East Town Railway Workshops

Last updated

East Town Railway Workshops
Type Division of NZR
Industry Railways
Defunct17 October 1986 (1986-October-17)
FateDissolved due to rationalisation
SuccessorAramoho Railway Workshops
Headquarters
Wanganui
,
New Zealand
ServicesHeavy rail maintenance and vehicle construction
Number of employees
450+ (at time of closure)
Parent New Zealand Government Railways (NZGR)

The East Town Railway Workshops were a major manufacturing, maintenance and repair facility of the New Zealand Railways Department (NZR) located by the Marton - New Plymouth Line in the city of Wanganui in New Zealand's North Island. Output included not only rolling stock but also tools, equipment, huts, furniture and tarpaulins. It was a prodigious facility, and one of the larger employers in the city. Its name is sometimes formatted as Eastown or Easttown.

Contents

History

East Town was commissioned in August 1880, [1] and was the second North Island railway workshops established as part of Julius Vogel's Great Public Works policy. [2] A contract was let in 1879 by public tender to the Wanganui firm of Gibbes and Pinches for the construction of a Locomotive Erecting Shop, Machine Shop and Wood Mill. The following year, a second contract was let to Thomson and McLean to construct the Blacksmiths Shop and attached Boiler Shop. Work up to 1900 focused on the repair of rolling stock operated in the area between Taranaki and Hawke's Bay.

In 1900, the Engine Shed was relocated to the north-west corner of the yard. A single-road Paint Shop was erected, a wagon servicing pit was built, and the Erecting Shop was extended.

As a result of the Royal Commission of 1925 conducted by English railwaymen Sir Sam Fay and Sir Vincent Raven, the output of the workshops changed. [2] The capacity of the Locomotive Shop was dramatically reduced, and the Tarpaulin Shop expanded to handle the production requirements of the entire North Island. The Points and Crossings Shop previously located at the Addington Workshops was relocated to East Town.

East Town had been operating as two complete sets of workshops for both the Maintenance Branch and the Locomotive Branch, separated by only a road. In August 1931, it was decided to amalgamate the facilities into a single operation, a move that proved to be beneficial for the staff in the form of improved conditions and schedules. As a result of this amalgamation, it was necessary to move the Points and Crossings Shop to the Hutt Workshops, [3] and the workshops once again focused on the repair of locomotives, carriages and brake vans. [3] Later work done at East Town also included the manufacture and repair of tools, velocipedes, track gauges, railway huts, furniture for railway stations and offices, and heavy track machinery. Overhauls on shunting locomotives were also carried out at East Town from 1963, work that was previously done at the Hutt Workshops. [3]

Between 1947 and 1949, land was purchased at the west end of the yard and various workshop buildings were extended. A new Motor Shop was also erected. The first intake of apprentices, comprising nine carpenters and six fitters, started in January 1949 once a suitable building had been acquired. Further extensions were made to the Tarpaulin Shop in 1950, and a new Wagon Shop was also built.

East Town became particularly well known was the production of tarpaulins to cover goods wagons which were used at stations across the country. These were originally made of canvas and treated with linseed oil and vegetable black to weather-proof them. As the work was initially done by hand, those employed to make them were usually sailmakers by trade, with mechanisation not introduced until 1915. At the end of 1914, a new Tarpaulin Shop was commissioned, but it did not last long, being destroyed by fire in January 1915. In 1928, a dedicated tarpaulin factory was opened and, with the transfer of staff from the Newmarket Workshops, production increased to the rate of 50 tarpaulins per week. The Tarpaulin Manufacturing Shop was razed by fire on 5 August 1954, requiring an increase in the output of the Addington Workshops until the destroyed facility at East Town was replaced mid-1955. Just two months later, on 18 October, the Tarpaulin Depot Repair Shop was similarly destroyed. In 1973, NZR switched to using PVC tarpaulins which were cheaper to make and easier to repair. [3]

East Town closed on 17 October 1986 as the result of an effort by the New Zealand Railways Corporation to rationalise its workshop facilities around the country. [4] At the time it closed, it was the employer of over 450 local residents. At the same time the Aramoho Plant Zone workshops were retained and slightly expanded, [4] at a cost of $866,000, but they have also since been closed. [3]

Rolling stock

Some of the rolling stock work conducted at East Town included:

Related Research Articles

<span class="mw-page-title-main">Rail transport in New Zealand</span> Overview of rail transport in New Zealand

Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of 4,375.5 km (2,718.8 mi) of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail transport in New Zealand has a particular focus on bulk freight exports and imports, with 19 million net tonnes moved by rail annually, and 99.5% of New Zealand's exports and imports being transported through the country's seaports.

<span class="mw-page-title-main">NZR RM class (Clayton)</span>

The NZR RM class Clayton steam rail motor was a unique railcar that was operated by New Zealand Railways (NZR) for New Zealand's national rail network and one of only two steam railcars to operate in New Zealand - the other being 1925's RM class Sentinel-Cammell.

<span class="mw-page-title-main">Hillside Engineering</span>

Hillside Engineering Group is a trading division of the rail operator KiwiRail in Dunedin, New Zealand. Most of its work is related to KiwiRail, but it also does work for the marine industry in Dunedin. On 19 April 2012 KiwiRail announced it was putting Hillside on the market for sale. In November 2012 KiwiRail announced it had sold part of the business to Australian firm Bradken, and the rest would be closed. The workshops continued to be used for some maintenance work by Kiwirail with a skeleton staff. In October 2019, the New Zealand Government announced that it would be investing NZ$20 million into revitalising Hillside Engineering as a major mechanical hub and engineering facility to service Kiwi Rail's locomotives and rollingstock.

<span class="mw-page-title-main">NZR C class (1930)</span>

The NZR C class consisted of twenty-four steam locomotives built to perform shunting duties on New Zealand's national rail network. It is sometimes known as the big C class to differentiate it from the C class of 1873.

<span class="mw-page-title-main">New Zealand Railways Department</span> Government agency (1880–1982)

The New Zealand Railways Department, NZR or NZGR and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system. The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation. Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.

<span class="mw-page-title-main">Glenbrook Vintage Railway</span> Heritage railway operating in New Zealand

The Glenbrook Vintage Railway (GVR) is a heritage steam railway in Glenbrook, New Zealand.

NZR J<sup>A</sup> class

The NZR JA class were a type of 4-8-2 steam locomotive used on the New Zealand railway network. The class was built in two batches, the first batch was built at Dunedin's Hillside Workshops between 1946 and 1956 and the second batch by the North British Locomotive Works in 1951. To distinguish between the batches, locomotives are identified by their maker.

<span class="mw-page-title-main">New Zealand EW class locomotive</span>

The New Zealand EW class locomotive was a type of electric locomotive used in Wellington, New Zealand. The classification "EW" was due to their being electric locomotives allocated to Wellington. For two decades until the advent of the DX class they were the most powerful locomotives in New Zealand.

<span class="mw-page-title-main">NZR K class (1932)</span>

The NZR K class of 1932 was a class of mixed traffic 4-8-4 steam locomotives built by the New Zealand Railways Department (NZR) that operated on New Zealand's railway network. The locomotives were developed following the failure of the G class Garratt locomotives. The class should not be confused with the much earlier K class of 1877-78, the first American-built engines to arrive in New Zealand.

NZR K<sup>A</sup> class

The NZR KA class of 1939 was a class of mixed traffic 4-8-4 steam locomotives that operated on New Zealand's railway network. They were built after the success of the K class to meet the increasing traffic demands of the New Zealand Railways Department. The locomotives first appeared with distinctive streamlining, mainly to hide their ACFI feedwater heater systems.

<span class="mw-page-title-main">Addington Railway Workshops</span>

The Addington Railway Workshops was a major railway workshops established in the Christchurch suburb of Addington in 1877 by the Public Works Department, and transferred in 1880 to the newly-formed New Zealand Railways Department (NZR). The workshops closed in 1990.

<span class="mw-page-title-main">New Zealand DSC class locomotive</span> Heavy shunting locomotive

The New Zealand DSC class locomotive is a heavy shunting locomotive used throughout New Zealand. The class was built in seven batches, the first 18 locomotives being built by British Thomson-Houston of the United Kingdom, with the remainder being built by New Zealand Railways (NZR).

<span class="mw-page-title-main">NZR RM class (Sentinel-Cammell)</span>

The NZR RM class Sentinel-Cammell was a steam-powered railcar operated by the New Zealand Railways Department (NZR). It was the only one of its type to operate in New Zealand, and one of only two steam railcars trialled in the country; the other was the Clayton steam railcar.

<span class="mw-page-title-main">NZR D class (1874)</span>

NZR D class steam tank locomotives operated on New Zealand's national railway network. The first entered service in 1874 all had been withdrawn by the end of 1927, which allowed the D classification to be used again in 1929.

<span class="mw-page-title-main">New Zealand EA class locomotive</span>

The New Zealand EA class of electric locomotives were used on the New Zealand rail network between 1968 and 1997 on the Otira – Arthur's Pass section of the Midland line in the South Island, through the Otira Tunnel. Following reconditioning, three were used by KiwiRail's Tranz Metro in Wellington from 2008 to 2011 to top and tail Metlink suburban passenger trains as an interim measure before new rolling stock arrived. Four of the five locomotives were scrapped in 2013 with one being set aside for preservation.

The Rimutaka Incline Railway Heritage Trust is a non-profit, charitable trust in New Zealand that was established in 2003 with the objective of reinstating an operating heritage railway over the Remutaka Ranges using the original route of the Wairarapa Line between Maymorn and Featherston, including the world-famous Rimutaka Incline.

<span class="mw-page-title-main">Newmarket Workshops</span>

The Newmarket Workshops in Auckland were a major New Zealand Railways Department facility, one of 13 workshops nationwide. It was one of two main railway workshops of Auckland, used mainly for maintenance; the older facility at Newmarket was replaced in 1929 by Otahuhu Workshops.

<span class="mw-page-title-main">Otahuhu Workshops</span>

The Petone Workshops were a government-owned railways maintenance and repair facility located in Petone, in Lower Hutt in the Wellington region of New Zealand's North Island. It took over construction and maintenance of rolling stock in the Wellington region from the Pipitea Point facility, starting in 1876, and became the only such facility in the region from 1878 until the opening of the replacement Hutt Workshops facility in 1929.

References

Citations

Bibliography

  • Bromby, Robin (2003). Rails That Built A Nation: An Encyclopedia of New Zealand Railways. Wellington: Grantham House Publishing. ISBN   1-86934-080-9.
  • Leitch, David; Stott, Bob (1988). New Zealand Railways: The First 125 Years. Auckland: Heinemann Reed. p. 176. ISBN   0-7900-0000-8.
  • Publicity and Advertising Branch (August 1980), History of East Town Railway Workshops, New Zealand Railways Department

39°54′42.02″S175°3′46.26″E / 39.9116722°S 175.0628500°E / -39.9116722; 175.0628500