DRAGONSat

Last updated
DRAGONSat
DRAGONSat deployed.jpg
DRAGONSat as photographed after its release from Space Shuttle Endeavour's payload bay
COSPAR ID 2009-038B OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 35690 OOjs UI icon edit-ltr-progressive.svg
Start of mission
Launch dateJuly 30, 2009(UTC) (2009-07-30Z)
Rocket Space Shuttle Endeavour
Launch site Kennedy LC-39A
End of mission
DisposalFailed to separate from companion
Orbital parameters
Reference systemgeocentric
Regime LEO
Inclination 51.7°

DRAGONSat (Dual RF Astrodynamic GPS Orbital Navigator Satellite) was a 2000s pair of nanosatellites that were to demonstrate autonomous rendezvous and docking (ARD) in low Earth orbit (LEO) for NASA. It was intended to gather flight data with a global positioning system (GPS) receiver strictly designed for space applications to gather flight data in the space environment. ARD is the capability of two independent spacecraft to rendezvous in orbit and dock without crew intervention. The mission failed when the DRAGONSats failed to separate from their carrier spacecraft.

Contents

One DRAGONSat was built by the University of Texas and the other one was built by Texas A and M University, the Space Shuttle Payload Launcher (SSPL), These satellite projects were planned to rendezvous and dock with each other in space without the benefit of human intervention.

DRAGONSat was planned to be an eight-year program with a launch of the satellites approximately every two years. The first three missions were to test individual components and subsystems while the final mission was to culminate with the successful docking of two satellites. Each mission was planned to build on the previous mission culminating in a fully autonomous rendezvous and docking mission. Both universities were required to use GPS receivers designed by NASA in order to determine its functionality. One of the objectives was to demonstrate precision real-time navigation capability as well as precision relative navigation between the two satellites. [1]

Planned operations

DRAGONSat is a pair of two 5 inches x 5 inches x 5 inches satellites which are launched from the Shuttle orbiter payload bay. Both satellites are built of aluminum with a mass of approximately 7.5 kg. Each picosatellite is covered with photo-voltaic cells and will enable a longer active life in orbit. Each satellite also has a dipole antenna and two antennas for the GPS receiver. The satellites are ejected from the SSPL which is located on the payload bay sidewall. They were intended to be ejected as a pair and once at a safe distance from the Space Shuttle, they would separate and begin the experiment. Data collection will be downlinked to ground stations for as long as the satellites are able to transmit.

Both DRAGONSat were launched together in the Space Shuttle Payload Launcher (SSPL) from the side walls of the orbiter payload bay. The initial pair was launched on July 30, 2009 aboard STS-127, and on Flight Day 16, the first pair of DRAGONSats were inserted into orbit. Space Shuttle Endeavour placed them in orbit at 8:35 am EDT. for their planned multiyear mission to study automatic dockings in space. Deployment occurred over central South America at an altitude of 218 miles. [2] Subsequent DRAGONsat flights never occurred after the program was cancelled.

Specifications

Section source' [3]
DRAGONSat-1 "BEVO-1"
DRAGONSat-2 "AggieSat-2"

See also

Related Research Articles

<span class="mw-page-title-main">Space Shuttle</span> Partially reusable launch system and space plane

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from the 1969 plan led by U.S. Vice President Spiro Agnew for a system of reusable spacecraft where it was the only item funded for development.

<span class="mw-page-title-main">STS-51</span> 1993 American crewed spaceflight

STS-51 was a NASA Space Shuttle Discovery mission that launched the Advanced Communications Technology Satellite (ACTS) in September 1993. The flight also featured the deployment and retrieval of the SPAS-ORFEUS satellite and its IMAX camera, which captured spectacular footage of Discovery in space. A spacewalk was also performed during the mission to evaluate tools and techniques for the STS-61 Hubble Space Telescope (HST) servicing mission later that year. STS-51 was the first shuttle mission to fly a Global Positioning System (GPS) receiver, a Trimble TANS Quadrex. It was mounted in an overhead window where limited field of view (FoV) and signal attenuation from the glass severely impacted receiver performance. Full triple-redundant 3-string GPS would not happen until 14 years later with STS-118 in 2007.

<span class="mw-page-title-main">STS-74</span> 1995 American crewed spaceflight to Mir

STS-74 was the fourth mission of the US/Russian Shuttle–Mir program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis.

<span class="mw-page-title-main">STS-88</span> First Space Shuttle mission to the International Space Station

STS-88 was the first Space Shuttle mission to the International Space Station (ISS). It was flown by Space Shuttle Endeavour, and took the first American module, the Unity node, to the station.

<span class="mw-page-title-main">STS-96</span> 1999 American crewed spaceflight to the ISS

STS-96 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery, and the first shuttle flight to dock[a] at the International Space Station. The shuttle carried the Spacehab module in the payload, filled with cargo for station outfitting. STS-96 launched from Kennedy Space Center, Florida, on 27 May 1999 at 06:49:42 AM EDT and returned to Kennedy on 6 June 1999, 2:02:43 AM EDT.

<span class="mw-page-title-main">CubeSat</span> Miniature satellite in 10 cm cube modules

A CubeSat is a class of small satellite with a form factor of 10 cm (3.9 in) cubes. CubeSats have a mass of no more than 2 kg (4.4 lb) per unit, and often use commercial off-the-shelf (COTS) components for their electronics and structure. CubeSats are deployed into orbit from the International Space Station, or launched as secondary payloads on a launch vehicle. As of December 2023, more than 2,300 CubeSats have been launched.

<span class="mw-page-title-main">Small satellite</span> Satellites of low mass and size, usually under 500 kg

A small satellite, miniaturized satellite, or smallsat is a satellite of low mass and size, usually under 1,200 kg (2,600 lb). While all such satellites can be referred to as "small", different classifications are used to categorize them based on mass. Satellites can be built small to reduce the large economic cost of launch vehicles and the costs associated with construction. Miniature satellites, especially in large numbers, may be more useful than fewer, larger ones for some purposes – for example, gathering of scientific data and radio relay. Technical challenges in the construction of small satellites may include the lack of sufficient power storage or of room for a propulsion system.

<span class="mw-page-title-main">STS-127</span> 2009 American crewed spaceflight to the ISS

STS-127 was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of Space ShuttleEndeavour. The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility, and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995.

<span class="mw-page-title-main">STS-128</span> 2009 American crewed spaceflight to the ISS

STS-128 was a NASA Space Shuttle mission to the International Space Station (ISS) that launched on August 28, 2009. Space ShuttleDiscovery carried the Multi-Purpose Logistics Module Leonardo as its primary payload. Leonardo contained a collection of experiments for studying the physics and chemistry of microgravity. Three spacewalks were carried out during the mission, which removed and replaced a materials processing experiment outside ESA's Columbus module, and returned an empty ammonia tank assembly.

<span class="mw-page-title-main">STS-129</span> 2009 American crewed spaceflight to the ISS

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009, at 14:28 EST, and landed at 09:44 EST on November 27, 2009, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last Shuttle mission of the 2000s.

<span class="mw-page-title-main">STS-131</span> 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on April 5, 2010, at 6:21 am from LC-39A, and landed at 9:08 am on April 20, 2010, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

The Space Test Program (STP) is the primary provider of spaceflight for the United States Department of Defense (DoD) space science and technology community. STP is managed by a group within the Advanced Systems and Development Directorate, a directorate of the Space and Missile Systems Center of the United States Space Force. STP provides spaceflight via the International Space Station (ISS), piggybacks, secondary payloads and dedicated launch services.

<span class="mw-page-title-main">PicoSAT</span>

PicoSAT, launched on September 30, 2001, is a real time tracking satellite. The name "PICO" combines the first letters of all four of its experiments. PICOSat series are designed for a minimum of one year of on-orbit operations.

<span class="mw-page-title-main">Docking and berthing of spacecraft</span> Joining of two or more space vehicles

Docking and berthing of spacecraft is the joining of two space vehicles. This connection can be temporary, or partially permanent such as for space station modules.

<span class="mw-page-title-main">RAX-2</span> CubeSat satellite

RAX-2 is a CubeSat satellite built as a collaboration between SRI International and students at the University of Michigan College of Engineering. It is the second spacecraft in the RAX mission. The RAX-1 mission ended after approximately two months of operation due to a gradual degradation of the solar panels that ultimately resulted in a loss of power. RAX team members applied the lessons learned from RAX-1 to the design of a second flight unit, RAX-2, which performs the same mission concept of RAX-1 with improved bus performance and additional operational modes. Science measurements are enhanced through interactive experiments with high power ionospheric heaters where FAI will be generated on demand.

Technology Education Satellite (TechEdSat) is a successful nano-sat flight series conducted from the NASA Ames Research Center in collaboration with numerous universities. While one of the principal aims has been to introduce young professionals and university students to the practical realm of developing space flight hardware, considerable innovations have been introduced. In addition, this evolving flight platform has tested concepts for Low Earth Orbit (LEO) sample return, as well as planetary nano-sat class mission concepts.

<span class="mw-page-title-main">Teleoperator Retrieval System</span>

The Teleoperator Retrieval System was an uncrewed space tug ordered by NASA in the late 1970s to re-boost Skylab using the Space Shuttle.

<span class="mw-page-title-main">Cygnus OA-4</span> Late 2015 cargo mission to the ISS

OA-4, previously known as Orbital-4, was the fourth successful flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its third flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. With the Antares launch vehicle undergoing a redesign following its failure during the Orb-3 launch, OA-4 was launched by an Atlas V launch vehicle. Following three launch delays due to inclement weather beginning on 3 December 2015, OA-4 was launched at 21:44:57 UTC on 6 December 2015. With a liftoff weight of 7,492 kg (16,517 lb), OA-4 became the heaviest payload ever launched on an Atlas V. The spacecraft rendezvoused with and was berthed to the ISS on 9 December 2015. It was released on 19 February 2016 after 72 days at the International Space Station. Deorbit occurred on 20 February 2016 at approximately 16:00 UTC.

<span class="mw-page-title-main">RADCAL</span> Radar calibration satellite

RADCAL was a radar calibration satellite launched and operated by the United States Air Force. It was active from June 1993 until it stopped communicating in May 2013.

<span class="mw-page-title-main">SpaceX CRS-28</span> 2023 American resupply spaceflight to the ISS

SpaceX CRS-28, also known as SpX-28, is a Commercial Resupply Service mission to the International Space Station (ISS) launched on 5 June 2023. The mission was contracted by NASA and flown by SpaceX using Cargo Dragon ship C208. It was the eighth flight for SpaceX under NASA's CRS Phase 2.

References