Materials International Space Station Experiment

Last updated
MISSE's logo MISSE Logo.jpg
MISSE's logo

The Materials International Space Station Experiment (MISSE) is a series of experiments mounted externally on the International Space Station (ISS) that investigates the effects of long-term exposure of materials to the harsh space environment.

Contents

The MISSE project evaluates the performance, stability, and long-term survivability of materials and components planned for use by NASA, commercial companies and the Department of Defense (DOD) on future low Earth orbit (LEO), synchronous orbit and interplanetary space missions. The Long Duration Exposure Facility (LDEF), which was retrieved in 1990 after spending 68 months in LEO, revealed that space environments are very hostile to many spacecraft materials and components. Atomic oxygen, which is the most prevalent atomic species encountered in low earth orbit, is highly reactive with plastics and some metals, causing severe erosion.

There is also extreme ultraviolet radiation due to the lack of an atmospheric filter. This radiation deteriorates and darkens many plastics and coatings. The vacuum in space also alters the physical properties of many materials. Impacts of meteoroids and orbiting man-made debris can damage all materials exposed in space. The combined effects of all of these environments on spacecraft can only be investigated in space. MISSE evaluates materials currently being used and those planned for use in future space missions. [1]

The MISSE program is a direct successor to the Mir Environmental Effects Payloads (MEEPs) that were attached for over a year to the Mir Docking Module of the space station Mir between shuttle flights STS-76 and STS-86; [2] and is a descendant of the Long Duration Exposure Facility. Also MEEPS can trace their inception to the Passive Optical Sample Array (POSA) sample trays flown on STS-1 and STS-2, and their successor Effects of Oxygen Interaction with Materials (EOIM) on STS-3 and STS-5.

MISSE PEC closed Closed MISSE Tray.jpg
MISSE PEC closed
MISSE PEC closed MISSE PEC closed.png
MISSE PEC closed

Materials tested

About 1,508 samples are being tested on the MISSE project. Samples range from components such as switches, sensors and mirrors to materials like polymers, coatings, and composites. There are also biological materials such as seeds, spores and various types of bacteria being evaluated. Each material on the mission had to be individually tested in the laboratory prior to being selected. The ultimate test for the materials is when they are exposed to the space environment. In the laboratory, each material can only be exposed to one particular simulated environment at a time. In space, they are exposed to all of the environments at once. Besides testing new materials, MISSE will also be addressing questions concerning current materials, such as those being used in communication satellites which are being plagued with premature failures of the solar cell power arrays. New generations of solar cells with longer expected lifetimes will also be tested.

MISSE will also be testing coatings used to control heat absorption and emission temperatures of satellites. The hostile environment of space limits the useful life of coatings. New coatings, which are expected to be much more stable in space and therefore have longer useful lives, will be tested. MISSE will also address a major problem for a manned exploration of Mars: shielding the crew from the very energetic cosmic rays found in interplanetary space. New concepts for lightweight shields will be tested on MISSE. Ultra-light membrane structures are planned for solar sails, large inflatable mirrors and lenses. The effects of micrometeoroid impacts on these materials will also be investigated. [1]

MISSE data (MISSE 1 - 7) is now open to the public through a registered account at http://materialsinspace.nasa.gov/. Where possible NASA has tried to collect past MISSE experiments and make the data available to the public. Data is still being collected from researchers and added to the MISSE database.

Deploying MISSE

The materials selected for the mission are placed into briefcase-like Passive Experiment Containers (PECs). The PECs are used for transporting experiments to and from ISS. During an EVA they are placed on handrails or at an exposed experiment facility of the ISS. The containers are opened fully (360°) so the two surfaces with experiments are facing in opposite directions. The experiments are photographed several times during their stay outside if possible, usually whenever an opportunity arises due to a scheduled EVA. After exposure in space, MISSE is retrieved in the same manner as it was deployed, the material samples are tested to see if they still have the unique properties needed to complete space missions. MISSEs have active and passive detectors to give a time-history reading, or a reading of what happened to the materials at certain points in time. Back on the ground, tests will be conducted to determine the effects of its exposure. These tests will determine which materials are strong enough to survive in space.

Originally it was planned to have MISSE-1 and 2 deployed for about a year and MISSE-3 and 4 for up to three years. Due to the grounding of the shuttle fleet after the Space Shuttle Columbia disaster required that changes be made to these plans. MISSEs 1 and 2 provided the three-year data and MISSEs 3 and 4 have provided the one-year data. [3]

MISSE-1 and MISSE-2

The first and second set of experiments was launched by Space Shuttle Discovery, during mission STS-105, on 10 August 2001 and contained 910 specimens of various materials. [4] It was installed in two separate airlock handrails located on the Quest Joint Airlock and high-pressure gas tanks. [5]

On 30 July 2005, during the first EVA of mission STS-114, both experiments were retrieved. [6]

MISSE-5

This was the third MISSE experiment launched, although the fifth MISSE PEC. MISSE-5 was launched by Space Shuttle Discovery on mission STS-114, on 26 July 2005 and contained 254 specimens of various materials. [7] It was installed on the P6 truss and a year later, during the third EVA of mission STS-115 on 15 September 2006, the MISSE-5 package was retrieved. [8]

MISSE-5 contained three investigations. One experiment the Forward Technology Solar Cell Experiment (FTSCE), a performance test of 36 solar cells for use on future spacecraft. The second investigation measured the degradation of more than 200 flexible materials in the space environment. The third experiment involved the PCSat-2 that provided a communications system and tested the Amateur Satellite Service off-the-shelf solution for telemetry command and control. MISSE-5 was the first active experiment of the MISSE series. It required power and could communicate with the ground through PCSat-2. [9]

MISSE-3 and MISSE-4

The fourth and fifth set of MISSE experiments (MISSE PEC3 and MISSE PEC4) were launched by Space Shuttle Discovery, during mission STS-121, on 3 August 2006 and contained 875 specimens of various materials. [10] The MISSE-3 was installed on one of the high-pressure tanks around the crew lock and the MISSE-4 on the outboard end of the Quest Joint Airlock by the Expedition 13's crew. [11] A year later, during the fourth EVA of mission STS-118 on 18 August 2007, the MISSE-3 and 4 experiments were retrieved. [12]

MISSEs 3 and 4 also served an educational purpose, it flew approximately eight million basil seeds that were given to children for science experiments, in order to stimulate interest in space science. [3]

MISSE-6

The sixth set of MISSE experiments, labeled 6A and 6B, were launched by Space Shuttle Endeavour, during mission STS-123, on 13 March 2008 and contain over 400 specimens of various materials. [13] It was installed on the Columbus External Payload Facility. Installation was attempted during the third EVA, however the case did not initially fit onto the bracket. [14] It was successfully installed during the fifth EVA. [15]

Both MISSE 6A and 6B were retrieved during the first EVA of mission STS-128 and returned to Earth in September 2009. [16] [17]

MISSE-7

The seventh set of MISSE experiments was located on an ExPRESS payload adapter (ExPA) [18] :6 on ExPRESS Logistics Carrier 2. [19] They were brought to the station (on ELC-2) in November 2009 aboard mission STS-129.

MISSE-7 is composed of two suitcase-sized Passive Experiment Containers (PECs), identified as MISSE 7A and MISSE 7B. Once installed in the exterior of ISS by space walking astronauts, the PECs were opened. The orientation of MISSE 7A was space facing/Earth facing while MISSE 7B faced forward/backward relative to the ISS orbit. Both MISSE 7A and MISSE 7B contained active and passive experiments. Passive experiments are designed for pre- and post-flight evaluation in ground-based laboratories. Being a first in the MISSE program, active experiments are designed to interface with the power and communication systems on ISS allowing data to be transmitted back to Earth.

MISSE-7 also contained experiments mounted to its ExPA base. These experiments included SpaceCube which was developed by engineers at the NASA Goddard Space Flight Center and is a reconfigurable, high-performance system based on Xilinx's Virtex-4 commercial FPGAs designed for spaceflight applications requiring compute intensive on-board processing. The MISSE-7 SpaceCube's purpose was to serve as an "on-orbit" test-bed for demonstrating "radiation hardened by software" program execution and error detection and correction techniques that will help enable the use of commercial processing devices in space. [20]

The active experiments on 7A included the Single Events Upset Xilinx-Sandia Experiment [18] :35 which detected radiation effects on active FPGA circuits and detected more upset events at high latitudes and in the South Atlantic Anomaly. [18] :20

The Naval Research Laboratory handled primary responsibility for MISSE 7A, while the Air Force Research Laboratory, NASA, Boeing, other industry collaborators, and academia had experiments on MISSE 7B. [21]

The two PECs were collected for return to Earth during the STS-134 mission.

MISSE-7 Experiments

MISSE-8

The STS-134 mission, launched May 2011, delivered the MISSE PEC8 experiment and returned MISSE PEC7A & PEC7B to earth. MISSE-7 had been on the ISS since its delivery on STS-129. [23]

On STS-134 MISSE-8 was only one PEC, STS-135 crewmen added the MISSE-8 ORMatE-III exposure plate to the second MISSE mount.

MISSE-8 PEC and ORMatE-III exposure plate were scheduled to be retrieved on Feb. 2014 via EVA. They were returned inside the SpaceX Dragon capsule as part of the SpX-3 mission. [24]

MISSE-FF

The Materials ISS Experiment Flight Facility (MISSE-FF) platform provides the ability to test materials, coatings, and components or other larger experiments in the harsh environment of space, which is virtually impossible to do collectively on Earth. Testing in low-Earth orbit (LEO) allows the integrated testing of how materials react to exposure to ultraviolet radiation (UV), atomic oxygen (AO), ionizing radiation, ultrahigh vacuum (UHV), charged particles, thermal cycles, electromagnetic radiation, and micro-meteoroids in the LEO environment.

MISSE-FF is a continuation of the l MISSE 1 through MISSE 8 flight payloads, but is a completely new design that eliminates the need for Extravehicular Activities (EVA) for MISSE operations. MISSE-FF is a cooperative endeavor between Alpha Space and the ISS Program, and is designed with a base-structure and avionics that reside on the ISS for the duration of ISS. MISSE Sample Carriers (MSCs) are attached, and later retrieved using the ISS Canadarm 2. MSCs are launched up to the facility, and then returned to Earth at the end of the testing period. MISSE-FF is operated robotically from the ground with no planned crew interfaces required for facility operations, except for loading future MISSE Sample Carriers (MSCs) on the transfer tray for transporting the MSC's through the JEM airlock, and subsequently unloading MSCs from the transfer tray and preparing MSCs for return to Earth. The facility is a development of new technology and systems not previously available to the materials science community. A new feature, not available in the past, is the ability of each MSC to take pictures of each sample on a monthly basis (or more often if required) which is provided to each Principal Investigator to monitor the status of their sample/experiment throughout its time on orbit. MISSE MSCs also offers power and data options for experiments that require data collection and/or power for their experiments. MISSE-FF offers four space viewing directions for testing of samples or experiments: Ram (view forward as the ISS moves in its orbit), Wake (viewing behind the ISS similar to the wake of a boat in water), Zenith (viewing away from earth into deep space and toward the sun), and Nadir (viewing down toward the earth). Scientists test for material, or component durability, such as accelerated degradation, space contamination adherence, and mass loss.

Participants in MISSE

The MISSE Project is a cooperative endeavor managed by NASA Langley Research Center. Participants include: NASA Johnson Space Center, NASA Marshall Space Flight Center, NASA Glenn Research Center, the Materials Laboratory at the Air Force Research Laboratory, the Naval Research Laboratory, [25] Infosight Corporation and the Boeing Phantom Works. Shuttle/ISS MISSE integration is performed by the USAF's DoD Space Shuttle and ISS Payload Integration Directorate.

Related Research Articles

<i>Columbus</i> (ISS module) ESA science observatory on the International Space Station

Columbus is a science laboratory that is part of the International Space Station (ISS) and is the largest single contribution to the ISS made by the European Space Agency (ESA).

STS-51 Fifty-seventh Space Shuttle mission, seventeen orbital flight of the Space Shuttle Discovery

STS-51 was a NASA Space Shuttle Discovery mission that launched the Advanced Communications Technology Satellite (ACTS) in September 1993. The flight also featured the deployment and retrieval of the SPAS-ORFEUS satellite and its IMAX camera, which captured spectacular footage of Discovery in space. A spacewalk was also performed during the mission to evaluate tools and techniques for the STS-61 Hubble Space Telescope (HST) servicing mission later that year. STS-51 was the first shuttle mission to fly a Global Positioning System (GPS) receiver, a Trimble TANS Quadrex. It was mounted in an overhead window where limited field of view (FoV) and signal attenuation from the glass severely impacted receiver performance. Full triple-redundant 3-string GPS would not happen until 14 years later with STS-118 in 2007.

STS-72 1996 Space Shuttle Endeavour mission

STS-72 was a Space Shuttle Endeavour mission to capture and return to Earth a Japanese microgravity research spacecraft known as Space Flyer Unit (SFU). The mission launched from Kennedy Space Center, Florida on 11 January 1996.

STS-105 Space Shuttle mission to the International Space Station

STS-105 was a mission of the Space Shuttle Discovery to the International Space Station, launched from Kennedy Space Center, Florida, 10 August 2001. This mission was Discovery's final mission until STS-114, because Discovery was grounded for a refit, and then all Shuttles were grounded in the wake of the Columbia disaster. The refit included an update of the flight deck to the glass cockpit layout, which was already installed on Atlantis and Columbia.

STS-121 Space Shuttle mission to the International Space Station

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleDiscovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and German European Space Agency (ESA) astronaut Thomas Reiter to the ISS.

STS-116 Space Shuttle mission to the International Space Station

STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. Discovery lifted off on 9 December 2006 at 20:47:35 EST. A previous launch attempt on 7 December had been canceled due to cloud cover. It was the first night launch of a Space Shuttle since STS-113 in November 2002.

STS-117 Space Shuttle mission to the International Space Station

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on 8 June 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on 26 February 2007 had previously caused the launch to be postponed from an originally-planned launch date of 15 March 2007. The launch of STS-117 marked the 250th orbital human spaceflight.

STS-119 Space Shuttle mission to the International Space Station

STS-119 was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on 15 March 2009, at 19:43 EDT. Discovery successfully landed on 28 March 2009, at 15:13 pm EDT.

STS-127 Space Shuttle mission to the International Space Station

STS-127 was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of Space ShuttleEndeavour. The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility, and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995.

Mir Environmental Effects Payload

The Mir Environmental Effects Payload (MEEP) was a set of four experiments installed on the Russian space station Mir from March 1996 to October 1997 to study the effects of space debris impacts and exposure to the space environment on a variety of materials. The materials used in the experiments were being considered for use on the International Space Station, and by exposing them at a similar orbital altitude to that flown by the ISS, the experiments provided an assessment of the performance of those materials in a similar space environment. MEEP also fulfilled the need to examine the occurrence and effects of man-made debris and natural micrometeoroids through capture and impact studies. The experiments were installed on the Mir docking module during STS-76, and retrieved during STS-86.

STS-126 2008 Space Shuttle Endeavour mission

STS-126 was the one hundred and twenty-fourth NASA Space Shuttle mission, and twenty-second orbital flight of the Space Shuttle Endeavour (OV-105) to the International Space Station (ISS). The purpose of the mission, referred to as ULF2 by the ISS program, was to deliver equipment and supplies to the station, to service the Solar Alpha Rotary Joints (SARJ), and repair the problem in the starboard SARJ that had limited its use since STS-120. STS-126 launched on 15 November 2008 at 00:55:39 UTC from Launch Pad 39A (LC-39A) at NASA's Kennedy Space Center (KSC) with no delays or issues. Endeavour successfully docked with the station on 16 November 2008. After spending 15 days, 20 hours, 30 minutes, and 30 seconds docked to the station, during which the crew performed four spacewalks, and transferred cargo, the orbiter undocked on 28 November 2008. Due to poor weather at Kennedy Space Center, Endeavour landed at Edwards Air Force Base on 30 November 2008 at 21:25:09 UTC.

STS-124 Space Shuttle mission to the International Space Station

STS-124 was a Space Shuttle mission, flown by Space Shuttle Discovery to the International Space Station. Discovery launched on 31 May 2008 at 17:02 EDT, moved from an earlier scheduled launch date of 25 May 2008, and landed safely at the Kennedy Space Center's Shuttle Landing Facility, at 11:15 EDT on 14 June 2008. Its objective was to deliver the largest module of the space station – Kibō, the Japanese Experiment Module pressurized section. The mission is also referred to as ISS-1J by the ISS program.

STS-128 Space Shuttle mission to the International Space Station

STS-128 was a NASA Space Shuttle mission to the International Space Station (ISS) that launched on 28 August 2009. Space ShuttleDiscovery carried the Multi-Purpose Logistics Module Leonardo as its primary payload. Leonardo contained a collection of experiments for studying the physics and chemistry of microgravity. Three spacewalks were carried out during the mission, which removed and replaced a materials processing experiment outside ESA's Columbus module, and returned an empty ammonia tank assembly.

STS-129 Space Shuttle mission to the International Space Station

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009 at 14:28 EST, and landed at 09:44 EST on November 27, 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last shuttle launch of the 2000s.

STS-132 2010 Space Shuttle "Atlantis" mission to dock with the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on 16 May 2010. STS-132 was launched from the Kennedy Space Center on 14 May 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on 26 May 2010.

Randolph Bresnik United States Marine Corps officer and a NASA astronaut on three expeditions

Randolph James "Komrade" Bresnik is a retired officer in the United States Marine Corps and an active NASA astronaut. A Marine Aviator by trade, Bresnik was selected as a member of NASA Astronaut Group 19 in May 2004. He first launched to space on STS-129, then served as Flight Engineer for Expedition 52, and as ISS Commander for Expedition 53.

The Space Test Program (STP) is the primary provider of spaceflight for the United States Department of Defense (DoD) space science and technology community. STP is managed by a group within the Advanced Systems and Development Directorate, a directorate of the Space and Missile Systems Center of the United States Space Force. But STP is a DoD-wide organization. STP provides spaceflight via the International Space Station (ISS), piggybacks, secondary payloads and dedicated launch services.

ExPRESS Logistics Carrier Module on the International Space Station

An EXpedite the PRocessing of Experiments to Space Station (ExPRESS) Logistics Carrier (ELC) is an unpressurized attached payload platform for the International Space Station (ISS) that provides mechanical mounting surfaces, electrical power, and command and data handling services for Orbital Replacement Units (ORUs) as well as science experiments on the ISS. The ELCs were developed primarily at the Goddard Space Flight Center in Greenbelt, Maryland, with support from JSC, KSC, and MSFC. ELC was formerly called "Express Pallet" and is the unpressurized counterpart to the pressurized ExPRESS Rack. An ELC provides scientists with a platform and infrastructure to deploy experiments in the vacuum of space without requiring a separate dedicated Earth-orbiting satellite.

STS-134 25th and last spaceflight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final space shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

SpaceCube

SpaceCube is a family of high-performance reconfigurable systems designed for spaceflight applications requiring on-board processing. The SpaceCube was developed by engineers at the NASA Goddard Space Flight Center. The SpaceCube 1.0 system is based on Xilinx's Virtex-4 commercial FPGAs. The debut mission of the SpaceCube 1.0, Hubble Servicing Mission 4, was the first time Xilinx's Virtex-4 FPGAs flew in space.

References

  1. 1 2 "MISSE: Testing materials in space". NASA. July 2001. Retrieved 2008-03-25.
  2. William H. Kinard. "MIR Environmental Effects Payload (MEEP) Archive System". NASA, Langley Research Center. Archived from the original on 2008-03-07. Retrieved 2008-03-25.
  3. 1 2 "MISSE makes its mark". NASA, Langley Research Center. October 10, 2005. Retrieved 2008-03-28.
  4. "MISSE 1 and MISSE 2". NASA.
  5. "STS-105, MCC Status Report # 13". NASA, Lyndon B. Johnson Space Center. August 16, 2001. Archived from the original on August 9, 2002. Retrieved 2008-03-25.
  6. "STS-114 MCC Status Report #09". NASA, Mission Control Center. July 30, 2005. Retrieved 2008-03-25.
  7. "MISSE 5". NASA.
  8. "STS-115 MCC Status Report #12". NASA.
  9. "Materials International Space Station Experiment - 5 (MISSE-5)". NASA. Archived from the original on 2008-02-27.
  10. "MISSE 3 and MISSE 4". NASA.
  11. "Station Crewmen Back Inside After Spacewalk". NASA.
  12. "STS-118 MCC Status Report #21". NASA.
  13. "Materials International Space Station Experiment - 6A and 6B (MISSE-6A and 6B)". NASA. Archived from the original on 2009-07-08.
  14. "STS-123 MCC Status Report #15". NASA.
  15. "STS-123 MCC Status Report #25". NASA.
  16. "STS-128 Shuttle Report | All objectives accomplished during spacewalk No. 1". Spaceflight Now. Retrieved 2016-02-16.
  17. "Return to Sender: MISSE-6 Comes Home After More Than a Year in Space". Archived from the original on September 5, 2009. Retrieved September 8, 2009.
  18. 1 2 3 Lee, David S.; Kalb, Jeffrey L.; Bullington, David M.; Blansett, Ethan L. (1 August 2010). "Sandia-Xilinx Virtex Fpga Seu Experiment on the International Space Station" via www.osti.gov.{{cite journal}}: Cite journal requires |journal= (help)
  19. "Materials International Space Station Experiment - 7 (MISSE-7)". Archived from the original on December 10, 2008. Retrieved October 17, 2009.
  20. 1 2 David Petrick (2009). "MAPLD2009 - SpaceCube Activities". NASA.
  21. Donald A. Jaworske and John Siamidis. "Overview of Materials International Space Station Experiment 7B" (PDF). Retrieved 6 November 2009.
  22. David Petrick (2009). "MAPLD2009 - RNS SpaceCube". NASA.
  23. Chris Gebhardt (2009). "STS-134: PRCB Baselines Penultimate Shuttle Flight to Take AMS to Station". NASASpaceflight.com. Retrieved Jan 19, 2010.
  24. "Expedition 36 Update: July 1, 2013 | NASA". Nasa.gov. 2013-07-01. Retrieved 2016-02-16.
  25. "NRL's MISSE-8 Launched Aboard STS-134 - U.S. Naval Research Laboratory". www.nrl.navy.mil. Archived from the original on 2013-01-29.