Fall River Secondary

Last updated
Fall River Secondary
Overview
StatusOperational
Owner Massachusetts Bay Transportation Authority
Locale Bristol County, Massachusetts
Termini
Stations3 (future)
Service
Type Freight rail, future commuter rail
System Massachusetts Coastal Railroad [1]
MBTA Commuter Rail (future)
Services South Coast Rail (future)
History
Planned opening2023 (2023)
Technical
Line length14.2 miles (22.9 km) [2]
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Operating speed10 miles per hour (16 km/h) (freight) [2]
Route map

Contents

BSicon CONTg.svg
BSicon eHST.svg
Myricks (closed)
BSicon STRl.svg
BSicon ABZq+lr.svg
BSicon CONTfq.svg
0.0 mi
0 km
BSicon eHST.svg
Assonet (closed)
BSicon eHST.svg
Crystal Spring (closed)
BSicon eHSTACC.svg
Freetown
(future)
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
7.5 mi
12.1 km
Somerset Junction (closed)
BSicon eYRD.svg
BSicon eACC.svg
Fall River
(closed/future)
BSicon YRDeq.svg
BSicon ABZgr.svg
11.0 mi
17.7 km
Wharf Yard
BSicon exlHSTACC.svg
BSicon ENDExe.svg
12.0 mi
19.3 km
Battleship Cove
(future) | Ferry Street (closed)
BSicon exCONTf.svg
14.2 mi
22.9 km
Newport Line

The Fall River Subdivision is a freight railroad line in the U.S. state of Massachusetts, owned by the Massachusetts Bay Transportation Authority, with freight operations handled by the Massachusetts Coastal Railroad; [3] it was formerly owned and operated by CSX Transportation. The line runs from the New Bedford Subdivision at Myricks (in Berkley) south to Fall River [4] along a former New York, New Haven and Hartford Railroad line. At its south end, at the Rhode Island state line in Fall River, it becomes a line of the Providence and Worcester Railroad.

History

The Fall River Branch Railroad completed the line from Myricks south to Fall River in 1845. [5] The Old Colony and Newport Railway extended the line to Newport, Rhode Island, in 1864. [6] The line later became part of the NYNH&H until 1958. Penn Central then took over in 1968, followed by Conrail, who took over in 1976. The Fall River Subdivision was assigned to CSX in 1999 after the breakup of Conrail.

On October 2, 2008, the state government announced an agreement with CSX Transportation for the purchase and upgrade of several of CSX's freight lines in the state. CSX agreed to sell the Fall River Secondary and New Bedford Secondary for use by the South Coast Rail project, as well as the Grand Junction Branch, the Framingham-to-Worcester section of the Worcester Line, and the South Boston Running Track. Other parts of the agreement included plans for double-stack freights west of Worcester and the abandonment of Beacon Park Yard. [7] The agreement was signed on September 23, 2009. [8] On June 11, 2010, the state and CSX completed the first phase of the agreement, including the transfer of the South Coast Rail lines to MassDOT; the Massachusetts Coastal Railroad assumed freight rights on the two lines. [1] The two lines were sold for $21.5 million. [9]

The line is currently used primarily to transport chemicals to Borden & Remington in Fall River. [10]

See also

Related Research Articles

<span class="mw-page-title-main">New York, New Haven and Hartford Railroad</span> Railroad in the United States from 1872 to 1968

The New York, New Haven and Hartford Railroad, commonly known as The Consolidated, or simply as the New Haven, was a railroad that operated principally in the New England region of the United States from 1872 to December 31, 1968. Founded by the merger of the New York and New Haven and Hartford and New Haven railroads, the company had near-total dominance of railroad traffic in Southern New England for the first half of the 20th century.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Providence and Worcester Railroad</span> Regional railroad in the Northeastern United States

The Providence and Worcester Railroad is a Class II railroad operating 612 miles (985 km) of tracks in Rhode Island, Massachusetts, and Connecticut, as well as New York via trackage rights. The company was founded in 1844 to build a railroad between Providence, Rhode Island, and Worcester, Massachusetts, and ran its first trains in 1847. A successful railroad, the P&W subsequently expanded with a branch to East Providence, Rhode Island, and for a time leased two small Massachusetts railroads. Originally a single track, its busy mainline was double-tracked after a fatal 1853 collision in Valley Falls, Rhode Island.

<span class="mw-page-title-main">Old Colony Railroad</span> Former railroad system in Massachusetts and Rhode Island

The Old Colony Railroad (OC) was a major railroad system, mainly covering southeastern Massachusetts and parts of Rhode Island, which operated from 1845 to 1893. Old Colony trains ran from Boston to points such as Plymouth, Fall River, New Bedford, Newport, Providence, Fitchburg, Lowell and Cape Cod. For many years the Old Colony Railroad Company also operated steamboat and ferry lines, including those of the Fall River Line with express train service from Boston to its wharf in Fall River where passengers boarded luxury liners to New York City. The company also briefly operated a railroad line on Martha's Vineyard, as well as the freight-only Union Freight Railroad in Boston. The OC was named after the "Old Colony", the nickname for the Plymouth Colony.

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Framingham/Worcester Line</span> MBTA commuter railroad line

The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.

The New Bedford Subdivision is a freight railroad line in the U.S. state of Massachusetts owned by the Massachusetts Bay Transit Authority, with freight operations handled by the Massachusetts Coastal Railroad. The line runs from the end of the CSX Middleboro Subdivision near Weir Village south to New Bedford along a former New York, New Haven and Hartford Railroad line. It joins the Fall River Subdivision at Myricks.

<span class="mw-page-title-main">Middleboro Secondary</span>

The Middleboro Secondary is a railroad line owned by MassDOT in the U.S. state of Massachusetts. The line runs from Attleboro to Middleborough via Taunton.

<span class="mw-page-title-main">Framingham Secondary</span>

The Framingham Secondary is a railroad line in the U.S. state of Massachusetts. The line runs from Mansfield northwest to Framingham along a former New York, New Haven and Hartford Railroad line. Its south end is at Amtrak's Northeast Corridor, over which CSX has trackage rights to reach the Middleboro Subdivision at Attleboro and the Boston Subdivision in Boston. Its north end is at the Framingham/Worcester Line; the Fitchburg Subdivision continues northwest from Framingham.

The Boston Subdivision is a railroad line in the U.S. state of Massachusetts. The line runs from Back Bay Station in Boston west to Wilbraham, just east of Springfield. along a former New York Central Railroad line. The line connects with the Northeast Corridor its east end and continues as the Berkshire Subdivision at its west end. Along the way, the line junctions with the Framingham Subdivision and Fitchburg Subdivision at Framingham.

<span class="mw-page-title-main">South Coast Rail</span>

South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line has been planned to restore passenger rail service between Boston and the cities of Taunton, Fall River, and New Bedford, via the towns of Berkley, and Freetown, on the south coast of Massachusetts. It would restore passenger service to some of the southern lines of the former Old Colony Railroad and the New York, New Haven and Hartford Railroad.

<span class="mw-page-title-main">East Taunton station</span> Future railway station in Taunton, Massachusetts, US

East Taunton station is an under-construction MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street. It is planned to open in late 2023 as part of the first phase of the South Coast Rail project.

<span class="mw-page-title-main">Freetown station</span> Future railway station in Freetown, Massachusetts, US

Freetown station is a future MBTA Commuter Rail station located in the Assonet village of Freetown, Massachusetts. It is planned to open in 2023 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the west side of the Fall River Secondary, along with a park and ride lot.

<span class="mw-page-title-main">Fall River station</span>

Fall River station is an under-construction MBTA Commuter Rail station in Fall River, Massachusetts. The station is being constructed as part of the South Coast Rail project and is expected to open in late 2023.

<span class="mw-page-title-main">Battleship Cove station</span> Planned railway station in Fall River, Massachusetts, USA

Battleship Cove is a proposed MBTA Commuter Rail station in Fall River, Massachusetts. It is planned to be the southern terminus of the Fall River branch of the South Coast Rail project, and will open in 2030 as part of the project's Phase II. The station will have no parking—it is intended for tourists visiting Battleship Cove and the Fall River waterfront, with Fall River station to the north serving commuters—and will be open seasonally. Previous passenger service to Fall River included stations at Fall River Wharf (1847–1937) and Ferry Street (1864–1958). The Wharf station was the terminus of the Fall River Line steamship service.

<span class="mw-page-title-main">Church Street station (MBTA)</span> Under-construction railway station in New Bedford, Massachusetts, US

Church Street station is an under-construction MBTA Commuter Rail station located in northern New Bedford, Massachusetts, United States. It is planned to open in 2023 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the east side of the New Bedford Subdivision, along with a park and ride lot.

The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.

<span class="mw-page-title-main">Track 61 (Boston)</span>

Track 61 is an industrial rail terminal track in South Boston, Massachusetts, also known as the Boston Terminal Running Track. Track 61 is the last remnant of the vast rail yards that once covered much of the South Boston waterfront. Track 61 legally begins at Summer Street, while the line from Bay Junction to Summer Street is the Boston Terminal Running Track and Terminal Yard. However, the names are frequently used interchangeably.

References

  1. 1 2 "The Massachusetts Rail Program" (PDF). Massachusetts Department of Transportation. June 2010. p. 7.
  2. 1 2 "Albany Division Timetable No. 4" (PDF). CSX Transportation. November 1, 2004.
  3. "Cape Rail cuts track deal for freight". capecodtimes.com. Cape Cod Times. 25 November 2009. Retrieved 26 February 2015.
  4. CSX Timetables: Fall River Subdivision
  5. "PRR Chronology, 1845" (PDF). (40.4  KiB), March 2005 Edition
  6. Hon. Edward Appleton, Railway Commissioner, History of the Railways of Massachusetts Archived August 3, 2009, at the Wayback Machine , 1871
  7. "PATRICK ADMINISTRATION ANNOUNCES AGREEMENT TO PURCHASE RAIL LINES" (Press release). Massachusetts Bay Transportation Authority. October 2, 2008.
  8. "PATRICK-MURRAY ADMINISTRATION FINALIZES AGREEMENT WITH CSX TRANSPORTATION" (Press release). Massachusetts Bay Transportation Authority. September 23, 2009.
  9. Richmond, Will (June 16, 2010). "State buys 38 miles of track for South Coast Rail". Herald News article.
  10. Boremco