The East and West Yorkshire Union Railway was promoted in 1883 to connect the Hull and Barnsley Railway at Drax with Leeds. The company was unable to raise the money it needed to build the line, and it substantially reduced its scope to connecting collieries around Rothwell with the existing main line network nearby. This was successful, with trains running from 1890, but the company decided it would find a way to connect to Leeds and operate a much truncated passenger service, from Rothwell. It sponsored the South Leeds Junction Railway to make a connection from Rothwell to the Midland Railway at Stourton; the SLJR was soon re-absorbed by the E&WYUR. The passenger service started on 4 January 1904 but it was a disastrous failure, and it was soon withdrawn from 1 October 1904.

Contents

The E&WYUR continued as a successful mineral railway, being taken into the London and North Eastern Railway at the grouping of the railways in 1923. The network closed in 1966 as the collieries had ceased operation.

Background

The E&WYUR network in 1894 E&WYUR1894.png
The E&WYUR network in 1894

In the last quarter of the nineteenth century there was a considerable upsurge in the coal industry in Yorkshire. At the same time there was dissatisfaction with the facilities provided by the established railway companies, and indeed with their charges. From the railways' point of view, huge capital investment in rolling stock and in infrastructure was being called for at a time when money was limited. [1]

The Hull and Barnsley Railway (H&BR) was authorised by Act of 26 August 1880 with the principal object of providing a direct link for mineral traffic from West Yorkshire coalfields to the Port of Hull; the project was partly motivated by resentment at the monopoly of the North Eastern Railway in serving Hull. The Parliamentary Bill for the H&BR had asked for wide-ranging running powers over existing railways to Sheffield, Leeds, Bradford, Huddersfield, Halifax, Manchester and Liverpool, but these had all been struck out when the Act received the Royal Assent. The line was a considerable engineering project at this time, and as work progressed, it became obvious that the company was unable to raise the money it needed, and in fact it never completed its network. [1] [2] [3]

E&WYUR promoted

The H&BR thought it essential to get access to Leeds for passenger traffic from Hull, and it encouraged promotion of a line from Drax, on its own main line, to Ardsley on the Great Northern Railway. The line was to cross the Midland Railway at Woodlesford and make a connection there, and also connect a colliery network at Rothwell, four miles south-east of Leeds. At Ardsley, it was hoped, running powers over the Great Northern Railway would be granted to Leeds and Bradford. The Woodlesford connection would allow for an alternative route to Leeds. Rothwell was the focus of a group of collieries owned by Henry Charlesworth of J & J Charlesworth & Co Limited; high quality stone was quarried locally as well. The Charlesworth group of collieries had connections to railways, but there was considerable attraction for them in a new direct railway to Hull docks. [4] [5]

The result was the Parliamentary authorisation on 2 August 1883 of the East and West Yorkshire Union Railway. The hoped-for running powers over the Midland Railway and the Great Northern Railway were refused. The main line from Drax was an ambitious project of about 30 miles of railway across difficult terrain. [1] [6] [4] The E&WYUR soon found that raising the considerable capital sum for its main line was impossible, and in 1886 it got an abandonment Act. The intended line to Drax was to be abandoned, but short branch lines to Lofthouse (near Ardsley) on the GNR and Woodlesford on the Midland Railway were added (or modified), so that the proposed network was about nine miles in extent including siding complexes. Running powers from Lofthouse to Leeds Central over the GNR were requested—passenger operation was still contemplated on the abbreviated system—but these were refused. [4] [1] [6] [5]

Opening of a limited network

By November 1890 the line was nearly ready at the Ardsley end, so that some coal could come from the Rothwell collieries over the E&WYUR onto the GNR. However, there was a dispute with the GNR over the junction, and it was only resolved when the GNR were given running powers on the E&WYUR. [1] [4] On 19 May 1891 the line was fully open as far as Rothwell. Robin Hood Colliery was a collection point for other collieries, and GNR engines worked to and from that point; the colliery engines moved the wagons beyond that point. Considerable volumes of coal were now brought to the GNR for onward transit. [4] [1] [5]

Continuously short of money for construction purposes, the E&WYUR approached the GNR in February 1892, asking it to take it over. The GNR board was willing to consider this, but was cautious about the financial commitment it would be making, and referred the matter to a sub-committee. [4] The issue became complicated: at this time Hunslet had become a major industrial and commercial growth area, and business interests put forward a new line to the north of the E&WYUR, from Beeston to Hunslet; this group approached the GNR for support. At the same time the E&WYUR proposed an extension of its own line to Hunslet, which was to be called the South Leeds Junction Railway. The GNR considered its position on these conflicting proposals, and decided that the line from Beeston would be better, being more direct and involving less property demolition. That line became the Hunslet Railway, opened in 1899 by the Great Northern Railway. [7] [4] In May 1892, takeover negotiations between the GNR and the E&WYUR broke down, as the E&WYUR wanted 4% on its share capital, a demand the GNR would not meet. [8] The Beeston to Hunslet scheme proceeded separately, and had no further connection with the E&WYUR. [9] [4]

Situation in 1900

An article in Railway Magazine in August 1900 describes some contemporary features:

The situation of the railway made it a rather costly line to construct, the capital expenditure being up to the present time about £250,000... The Capital expenditure includes the many yards and sidings, the extent of which nearly equals the mileage of the railway. The principal traffic... is coal and stone. The traffic is derived from seven collieries and a number of quarries working the well known Robin Hood stone, which is sent all over England for window sills and stone work of that description... The railway is in a very flourishing condition financially, having paid 1 per cent dividend on its ordinary stock for several years past... [10]

South Leeds Junction Railway

East and West Yorkshire Union Railways (South Leeds Junction Railway Transfer) Act 1896
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act for vesting the undertaking of the South Leeds Junction Railway Company in the East and West Yorkshire Union Railways Company and for other purposes.
Citation 59 & 60 Vict. c. xlii
Dates
Royal assent 2 July 1896
Text of statute as originally enacted

The E&WYUR proposal for the South Leeds Junction Railway was authorised on 24 August 1893, but in a much-modified form: it was to be a two-mile line from Rothwell to sidings at Stourton, two miles west of Woodlesford, alongside the Midland Railway line. This connected in more collieries, and it opened on 6 April 1895. Considerable volumes of coal came to the GNR off the line. The South Leeds Junction Railway was worked by the E&WYUR, and it was acquired by the E&WYUR company by an the East and West Yorkshire Union Railways (South Leeds Junction Railway Transfer) Act 1896 (59 & 60 Vict. c. xlii) of 2 July 1896. [6] [11] [12] [9] [5]

Branches

A further branch was authorised on 14 December 1897 from Robin Hood to Royds Green Lower; it was authorised under the Light Railways Act 1896 (59 & 60 Vict. c. 48), only the second line to be treated in this way. A third branch was the Thorpe Branch, which was built in 1899. The final result was a railway that had numerous small branches serving collieries in a small area. [11] A short extension was opened on 1 November 1903 from Stourton to Stourton Junction on the Midland Railway, providing a running line connection. [11] [12]

Passenger trains

The E&WYUR network in 1904 E&WYUR1904.png
The E&WYUR network in 1904

Workmen's services were operated on a branch from Robin Hood to Royds Green Lower, sanctioned by the light railway order, and opened by 1898. [4]

A light railway order made on 7 June 1901 [12] permitted the company to operate its main line as a light railway and build a new branch alongside the Pontefract-Leeds road as far as the tramway terminus at Thwaite Gate (at this stage not making a junction with the Midland Railway). The intention was to operate a passenger service in connection with the trams, but this scheme was abandoned when work started on a conventional street tramway linking Wakefield and Leeds via Stourton, with a branch to Robin Hood. Undaunted, the E&WYUR decided to compete firectly with the trams and on 4 January 1904 introduced a passenger service between Robin Hood and Leeds Wellington station. It was a disastrous failure, losing £200 per month; Sunday services were withdrawn in August 1904, and the entire service was withdrawn from 1 October of the same year, only six weeks after the opening of the rival tram route. [4] [6] [12]

Suggitt remarks:

The provision... of a separate passenger service on the E&WYUR made little sense. Horse drawn wagonettes already ran to Leeds and a scheme for electric trams to Wakefield had been approved in 1902. [To enable passenger operation,] a junction with the Midland main line at Stourton had to be built, the SLJR section of track doubled, modern signalling installed, and platforms built at the three stations of Robin Hood, Rothwell and Stourton. [5]

Operating methods

The E&WYUR had an unusual operating system: no block working was used, and only the Royds Green Lower Branch used a staff and ticket method. All train movements had to be made on a siding basis, driving at sight. Proper signalling had to be provided for the passenger service. [5] The 1900 Railway Magazine article includes the observation that "Although the railway is worked as a single line, a large portion of it is already doubled". [10]

The residual E&WUYR

The E&WYUR had been constructed as a domestic Charlesworth network, and only limited attempts had been made to document land ownership. In a number of cases E&WYUR lines were built on Charlesworth property; the company had purchased land from Charlesworths in 1899, but Charlesworths retained certain reservations. For some time this did not matter, but the LNER later found that it was a problematic issue.[ citation needed ]

The E&WYUR remained independent until the Grouping of the railways in 1923, when it was taken over by the London and North Eastern Railway. [6]

After 1923

The E&WYUR lines were all closed by 3 October 1966, the line east of Rothwell had been dormant since February 1962. [12]

Station list

Current Condition

A video series has been made in 2020 of walks along the old tracks describing the history and current status of the lines, stations and pits it served.

Related Research Articles

<span class="mw-page-title-main">Rothwell, West Yorkshire</span> Market Town in West Yorkshire, England

Rothwell is a town in the south-east of the City of Leeds metropolitan borough in West Yorkshire, England. It is situated between Leeds and Wakefield.

<span class="mw-page-title-main">Great Northern Railway (Great Britain)</span> British railway company, 1846 to 1922

The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.

<span class="mw-page-title-main">Hallam Line</span> Railway line in Yorkshire, England

The Hallam Line is a railway connecting Leeds and Sheffield via Castleford in the West Yorkshire Metro area of northern England. It is a slower route from Leeds to Sheffield than the Wakefield line. Services on this line are operated by Northern Trains. Services from Leeds to Nottingham also use the line.

<span class="mw-page-title-main">Wakefield line</span> Railway from Leeds to Sheffield

The Wakefield line is a railway line and service in the West Yorkshire Metro and South Yorkshire Passenger Transport Executive areas of northern England. The Wakefield line is coloured yellow on maps and publications by West Yorkshire Metro. The line was electrified in 1989, between Leeds & Wakefield Westgate, as part of the programme to electrify the East Coast Main Line.

<span class="mw-page-title-main">Pontefract line</span> Leeds-Goole railway

The Pontefract line is one of the rail services in the West Yorkshire Metro area of northern England. The service is operated by Northern, and links Wakefield and Leeds with Goole via Pontefract. The Metro timetable for the line also includes services operated as the Dearne Valley line between York and Sheffield via Pontefract.

<span class="mw-page-title-main">Woodlesford railway station</span> Railway station in West Yorkshire, England

Woodlesford railway station serves a suburban village of Woodlesford and a town of Rothwell in West Yorkshire, England. It lies on the Hallam Line and the Pontefract Line, 6 miles (9.7 km) south of Leeds.

The Leeds and Bradford Railway Company (L&BR) opened a railway line between the towns on 1 July 1846. It extended its line from Shipley through Keighley to Skipton and Colne, in 1847 and 1848.

The Derbyshire and Staffordshire extension of the Great Northern Railway was an English railway network built by the GNR to get access to coal resources in the area to the north and west of Nottingham. The Midland Railway had obstructed the GNR in its attempts to secure a share of the lucrative business of transporting coal from the area, and in frustration the GNR built the line. The line was forked: it reached Pinxton in 1875 and a junction with the North Staffordshire Railway at Egginton, approaching Burton on Trent in 1878. The line cut through Derby, resulting in considerable demolition of housing there.

<span class="mw-page-title-main">Woodlesford</span> Village in West Yorkshire, England

Woodlesford is a suburban village in the City of Leeds, West Yorkshire, England, 6 miles (10 km) south-east of Leeds city centre. Formerly part of the Rothwell Urban District, it is now within the Rothwell ward of Leeds City Council. The village sits on the banks of the Aire and Calder Navigation and river system.

<span class="mw-page-title-main">West Riding and Grimsby Railway</span> United Kingdom legislation

The West Riding and Grimsby Railway was a railway company that promoted a line between Wakefield and Doncaster, in Yorkshire, England. There was also a branch line connection from Adwick le Street to Stainforth, which gave access towards Grimsby. The company was promoted independently, but it was sponsored by the Manchester, Sheffield and Lincolnshire Railway and the Great Northern Railway, and became jointly owned by them.

<span class="mw-page-title-main">Robin Hood, West Yorkshire</span> Village in West Yorkshire, England

Robin Hood is a village in the City of Leeds in West Yorkshire, England. It is close to the City of Wakefield boundary and is situated between Leeds and Wakefield as well as being close to Rothwell and Lofthouse.

<span class="mw-page-title-main">Teversall Manor railway station</span> Former railway station in Nottinghamshire, England

Teversall Manor is a former railway station in Teversal, Nottinghamshire, England. It was located on the border with Derbyshire, west of Mansfield. The station was a stop on the Midland Railway's line from Tibshelf and Whiteborough to Pleasley West, known as the Teversall & Pleasley Branch. The line's primary purpose was to transport coal.

The Pudsey loop was a railway line in the former West Riding of Yorkshire, England, which served the town of Pudsey and later offered a second connection between Bramley in the east and Laisterdyke and Dudley Hill in the west, in addition to the existing line between Leeds and Bradford Exchange station.

<span class="mw-page-title-main">Leeds, Bradford and Halifax Junction Railway</span> Railway line in Yorkshire, England

The Leeds, Bradford and Halifax Junction Railway (LB&HJR) was an English railway company. It built a line between Bradford and Leeds, and had running powers over the Lancashire and Yorkshire Railway to Halifax. It opened its main line in 1854 and later built a number of branch lines.

<span class="mw-page-title-main">Methley Joint Railway</span>

The Methley Joint Railway was a short English railway line constructed by the Bradford, Wakefield and Leeds Railway company, connecting its Leeds direction line with other companies' eastward routes to York, the north-east, and Goole. The line connected collieries along its route. The BW&LR changed its name to the West Yorkshire Railway at the same time. The line was double track, just over five miles in length, between junctions at Lofthouse and Methley.

The Beeston Junction–Hunslet Goods railway was a goods railway line in Leeds, West Yorkshire, England, promoted as the Hunslet Railway. It connected the Great Northern Railway main line with a new Hunslet goods yard, on the east side of Leeds. It opened in 1899, and was a successful expansion of goods facilities for the GNR.

The Lincolnshire lines of the Great Northern Railway are the railways, past and present, in the English county built or operated by the Great Northern Railway.

<span class="mw-page-title-main">Bradford, Wakefield and Leeds Railway</span> Railway Company

The Bradford, Wakefield and Leeds Railway was an independent railway company that built a line between Wakefield and a junction close to Leeds, in Yorkshire, England. It opened its main line in 1857, and was worked by the Great Northern Railway. The line shortened the GNR route to Leeds.

The Great Northern Railway developed an extensive network over time, having started in 1846 with the intention of connecting London and York, as well as other major Yorkshire towns. The Great Northern Railway in Yorkshire was a major part of that, although the GNR did not succeed in reaching York as it originally intended. By acquiring running powers it reached Leeds, Bradford and Halifax over other companies' lines, as well as Barnsley Sheffield and Grimsby, and then York too. After acquiring local companies it developed a network, chiefly in West Yorkshire. Later it built lines north and west of Bradford into hilly terrain, and these were very expensive to build, and never repaid the initial cost.

The Leen Valley lines of the Great Northern Railway were railway branch lines built to access the collieries in the Nottinghamshire coalfield in England. The Midland Railway had long been dominant in the area, but there was resentment against its monopolistic policies from coalowners, who encouraged the Great Northern Railway to build a line. The Leen Valley Line was opened in 1881; it ran as far as Annesley colliery. A passenger service was run the following year, and very considerable volumes of coal were hauled.

References

  1. 1 2 3 4 5 6 Wrottesley, volume II, page 162
  2. Joy, page 226
  3. Grant, page 273
  4. 1 2 3 4 5 6 7 8 9 10 Joy, pages 57 to 59
  5. 1 2 3 4 5 6 Suggitt, pages 26, 27 and 30
  6. 1 2 3 4 5 Grant, pages 165 and 166
  7. Grant, page 275
  8. Wrottesley volume III, page 69
  9. 1 2 Wrottesley, volume III, page 70
  10. 1 2 A Modern Mineral Railway: The East and West Yorkshire Union Railway, in the Railway Magazine, August 1900
  11. 1 2 3 Grant, page 523
  12. 1 2 3 4 5 Joy, page 244

Sources