The Columbus External Payload Facility (Columbus-EPF) is a component of the Columbus module on the International Space Station. It consists of two identical L-shaped consoles attached to the starboard cone of Columbus in the zenith (top) and nadir (bottom) positions, each supporting two platforms for external payloads or payload facilities. Four external payloads (payload facilities) can be operated at the same time.
Columbus-EPF was transported to the International Space Station (ISS) with the Columbus module on STS-122/1E in February 2008. Columbus-EPF payloads and payload facilities are transported to and from orbit using a carrier supplied by the ISS Program. The payloads and payload facilities are manoeuvred by the robotic manipulators of the ISS to their final operational locations on the Columbus-EPF. Each payload or payload facility has an open view to ram and to starboard, as well as one to either zenith or nadir. The view in the wake direction is reduced by ISS structures. At the end of its operational phase, a payload is transported to the carrier by robotic means and returned to ground for post-mission inspection and analysis and, possibly, refurbishment. [1]
The first Columbus-EPF payload facilities were the European Technology Exposure Facility (EuTEF) and Sun Monitoring on the External Payload Facility of Columbus (Solar), which were installed during an extravehicular activity (EVA) by crew members of the STS 122 mission .
In addition to structural support, Columbus can supply power and data (command) to the Columbus-EPF payloads and can poll the payloads for housekeeping (health and status) and user data. The power and data interfaces available to the Columbus-EPF payloads are directly connected to the Columbus internal distribution systems. Columbus-EPF payloads and payload facilities are controlled and commanded via Columbus using the same data links and ground segment infrastructure used for internal payloads. Each payload has a facility-responsible centre that can transmit commands and receive telemetry via the Columbus Control Centre. Columbus provides a maximum of 1.25 kW per Columbus-EPF location. Each Columbus-EPF location is connected to two 120-Vdc power feeders, each of which has a maximum allocation of 1.25 kW. Switching between the power feeders is done via the payload power switch box in Columbus and requires the power feeders to be powered down.
The maximum on-orbit mass of an external Columbus-EPF payload, including the adapter plate, is 290 kg. The dimensions of a payload should not exceed 864 x 1168 x 1245 mm without the adapter plate. [1]
The Bartolomeo platform was robotically removed from SpaceX CRS-20's trunk and installed on the external forward side of Columbus module in April 2020, [2] attached to the trunnions that held Columbus in the payload bay of Space Shuttle Atlantis on its 2008 launch. An EVA for ISS astronauts to connect power and communications cables and to install a new Ka-band antenna was carried out on January 27, 2021. [3] Due to issues with the installation of Bartolomeo, only four out of the six cables could be installed. The platform is "partially operational and in a safe configuration" according to NASA; the final two cables will be installed on a future spacewalk. [4] ESA is emphasizing its usefulness for commercial entities, academic institutions, and other lower-budget customers. [5] [6] [7]
Airbus spent about €40 million to develop the Bartolomeo platform, according to DLR, the German space agency. DLR says accommodations on Bartolomeo will be priced from €300,000 to €3.5 million per year. Data from attached experiments will be routed to the ground through the space station's telemetry system, then go into cloud storage, where scientists can access the information with a smartphone. Payload owners can also send commands to their experiments through a smartphone. A German-made laser communications terminal will be added to Bartolomeo in 2021, allowing faster data links between experiments and their operators on the ground.[ needs update ] Airbus is also partnering with the United Nations Office for Outer Space Affairs to solicit ideas for Bartolomeo payloads from around the world. Developing countries in particular are encouraged to participate. [8]
Payloads are installed onto Columbus using Flight Releasable Attachment Mechanisms or FRAMs for short. There are four FRAMs on Columbus; each is currently holding an external payload.
Source: [9]
Columbus is a science laboratory that is part of the International Space Station (ISS) and is the largest single contribution to the ISS made by the European Space Agency (ESA).
Kibō, also known as the Japanese Experiment Module (JEM), is a Japanese science module for the International Space Station (ISS) developed by JAXA. It is the largest single ISS module, and is attached to the Harmony module. The first two pieces of the module were launched on Space Shuttle missions STS-123 and STS-124. The third and final components were launched on STS-127.
Harmony, also known as Node 2, is the "utility hub" of the International Space Station. It connects the laboratory modules of the United States, Europe and Japan, as well as providing electrical power and electronic data. Sleeping cabins for four of the crew are housed here.
The European Robotic Arm (ERA) is a robotic arm that is attached to the Russian Orbital Segment (ROS) of the International Space Station. Launched to the ISS in July 2021; it is the first robotic arm that is able to work on the Russian Segment of the station. The arm supplements the two Russian Strela cargo cranes that were originally installed on the Pirs module, but were later moved to the docking compartment Poisk and Zarya module.
STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on June 8, 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on February 26, 2007, had previously caused the launch to be postponed from an originally-planned launch date of March 15, 2007. The launch of STS-117 marked the 250th orbital human spaceflight. It was also the heaviest flight of the Space Shuttle.
STS-122 was a NASA Space Shuttle mission to the International Space Station (ISS), flown by the Space ShuttleAtlantis. STS-122 marked the 24th shuttle mission to the ISS, and the 121st Space Shuttle flight overall.
External stowage platforms (ESPs) are key components of the International Space Station (ISS). Each platform is made from steel and serves as an external pallet that can hold spare parts, also known as orbital replacement units (ORUs), for the space station. As a platform it is not pressurized, but does require electricity to power the heaters of some of the stored equipment. ORUs are attached to the ESP via Flight Releasable Attachment Mechanisms (FRAMs), matching witness plates that mate the ORU to the platform.
STS-133 was the 133rd mission in NASA's Space Shuttle program; during the mission, Space Shuttle Discovery docked with the International Space Station. It was Discovery's 39th and final mission. The mission launched on February 24, 2011, and landed on March 9, 2011. The crew consisted of six American astronauts, all of whom had been on prior spaceflights, headed by Commander Steven Lindsey. The crew joined the long-duration six person crew of Expedition 26, who were already aboard the space station. About a month before lift-off, one of the original crew members, Tim Kopra, was injured in a bicycle accident. He was replaced by Stephen Bowen.
STS-130 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleEndeavour's primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST on February 8, 2010, and landed at 22:22 EST on February 21, 2010, on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.
The Integrated Truss Structure (ITS) of the International Space Station (ISS) consists of a linear arranged sequence of connected trusses on which various unpressurized components are mounted such as logistics carriers, radiators, solar arrays, and other equipment. It supplies the ISS with a bus architecture. It is approximately 110 meters long and is made from aluminium and stainless steel.
The Space Systems Processing Facility (SSPF), originally the Space Station Processing Facility, is a three-story industrial building at Kennedy Space Center for the manufacture and processing of flight hardware, modules, structural components and solar arrays of the International Space Station, and future space stations and commercial spacecraft. It was built in 1992 at the space complex's industrial area, just east of the Operations and Checkout Building.
An EXpedite the PRocessing of Experiments to Space Station (ExPRESS) Logistics Carrier (ELC) is an unpressurized attached payload platform for the International Space Station (ISS) that provides mechanical mounting surfaces, electrical power, and command and data handling services for Orbital Replacement Units (ORUs) as well as science experiments on the ISS. The ELCs were developed primarily at the Goddard Space Flight Center in Greenbelt, Maryland, with support from JSC, KSC, and MSFC. ELC was formerly called "Express Pallet" and is the unpressurized counterpart to the pressurized ExPRESS Rack. An ELC provides scientists with a platform and infrastructure to deploy experiments in the vacuum of space without requiring a separate dedicated Earth-orbiting satellite.
The European Technology Exposure Facility (EuTEF) was a payload mounted on the exterior of the European Columbus laboratory, one of the modules of the International Space Station. The facility, mounted onto the exterior of Columbus, provided a platform for multiple types of experiments and materials to be exposed directly to the harsh space environment.
The US Orbital Segment (USOS) is the name given to the components of the International Space Station (ISS) constructed and operated by the United States National Aeronautics and Space Administration (NASA), European Space Agency (ESA), Canadian Space Agency (CSA) and Japan Aerospace Exploration Agency (JAXA). The segment consists of eleven pressurized components and various external elements, almost all of which were delivered by the Space Shuttle.
Integrated Cargo Carrier (ICC) was a project, started in 1997 by the companies Spacehab and Airbus DS Space Systems, to develop a family of flight proven and certified cross-the-bay cargo carriers designed to fly inside the Space Shuttle cargo bay, installed either horizontally or vertically, and able to carry up to 8000 lbs. of unpressurized cargo into orbit. Airbus owns the ICC fleet of carriers.
Orbital replacement units (ORUs) are key elements of the International Space Station that can be readily replaced when the unit either passes its design life or fails. ORUs are parts of the main systems and subsystems of the external elements of the ISS, none are intended to be installed inside the pressurised modules. Examples of ORUs are: pumps, storage tanks, controller boxes, antennas, and battery units. Such units are replaced either by astronauts during EVA or by the Dextre (SPDM) robotic arm. All are stored on the three external stowage platforms (ESPs) or the four ExPRESS Logistics Carriers (ELCs) mounted on the Integrated Truss Structure (ITS).
SpaceX CRS-20, also known as SpX-20, was a Commercial Resupply Services mission to the International Space Station (ISS) launched on 7 March 2020. The mission was contracted by NASA and flown by SpaceX. It was the final flight of Dragon 1 and concluded the NASA Commercial Resupply Services (CRS-1) contract extension.
Expedition 63 was the 63rd long duration mission to the International Space Station, which began on 17 April 2020 with the undocking of the Soyuz MS-15 spacecraft and continued until the undocking of the Soyuz MS-16 spacecraft on 21 October 2020, an unusual double-length expedition increment. The expedition initially consisted of American commander Chris Cassidy, as well as Russian flight engineers Anatoli Ivanishin and Ivan Vagner. On 31 May 2020, the Expedition welcomed the crew of Crew Dragon Demo-2, the first crewed flight of SpaceX's Crew Dragon spacecraft, named Endeavour after the eponymous Space Shuttle vehicle. The mission's two crew members Doug Hurley and Bob Behnken undocked from the International Space Station on 1 August 2020 to help bolster research on the station and participate in several spacewalks outside of the station.
NG-13, previously known as OA-13, was the fourteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its thirteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 15 February 2020 at 20:21:01 UTC after nearly a week of delays. This is the second launch of Cygnus under the CRS-2 contract.
Expedition 64 was the 64th long-duration expedition to the International Space Station (ISS) that began on 21 October 2020 with the undocking and departure of Soyuz MS-16. The expedition started with the three crew members who launched onboard Soyuz MS-17 and reached its full complement with the arrival of SpaceX Crew-1, the first operational flight of NASA's Commercial Crew Program (CCP). As Crew-1 consists of a crew of four instead of three like the Soyuz, Expedition 64 marks the beginning of operations for crews of seven on the ISS. In the final week of the mission, Soyuz MS-18 and its three person crew joined the mission. The expedition ended on 17 April 2021 with the departure of Soyuz MS-17.
Bartolomeo is partially operational and in a safe configuration following the connection of four of six cables to the science platform, and the final two cables that could not be connected will be attended to on a future spacewalk.
This article incorporates public domain material from Columbus - External Payload Facility (Columbus-EPF). NASA.