Charles Piez

Last updated

Charles Piez
Chas. Piez LOC 24225733666 (cropped).jpg
Piez, c.1915
President of the American Society of Mechanical Engineers
In office
1930–1931
Personal details
Born(1866-09-24)September 24, 1866
Mainz, Germany
DiedOctober 2, 1933(1933-10-02) (aged 67)
Washington, D.C., U.S.

Charles Piez (September 24, 1866 - October 2, 1933) was an American mechanical engineer, manufacturer, and president of the Link-Belt Co. [1] He was president of the Electric Company, and vice president and general manager of the Emergency Fleet Corporation (EFC). [2] [3] He is also known as president of the American Society of Mechanical Engineers from 1930 to 1931. [4]

Contents

Biography

Piez was born in Mainz, Grand Duchy of Hesse, the son of Jacob Piez and Katherine (Liebig) Piez, both naturalized American citizens. [5] He emigrated with his parents to the United States, and attended public schools in Manhattan, New York City. [6] He entered the School of Mines of Columbia University in the class of 1888. Due to financial reverses in the family he worked for a year, and graduated with the class of 1889. [7]

After graduation Piez started his career in industry as an engineer draftsman at the Link-Belt Engineering Corporation in Philadelphia [6] under James Mapes Dodge. He worked his way up to chief engineer, general manager, and eventually vice-president until 1906.

In 1906, the Link-Belt Engineering Corporation merged into the Link-Belt Co., and Piez was elected president. [6] Piez held the position of president until 1917. [8] After the outbreak of World War I, Piez was appointed vice-president of the Emergency Fleet Corporation (EFC). [9] He represented the EFC on the priorities board of the War Industries Board. [10] [11] In 1917, he was also appointed manager of the United States Shipping Board, succeeding Rear-Admiral Frederic R. Harris. [9] In 1919, Piez forbade the Seattle ship manufacturers from meeting workers demands, triggering the Seattle General Strike. Piez was singled out as a prime target of the strike. The action was unsuccessful. [12] Until his retirement in April 1933, Piez served as chairman of the board of the Link-Belt Corporation. [6]

In 1925-1927, Piez served as President of the Illinois Manufacturers' Association. [13] From 1930 to 1931, he served as president of the American Society of Mechanical Engineers. [14]

He died on October 2, 1933, in Washington, D.C. [1]

Selected publications

Related Research Articles

<span class="mw-page-title-main">United States Shipping Board</span> Emergency agency by the 1916 Shipping Act

The United States Shipping Board (USSB) was established as an emergency agency by the 1916 Shipping Act, on September 7, 1916. The United States Shipping Board's task was to increase the number of US ships supporting the World War I efforts. The program ended on March 2, 1934.

<span class="mw-page-title-main">Seattle General Strike</span> 1919 workers strike in Seattle, Washington

The Seattle General Strike was a five-day general work stoppage by 65,000 workers in the city of Seattle, Washington from February 6 to 11, 1919. The goal was to support shipyard workers in several unions who were locked out of their jobs when they tried to strike for higher wages. Most other local unions joined the walk-out, including members of the American Federation of Labor (AFL) and the Industrial Workers of the World (IWW). The national offices of the AFL unions were opposed to the shutdown. Local, state and federal government officials, the press, and much of the public viewed the strike as a radical attempt to subvert American institutions.

SS <i>Vaterland</i> (1913) Ocean liner

SS Vaterland was an ocean liner launched on 3 April 1913 and began service in 1914 for Germany's Hamburg America Line. The ship, second of three running mates and then the largest passenger ship in the world, made her first voyage to New York arriving on 21 May 1914 under the command of a Commodore and four Captains of the German Naval Reserve to celebrations featuring German and American officials at the line's Hoboken facilities.

<span class="mw-page-title-main">Emergency Fleet Corporation</span>

The Emergency Fleet Corporation (EFC) was established by the United States Shipping Board, sometimes referred to as the War Shipping Board, on 16 April 1917 pursuant to the Shipping Act to acquire, maintain, and operate merchant ships to meet national defense, foreign and domestic commerce during World War I.

<span class="mw-page-title-main">Leon P. Alford</span> American mechanical engineer and organizational theorist

Leon Pratt Alford was an American mechanical engineer, organizational theorist, and administrator for the American Society of Mechanical Engineers. known for his seminal work in the field of industrial management.

USS <i>Refuge</i> Hospital ship of the United States Navy

USS Refuge (AH-11), was a hospital ship of the United States Navy during World War II. The ship was built in 1921 by the New York Shipbuilding Corp., of Camden, New Jersey, as SS Blue Hen State, but was renamed President Garfield in 1923 and then SS President Madison in 1940 for service with American President Lines. Acquired by the Navy from the War Shipping Administration on 11 April 1942 the ship was commissioned as the transport USS Kenmore until conversion to a hospital ship.

SS <i>President Cleveland</i> (1920) American passenger vessel

SS President Cleveland was originally built as Golden State for the United States Shipping Board (USSB), one of the planned World War I troop transports converted before construction into passenger and cargo vessels launched as Emergency Fleet Corporation Design 1029 ships first known, along with the smaller Design 1095 versions, in the trade as "State" ships due to names assigned for the nicknames of states and later as "535s" for their length overall. Almost all ships of both designs were renamed for United States presidents by May 1921, with Golden State being renamed President Cleveland. As one of the USSB-owned ships operated by agents of the board, President Cleveland was allocated to and operated by the Pacific Mail Steamship Company until sold by the USSB to the Dollar Steamship Line in 1925. After the demise of that line and creation of a new, replacement line, American President Lines, the ship remained with that line until government acquisition for the Second World War.

<span class="mw-page-title-main">Merchant Shipbuilding Corporation</span>

The Merchant Shipbuilding Corporation was an American corporation established in 1917 by railroad heir W. Averell Harriman to build merchant ships for the Allied war effort in World War I. The MSC operated two shipyards: the former shipyard of John Roach & Sons at Chester, Pennsylvania, and a second, newly established emergency yard at Bristol, Pennsylvania, operated by the MSC on behalf of the U.S. Shipping Board's Emergency Fleet Corporation (EFC).

<span class="mw-page-title-main">Seattle Construction and Drydock Company</span>

The Seattle Construction and Drydock Company was a shipbuilding company based in Seattle, Washington. Between 1911 and 1918, it produced a substantial number of ships for both commercial and military uses. In the beginning of the 20th century, until its significance was diluted by the emergence of a number of shipyards during the World War I shipbuilding boom, it was the largest of its kind in Seattle and one of the few significant ship yards along the West Coast of the United States, second only to the Union Iron Works in San Francisco.

<span class="mw-page-title-main">Theodore E. Ferris</span>

Theodore Ernest Ferris was an American naval architect and engineer responsible for the "Ferris Designs" used by the US Emergency Fleet Corporation, of the United States Shipping Board, during World War I.

<span class="mw-page-title-main">James Mapes Dodge</span> American mechanical engineer, inventor and industrialist

James Mapes Dodge was an American mechanical engineer, inventor, industrialist and president of the American Society of Mechanical Engineers in the year 1903–1904. He is known as president of the Link-Belt Company, and as pioneer of applying scientific management methods.

<span class="mw-page-title-main">Conrad N. Lauer</span> American engineer (1869–1943)

Conrad Newton Lauer was an American mechanical engineer, general manager at Day & Zimmerman, Inc., chairman of the Philadelphia Gas Works Co., and 51st president of the American Society of Mechanical Engineers in 1932–33.

<span class="mw-page-title-main">Paul Aaron Langevin Doty</span> American engineer (1869–1938)

Paul Aaron Langevin Doty was an American mechanical engineer, vice-president and general manager of the St. Paul Gas Light Co., president of St. Paul Trust and Savings Bank, and investor. He was the 53rd president of the American Society of Mechanical Engineers in the year 1934–35.

David William Rowsen Morgan was an American mechanical engineer and business executive at the Westinghouse Electric Corporation, known as 74th president of the American Society of Mechanical Engineers in the year 1955-56.

Design 1023 ship

The Design 1023 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's (USSB) Emergency Fleet Corporation (EFC) in World War I. Like many of the early designs approved by the EFC, the Design 1023 did not originate with the EFC itself but was based on an existing cargo ship designed by Theodore E. Ferris for the United States Shipping Board (USSB). The ships, to be built by the Submarine Boat Corporation of Newark, New Jersey, were the first to be constructed under a standardized production system worked out by Ferris and approved by the USSB.

Suremico was a Design 1023 cargo ship built for the United States Shipping Board (USSB) immediately after World War I. She was later named the Nisqually and converted into a barge and later a scow. She was bombed and sunk during the Battle of Wake Island.

Design 1014 ship World War I steel-hulled cargo ship design

The Design 1014 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Cascade"-type. They were all built by Todd Drydock and Construction Company, at their Tacoma, Washington shipyard. 20 ships were completed for the USSB in 1919 and 1920; and additional 2 were completed in 1920 for private companies. 12 ships were cancelled.

Design 1015 ship World War I steel-hulled cargo ship design

The Design 1015 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) during World War I. They were referred to as the "Moore & Scott"-type.

USAT <i>Arcata</i> Ship built in Portland, Oregon, United States

USAT Arcata, was built in 1919 as the SS Glymont for the United States Shipping Board as a merchant ship by the Albina Engine & Machine Works in Portland, Oregon. The 2,722-ton cargo ship Glymont was operated by the Matson Navigation till 1923 in post World War I work. In 1923 she was sold to Cook C. W. of San Francisco. In 1925 she was sold to Nelson Charles Company of San Francisco. In 1937 she was sold to Hammond Lumber Company of Fairhaven, California. For World War II, in 1941, she was converted to a US Army Troopship, USAT Arcata. She took supplies and troops to Guam. On July 14, 1942, she was attacked by Japanese submarine I-7 and sank. She was operating as a coastal resupply in the Gulf of Alaska, south of the Aleutian Islands at, approximately 165 nautical miles southeast of Sand Point, when she sank. She was returning after taking supplies to Army troops fighting in the Aleutian Islands campaign.

The Design 1006 ship was a wood-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Daugherty"-type after A. A. Daugherty, the president of the National Shipbuilding Company. The USSB ordered a total of 40 hulls from three shipyards: National Shipbuilding Company of Orange, Texas shipyard ; Union Bridge & Construction Company of Morgan City, Louisiana shipyard ; and Dirks Blodgett Shipbuilding Company of Pascagoula, Mississippi. The design was altered by National Shipbuilding increasing the deadweight to 5,000 tons. Only 12 were completed for the USSB while two were built as tankers in 1920 for the National Oil Transportation Company of Port Arthur, Texas and one as a barge.

References

  1. 1 2 "Charles Piez Dies; Built Ships in War. As Head of Emergency Fleet Corp. Directed Spending of $3,000,000,000. Succeeded C. M. Schwab. Chairman of Link-Belt Company. Was Instrumental in Framing Labor Laws in Illinois". The New York Times . October 3, 1933.
  2. The American Architect and Engineer Blue Book: A Distinct Cyclopedia of 1921. 1912. p. 242.
  3. Edward N. Hurley. The Bridge to France. 1927.
  4. American Machinist, 1933. p. 308
  5. James Terry White (1967). The National cyclopaedia of American biography. p. 17
  6. 1 2 3 4 Iron Age, Vol. 132. 1933. p. 53
  7. The Iron Trade Review. 1918. p. 1565
  8. Grain and Farm Service Centers, Vol. 39. 1917. p. 997
  9. 1 2 "Charles Piez Made Manager of Ship Board." Chicago Tribune, December 18, 1917
  10. Members of the War Industries Board Organization. Washington, D.C.: Government Printing Office. 1919. p. 21. Retrieved February 19, 2024.
  11. Haynes, Williams (1945). "Appendix X: The War Industries Board". American Chemical Industry: The World War I Period: 1912–1922. Vol. II. New York, New York: D. Van Nostrand Company, Inc. p. 353. Retrieved February 19, 2024.
  12. The Seattle General Strike by Friedheim, Robert L. Reprinted 2018
  13. Industry Week. Vol. 78, 1926. p. 367
  14. "ASME Presidents". The American Society of Mechanical Engineers. Retrieved February 19, 2024.