Construction communication

Last updated

Construction communication, within an organizational context, is to convey an instruction to influence the actions/behaviors of others, or may involve an exchange of, or request for information during a construction project. [1]

Contents

Background

Communication usually involves the transfer of information, a generic term that embraces meaning such as knowledge, processed data, skills and technology. [2]

Communication within project-based environments presents special challenges. This is especially true within the construction industry, where interaction [ disambiguation needed ] tends to be characterised by unfamiliar groups of people coming together for short periods before disbanding to work on other endeavours. [1]

Importance

Per M.E.L. Hoezen, the author of The problem of communication in construction.

The efficiency and effectiveness of the construction process strongly depend on the quality of

communication. In literature four reasons are mentioned why improvements in communication are

needed. The first reason is that an improvement in the communication within the building team, in project teams and between project manager and contractors, could reduce failure. Second, more open communication at all levels could lead to innovations and better technical solutions. Third, communication improvements in early phases of projects would positively influence the quality as perceived by all stakeholders involved. Finally, improved communication during the briefing might lead to better decision making, for example less haste in moving to solutions and better ways of looking at the requirements first. [3]

Communication is essential to all business activities; it enables an organization, and is an integral part of the construction process. Beyond the argument, any improvement in communication can improve an organization's operating effectiveness. Good communication within an organization and between organizations contributing to the construction project can improve motivation levels and improve the processes. Conversely, inadequate communication can result in a demotivated workforce and lead to problems in construction. [4]

Construction projects are complex and risky, requiring the active participation of all contributors. Co-operation and co-ordination of activities through interpersonal and group communication are essential in ensuring the project is completed successfully. Poor communication, lack of consultation and inadequate feedback are to be found as the root cause of defects in many constructed works. Poor co-ordination and communication of design information lead to design problems that cause design errors. Communication is the one aspect of the management of projects that pervades all others. [4]

Given that construction is such a fragmented, dynamic and disparate sector, the challenges of communicating effectively are greater than in most other production environments. Contractually driven relationships, conflict and a lack of mutual respect and trust, all combine to hinder open communication and render the role of the project manager extremely demanding and problematic. Nevertheless, addressing communication in the industry can be seen as a principal enabler for improving the industry in the future.

Issues

Since the early 1940s, literature on communication in construction has appeared, mainly based on the situation in the UK. [4]

Many problems concerning communication have been reported, with a focus on intra-supplier communication within the construction sector; demand-supply communication during the design phase; and communication between and within single demand and supply side parties, during whole the construction process. [4]

With the globalization of the construction industry, emerging issues in construction communication in international contexts, such as problem-solving in international projects, have started to receive more attention. [5] [6]

See also

Related Research Articles

The ISO 9000 family is a set of five quality management systems (QMS) standards that help organizations ensure they meet customer and other stakeholder needs within statutory and regulatory requirements related to a product or service. ISO 9000 deals with the fundamentals of QMS, including the seven quality management principles that underlie the family of standards. ISO 9001 deals with the requirements that organizations wishing to meet the standard must fulfill. ISO 9002 is a model for quality assurance in production and installation. ISO 9003 for quality assurance in final inspection and test. ISO 9004 gives guidance on achieving sustained organizational success.

ISO 14000 is a family of ‘standards’ - the standard (14001) + guidelines - related to environmental management that exists to help organizations (a) minimize how their operations negatively affect the environment ; (b) comply with applicable laws, regulations, and other environmentally oriented requirements; and (c) continually improve in the above.

Benchmarking is the practice of comparing business processes and performance metrics to industry bests and best practices from other companies. Dimensions typically measured are quality, time and cost.

Organization development (OD) is the study and implementation of practices, systems, and techniques that affect organizational change. The goal of which is to modify a group's/organization's performance and/or culture. The organizational changes are typically initiated by the group's stakeholders. OD emerged from human relations studies in the 1930s, during which psychologists realized that organizational structures and processes influence worker behavior and motivation.

<span class="mw-page-title-main">Team building</span> Term for activities used to enhance social relations and define roles within teams

Team building is a collective term for various types of activities used to enhance social relations and define roles within teams, often involving collaborative tasks. It is distinct from team training, which is designed by a combine of business managers, learning and development/OD and an HR Business Partner to improve the efficiency, rather than interpersonal relations.

Kaizen is a concept referring to business activities that continuously improve all functions and involve all employees from the CEO to the assembly line workers. Kaizen also applies to processes, such as purchasing and logistics, that cross organizational boundaries into the supply chain. It has been applied in healthcare, psychotherapy, life coaching, government, manufacturing, and banking.

<span class="mw-page-title-main">Problem-based learning</span> Learner centric pedagogy

Problem-based learning (PBL) is a student-centered pedagogy in which students learn about a subject through the experience of solving an open-ended problem found in trigger material. The PBL process does not focus on problem solving with a defined solution, but it allows for the development of other desirable skills and attributes. This includes knowledge acquisition, enhanced group collaboration and communication.

Implementation is the realization of an application, or execution of a plan, idea, model, design, specification, standard, algorithm, or policy.

Development communication refers to the use of communication to facilitate social development. Development communication engages stakeholders and policy makers, establishes conducive environments, assesses risks and opportunities and promotes information exchange to create positive social change via sustainable development. Development communication techniques include information dissemination and education, behavior change, social marketing, social mobilization, media advocacy, communication for social change, and community participation.

Design for Six Sigma (DFSS) is an engineering design process, business process management method related to traditional Six Sigma. It is used in many industries, like finance, marketing, basic engineering, process industries, waste management, and electronics. It is based on the use of statistical tools like linear regression and enables empirical research similar to that performed in other fields, such as social science. While the tools and order used in Six Sigma require a process to be in place and functioning, DFSS has the objective of determining the needs of customers and the business, and driving those needs into the product solution so created. It is used for product or process design in contrast with process improvement. Measurement is the most important part of most Six Sigma or DFSS tools, but whereas in Six Sigma measurements are made from an existing process, DFSS focuses on gaining a deep insight into customer needs and using these to inform every design decision and trade-off.

<span class="mw-page-title-main">Business process re-engineering</span> Business management strategy

Business process re-engineering (BPR) is a business management strategy originally pioneered in the early 1990s, focusing on the analysis and design of workflows and business processes within an organization. BPR aims to help organizations fundamentally rethink how they do their work in order to improve customer service, cut operational costs, and become world-class competitors.

The Committee of Sponsoring Organizations of the Treadway Commission (COSO) is an organization that develops guidelines for businesses to evaluate internal controls, risk management, and fraud deterrence. In 1992 (and subsequently re-released in 2013), COSO published the Internal Control - Integrated Framework, commonly used by businesses in the United States to design, implement, and conduct systems of internal control over financial reporting and assessing their effectiveness.

DMAIC refers to a data-driven improvement cycle used for improving, optimizing and stabilizing business processes and designs. The DMAIC improvement cycle is the core tool used to drive Six Sigma projects. However, DMAIC is not exclusive to Six Sigma and can be used as the framework for other improvement applications.

Software project management is the process of planning and leading software projects. It is a sub-discipline of project management in which software projects are planned, implemented, monitored and controlled.

Joint application design (JAD) is a process used in the life cycle area of the dynamic systems development method (DSDM) to collect business requirements while developing new information systems for a company. "The JAD process also includes approaches for enhancing user participation, expediting development, and improving the quality of specifications." It consists of a workshop where "knowledge workers and IT specialists meet, sometimes for several days, to define and review the business requirements for the system." The attendees include high level management officials who will ensure the product provides the needed reports and information at the end. This acts as "a management process which allows Corporate Information Services (IS) departments to work more effectively with users in a shorter time frame".

Data governance is a term used on both a macro and a micro level. The former is a political concept and forms part of international relations and Internet governance; the latter is a data management concept and forms part of corporate data governance.

<span class="mw-page-title-main">Avanti (project)</span>

Avanti was established by the UK Department of Trade and Industry in 2002 to formulate an approach to collaborative working in order to enable construction project partners to work together effectively. The project was promoted by the Department of Trade and Industry with the support of most of the largest UK firms in the construction industry. Avanti also involved the International Alliance for Interoperability (IAI), Loughborough University and Co-Construct, a network of five construction research and information organizations.

A glossary of terms relating to project management and consulting.

<span class="mw-page-title-main">Working group</span>

A working group, or working party, is a group of experts working together to achieve specified goals. The groups are domain-specific and focus on discussion or activity around a specific subject area. The term can sometimes refer to an interdisciplinary collaboration of researchers working on new activities that would be difficult to sustain under traditional funding mechanisms.

Total productive maintenance (TPM) started as a method of physical asset management, focused on maintaining and improving manufacturing machinery in order to reduce the operating cost to an organization. After the PM award was created and awarded to Nippon Denso in 1971, the JIPM, expanded it to include 8 Activities of TPM that required participation from all areas of manufacturing and non-manufacturing in the concepts of lean manufacturing. TPM is designed to disseminate the responsibility for maintenance and machine performance, improving employee engagement and teamwork within management, engineering, maintenance, and operations.

References

  1. 1 2 Dainty, Andrew Dainty; Moore, David; Murray, Michael. (20 January 2006). Communication in Construction Theory and Practice. Routledge. ISBN   0-415-32723-7.
  2. Cheng, E., H. Li, P. Love, and Z. Irani. 2001. Network communication in the construction industry. Within construction, information is exceptionally diverse given the huge number of parties involved with the construction operations Corporate Communication, 61–71
  3. Hoezen, M.E.L. The Problem of Communication in Construction. University of Twente. Retrieved 23 December 2011.
  4. 1 2 3 4 Emmitt, Stephen; Gorse, Christopher A. (2003). Construction communication. Wiley-Blackwell. ISBN   1-4051-0002-8.
  5. Handford Michael and Petr Matous (2011) Lexicogrammar in the international construction industry: A corpus-based case study of Japanese-Hong-Kongese on-site interactions in English, English for Specific Purposes, Volume 30, Issue 2, Pages 87–100.
  6. Handford Michael and Petr Matous (2015) Problem-solving discourse on an international construction site: Patterns and practices English for Specific Purposes, Volume 18, Pages 85–98.