During the period following privatisation, private and provincial railway companies were created and resurrected some of the major passenger routes that FA once operated.

<span class="mw-page-title-main">Trenes Argentinos Operaciones</span> Argentine state-owned railway company

Operadora Ferroviaria Sociedad del Estado (SOFSE), trading as Trenes Argentinos Operaciones, is an Argentine state-owned company created in 2008 to operate passenger services in Argentina. It operates as a division of Ferrocarriles Argentinos S.E..

<span class="mw-page-title-main">Argentren</span> Former Argentine regional railway company (2014–15)

Argentren S.A. was an Argentine private company that operated the Belgrano Sur and Roca railway services in Buenos Aires Province for about one year until the Government of Argentina rescinded the agreement with the company in March 2015. Since then, the Mitre and San Martín line are operated by State-owned company Operadora Ferroviaria Sociedad del Estado (SOFSE).

<span class="mw-page-title-main">Corredores Ferroviarios</span> Former Argentine railway company (2014–2015)

Corredores Ferroviarios was an Argentine private company that operated the Mitre and San Martín railway services in Buenos Aires Province for about one year until the Government of Argentina rescinded the agreement with the company in March 2015. Since then, the Mitre and San Martín line are operated by State-owned company Operadora Ferroviaria Sociedad del Estado (SOFSE).

<span class="mw-page-title-main">Materfer</span> Argentine rolling stock manufacturer

Materfer is an Argentine manufacturer of railway and road vehicles, located in the city of Ferreyra in Córdoba Province. The company was established by Fiat Concord in the late 1950s, being its subsidiary until 1980 when Sevel Argentina took over Fiat vehicles.

<span class="mw-page-title-main">Emepa Group</span> Argentine rolling stock manufacturer

Emepa Group S.A. is an Argentine manufacturer of railway vehicles and owner of Ferrovías, with headquarters located in the city of Buenos Aires. It had formerly owned Ferrocentral, which ran services from Buenos Aires to Córdoba and San Miguel de Tucumán on the Mitre Network, however the state-owned company SOFSE took over these services in 2014 and the subsidiary now remains inactive.

<span class="mw-page-title-main">Red de Expresos Regionales</span> Planned mass transit system in Buenos Aires

The Regional Express Network was a planned commuter network system in Buenos Aires, which consisted in an underground connection among the 3 mainline railway stations of the city: Retiro, Constitucion and Once, in the north, south and west respectively.

<span class="mw-page-title-main">Materfer CMM 400-2</span> Argentine diesel multiple unit produced by Materfer

The CMM 400-2 is a diesel multiple unit produced by Materfer in Córdoba Province, Argentina. The units are produced in Argentina's three primary track gauges and the standard gauge variants were the first to be produced for General Urquiza Railway services in Entre Ríos Province.

<span class="mw-page-title-main">CSR EMU (Argentina)</span> CSR Corporation EMU cars for Buenos Aires commuter railways

The CSR EMU is a series of electric multiple unit cars manufactured by CSR Corporation Limited for use on Buenos Aires' commuter rail network. As of 2015, the trains operated on three of the city's lines and 705 cars were manufactured, with each line using a different number of cars per train. They were created for use on lines electrified using both third rail and overhead lines.

<span class="mw-page-title-main">Emepa Alerce</span> Argentine train used on commuter rail services

The Alerce is an Argentine railcar produced by the Emepa Group in Chascomús, Buenos Aires Province. As of 2015, the units are produced for the General Belgrano Railway's narrow gauge network and are currently used on commuter rail services, though a broad gauge variant is currently in the works. They are designed to be easily converted into Electric Multiple Units, though only diesel variants have been produced to date. The Alerce's namesake is the common name of Fitzroya cupressoides, a coniferous tree native to Argentina and Chile.

The Buenos Aires Underground has one of the most diverse metro fleets in the world, and has had some of the oldest models in operation on any network. The network began with a relatively standardised fleet, but throughout its over 100-year-long history, it has seen numerous purchases which have created cases where some lines operate numerous models. Recently there have been increased efforts to modernise and standardise the fleets, with large purchases from China CNR Corporation and Alstom.

<span class="mw-page-title-main">Quebrada de Humahuaca tourist train</span>

The Quebrada de Humahuaca Solar Train is a 42 km (26.1 mi) regional tourist service that operates between the cities of Volcán and Tilcara in Jujuy Province, Argentina. The train service operates within the Quebrada de Humahuaca, a UNESCO World Heritage Site since 2003 and uses the General Belgrano Railway's Ramal C that extends from Santa Fe and La Quiaca.

References

  1. 1 2 Lukin, Thomas (26 September 2013). "Trenes para el Sur" [Trains to the South]. Pagina12 (in Spanish). Retrieved 11 January 2025.
  2. "Así son los nuevos coches motores CNR para el Belgrano Sur". enelSubte (in Spanish). 2015-04-16. Retrieved 2024-02-15.
  3. Alfie, Alejandro (5 March 2015). "Ya está lista la ley que prevé más control estatal sobre los trenes" [The law that provides for more state control over trains is ready]. iEco (in Spanish). Archived from the original on 2 April 2015. Retrieved 11 January 2025.
  4. "Estos son los nuevos coches para la línea Belgrano Sur" [These are the new cars for the Belgrano Sur line]. Info News (in Spanish). 26 September 2014. Archived from the original on 26 May 2015. Retrieved 11 January 2025.
  5. "Llegaron los trenes nuevos para el Belgrano Sur" [New trains have arrived for Belgrano Sur]. Diario Jornada (in Spanish). 7 July 2015. Retrieved 11 January 2015.
  6. 1 2 "First Belgrano Sur DMUs arrive". Railway Gazette . 8 July 2015. Archived from the original on 24 September 2015. Retrieved 11 January 2025.
  7. "En agosto comenzarán a funcionar nuevos trenes en la línea Belgrano Sur" [New trains will start operating on the Belgrano Sur line in August]. La Nacion (in Spanish). 29 July 2015. Archived from the original on 8 August 2015. Retrieved 11 January 2025.
  8. "Belgrano Sur: en 15 días comienzan a funcionar los nuevos trenes" [Belgrano Sur: en 15 días comienzan a funcionar los nuevos trenes]. enelSubte (in Spanish). 30 July 2015. Retrieved 11 January 2025.
  9. Randazzo anunció que en agosto comenzarán a funcionar trenes 0Km en el Belgrano Sur - Ministerio del Interior, 29 July 2015.[ dead link ]
  10. "Arribaron al puerto primeros coches motores CNR para el Belgrano Sur" [First CNR motor cars for the Belgrano Sur arrived at the port]. enelSubte (in Spanish). 6 July 2015. Retrieved 11 January 2025.
  11. "Belgrano Sur: probaron un cochemotor hasta la estación 20 de Junio" [Belgrano Sur: they tested a railcar to the 20 de Junio station]. enelSubte (in Spanish). 11 October 2019. Retrieved 12 January 2025.
  12. "Suspenden la habilitación del servicio a 20 de Junio por irregularidades" [Service activation suspended on June 20 due to irregularities]. enelSubte (in Spanish). 14 November 2019. Retrieved 12 January 2025.
  13. "Comienza a circular el servicio González Catán – 20 de Junio" [González Catán service begins to circulate – June 20]. enelSubte (in Spanish). 2 December 2019. Retrieved 12 January 2025.
  14. "El servicio González Catán – 20 de Junio funcionará con un cochemotor Alerce" [The González Catán – 20 de Junio service will operate with an Alerce railcar]. enelSubte (in Spanish). 20 January 2020. Retrieved 12 January 2025.
  15. "Otra línea con diagrama reducido: el Belgrano Sur funcionará con horario de sábados" [Another line with a reduced schedule: the Belgrano Sur will operate on Saturdays]. enelSubte (in Spanish). 4 July 2023. Retrieved 12 January 2025.
  16. "Belgrano Sur: vuelven a postergar el inicio del servicio limitado Tapiales – Marinos del Crucero Gral. Belgrano" [Belgrano Sur: the start of the limited service Tapiales – Marinos del Crucero Gral. Belgrano is postponed again]. enelSubte (in Spanish). 4 August 2023. Retrieved 12 January 2025.
  17. 1 2 "Licitan una importante compra de repuestos para los cochemotores del Belgrano Sur" [Tender for a major purchase of spare parts for Belgrano Sur railcars]. enelSubte (in Spanish). 13 September 2023. Retrieved 12 January 2025.
  18. "Comprarán repuestos para trenes de larga distancia y cochemotores del Belgrano Sur" [They will buy spare parts for long-distance trains and Belgrano Sur railcars]. enelSubte (in Spanish). 15 October 2020. Retrieved 12 January 2025.
  19. 1 2 "Relanzan la compra de repuestos para los cochemotores del Belgrano Sur" [Purchase of spare parts for Belgrano Sur railcars is relaunched]. enelSubte (in Spanish). 18 July 2024. Retrieved 12 January 2025.
  20. "Deterioro de los trenes metropolitanos: recortan servicios en la línea Belgrano Sur" [Deterioration of metropolitan trains: services cut on the Belgrano Sur line]. enelSubte (in Spanish). 24 April 2024. Retrieved 12 January 2025.
  21. "Compran ruedas para los trenes metropolitanos" [They buy wheels for metropolitan trains]. enelSubte (in Spanish). 9 January 2025. Retrieved 12 January 2025.