French aircraft carrier PA2

Last updated
PA2
PA2-render-002.jpg
A 2006 design of the PA2
Class overview
NamePA2 class
OperatorsCivil and Naval Ensign of France.svg  French Navy
Preceded by Charles de Gaulle
Succeeded by PANG
Planned1
Cancelled1
History
Civil and Naval Ensign of France.svgFrance
FateCancelled in 2013
General characteristics
Type Aircraft carrier
Displacement75,000 tonnes [1]
Length283 m (928 ft) overall
Beam73 m (240 ft) overall
Draft11.5 m (38 ft)
Propulsion
  • 2 × RR MT-30 gas turbines
  • 4 × diesel-electric engines
  • two shafts
Speed26 knots (48 km/h)
Range10,000 nautical miles (19,000 km) at 15 knots (28 km/h)
Complement
  • Ship's Company: 1,000
  • Air Wing: 650
Sensors and
processing systems
Héracles air search and target acquisition radar
Armament
Aircraft carried

PA2 (French: Porte-Avions 2, "Aircraft Carrier 2") was a planned aircraft carrier under development by Thales Naval France and DCNS for the French Navy. The design was based on the Queen Elizabeth-class aircraft carriers developed for the Royal Navy. The project was cancelled in the 2013 French White Paper on Defence and National Security. [2] [3]

Contents

Background

The previous French carriers, Clemenceau and Foch, were completed in 1961 and 1963 respectively. The requirement for a replacement was identified in the mid-1970s, which became the 40,600 tonne nuclear-powered Charles de Gaulle, laid down in April 1989 at the DCNS Brest naval shipyard. This carrier was launched in May 1994, but not officially commissioned until 2001 due to a large number of problems, which included the need to lengthen the flight deck after aircraft trials, a broken propeller and vibration and noise problems. The French Navy was understood to be unwilling to proceed with another carrier of the same design and by 2003 the possibility of sharing the Royal Navy design emerged to fulfill the French requirement for a second carrier.

The requirement for the carriers was confirmed by Jacques Chirac in 2004 for the centennial of the Entente Cordiale and on 26 January 2006 the defence ministers of France and Britain reached an agreement regarding cooperation on the design of their future carriers. France agreed to pay the UK for access to the design due to the investment made to date. These payments were £30 million in January 2006, £25 million in July 2006 and a further £45 million if France decides to proceed with the project. [4]

The FY2008 French defence budget included the necessary funding, €3 billion, for the ship. [5] However, in April 2008 French Defence Minister Herve Morin cast doubt over plans for a second aircraft carrier, citing a cash crunch and the fact that rising oil prices put the question of the propulsion back on the table, and said a decision would be taken soon. [6] Further doubts were cast on the project on 21 June 2008 when then French President Nicolas Sarkozy decided to suspend co-operation with Britain on the aircraft carrier. Sarkozy stated that a final decision on France building a second carrier would be taken by 2012.

British plans for two aircraft carriers went ahead as planned despite the French withdrawal, as the original project had in any case been a British one and not dependent on French involvement. [7]

On 3 February 2009, the French government ordered studies about another architecture and design casting even more doubt on the likelihood of the French Navy using the current British design. The option of nuclear propulsion was also put back on the table, and if selected would have required a completely different approach. An option similar to the Azimuth thruster used on the Mistral-class ships was also considered. [8]

Design considerations

The French carrier would have been built by an alliance of Thales and DCNS using the proposed design of a 283 metres (928 ft) long, 75,000 tonne variant of the Queen Elizabeth class. While the UK had chosen to continue to use STOVL configuration for its new carriers, the design could also be reconfigured to a CATOBAR configuration for French requirements. The French variant would have most likely operated the Dassault Rafale, the E-2C Hawkeye and the NH-90 fixed-wing and rotary aircraft. Being a CATOBAR design, PA2 would have been equipped with the same 90 metres (300 ft) long C13-2 steam catapults as those installed on the Nimitz-class aircraft carriers of the United States Navy.

The crew of PA2 was expected to be about 1,650, a significant decrease from the 1,950 crew of Charles de Gaulle, indicating the high level of automation integrated into the ship's systems.

The ship would have had two islands: one devoted to ship navigation, and the other to air operations. Allowing optimal placement of bridges for both tasks; navigation calls for a bridge placed forward (as on Charles De Gaulle), while air operations are made easier with a bridge placed aft (as seen on the US Nimitz class).

The original design had to meet the Royal Navy's requirements, so nuclear propulsion was not an option: the British government rejected nuclear propulsion as too costly. Before cancellation the carrier's propulsion system was expected to be an integrated full electric propulsion (IFEP) based on two Rolls-Royce MT30 gas turbines. The carrier would have had a range of approximately 10,000 nautical miles (19,000 km).

Construction considerations

The hull was likely to be built by Chantiers de l'Atlantique at Saint Nazaire, and fitted out by DCN at Brest. The ship was likely to be based at Toulon naval base whose two dry docks can accommodate even the larger Nimitz-class aircraft carriers.

Name considerations

At the time, it had been proposed to name the aircraft carrier Richelieu, after Cardinal Richelieu, which was the name originally intended for Charles de Gaulle. [9]

See also

Related Research Articles

<span class="mw-page-title-main">Aircraft carrier</span> Warship that serves as a seagoing airbase

An aircraft carrier is a warship that serves as a seagoing airbase, equipped with a full-length flight deck and facilities for carrying, arming, deploying, and recovering aircraft. Typically it is the capital ship of a fleet, as it allows a naval force to project air power worldwide without depending on local bases for staging aircraft operations. Carriers have evolved since their inception in the early twentieth century from wooden vessels used to deploy balloons to nuclear-powered warships that carry numerous fighters, strike aircraft, helicopters, and other types of aircraft. While heavier aircraft such as fixed-wing gunships and bombers have been launched from aircraft carriers, these aircraft have not landed on a carrier. By its diplomatic and tactical power, its mobility, its autonomy and the variety of its means, the aircraft carrier is often the centerpiece of modern combat fleets. Tactically or even strategically, it replaced the battleship in the role of flagship of a fleet. One of its great advantages is that, by sailing in international waters, it does not interfere with any territorial sovereignty and thus obviates the need for overflight authorizations from third-party countries, reduces the times and transit distances of aircraft and therefore significantly increases the time of availability on the combat zone.

<span class="mw-page-title-main">Carrier battle group</span> Type of naval fleet with an aircraft carrier

A carrier battle group (CVBG) is a naval fleet consisting of an aircraft carrier capital ship and its large number of escorts, together defining the group. The CV in CVBG is the United States Navy hull classification code for an aircraft carrier.

<span class="mw-page-title-main">French Navy</span> Maritime arm of the French Armed Forces

The French Navy, informally La Royale, is the maritime arm of the French Armed Forces and one of the four military service branches of France. It is among the largest and most powerful naval forces in the world recognised as being a blue-water navy. The French Navy is capable of operating globally and conducting expeditionary missions, maintaining a significant overseas presence. The French Navy is one of eight naval forces currently operating fixed-wing aircraft carriers, with its flagship Charles de Gaulle being the only nuclear-powered aircraft carrier outside the United States Navy, and one of two non-American vessels to use catapults to launch aircraft.

<span class="mw-page-title-main">Force de dissuasion</span> French nuclear deterrence force

The Force de dissuasion, known as the Force de frappe prior to 1961, is the French nuclear deterrence force. The Force de dissuasion used to be a triad of air-, sea- and land-based nuclear weapons intended for dissuasion, the French term for deterrence. Following the end of the Cold War, France decommissioned all its land-based nuclear missiles, thus the Force de dissuasion today only incorporates an air- and sea-based arsenal.

<i>Queen Elizabeth</i>-class aircraft carrier Royal Navy aircraft carrier class

The Queen Elizabeth-class aircraft carriers of the United Kingdom's Royal Navy consists of two vessels. The lead ship of her class, HMS Queen Elizabeth, was named on 4 July 2014 in honour of Elizabeth I and was commissioned on 7 December 2017. Her sister ship, HMS Prince of Wales, was launched on 21 December 2017, and was commissioned on 10 December 2019. They form the central components of the UK Carrier Strike Group.

French aircraft carrier <i>Charles de Gaulle</i> French aircraft carrier

Charles de Gaulle is the flagship of the French Navy. The ship, commissioned in 2001, is the tenth French aircraft carrier, the first French nuclear-powered surface vessel, and the only nuclear-powered carrier completed outside of the United States Navy. She is named after French president and general Charles de Gaulle.

Horizon-class frigate Class of air-defence destroyers in service with the French and Italian navies.

The Horizon class (French: Classe Horizon; Italian: Classe Orizzonte) is a class of air-defence destroyers in service with the French and Italian navies. They are designated as destroyers by the Italians and are referred to as "frigates" by the French but nonetheless also use the NATO classification "D" intended for destroyers. The programme started as the Common New Generation Frigate (CNGF), a three-nation collaboration between France, the United Kingdom, and Italy to develop a new generation of air-defence warships. Differing national requirements, workshare disagreements and delays led to the UK withdrawing from the project in 1999 to develop the Type 45 destroyer.

Naval Group is a major French industrial group specializing in naval defense design, development and construction. Its headquarters are located in Paris.

<span class="mw-page-title-main">Nuclear marine propulsion</span> Propulsion system for marine vessels utilizing a nuclear powerplant

Nuclear marine propulsion is propulsion of a ship or submarine with heat provided by a nuclear reactor. The power plant heats water to produce steam for a turbine used to turn the ship's propeller through a gearbox or through an electric generator and motor. Nuclear propulsion is used primarily within naval warships such as nuclear submarines and supercarriers. A small number of experimental civil nuclear ships have been built.

A nuclear navy, or nuclear-powered navy, refers to the portion of a navy consisting of naval ships powered by nuclear marine propulsion. The concept was revolutionary for naval warfare when first proposed. Prior to nuclear power, submarines were powered by diesel engines and could only submerge through the use of batteries. In order for these submarines to run their diesel engines and charge their batteries they would have to surface or snorkel. The use of nuclear power allowed these submarines to become true submersibles and unlike their conventional counterparts, they became limited only by crew endurance and supplies.

French aircraft carrier <i>Foch</i> French Clemenceau-class aircraft carrier

Foch was the second Clemenceau-class aircraft carrier that served with the French Navy from 1963 to 2000. The carrier was the second warship named in honour of the Marshal of France, British Field Marshal and Marshal of Poland Ferdinand Foch.

<span class="mw-page-title-main">A1B reactor</span> U.S. Navy aircraft carrier nuclear reactor

The A1B reactor is developed by the United States Navy for the Gerald R. Ford-class nuclear-powered aircraft carriers. Each ship will be powered by two A1B reactors. The new reactor was named A1B, following the Navy's reactor-designation scheme of type, generation, and manufacturer: A for aircraft carrier, 1 for the maker's first reactor plant design, and B for Bechtel, the company making the reactor.

<span class="mw-page-title-main">CATOBAR</span> Carrier centric aircraft launch-recovery system

CATOBAR is a system used for the launch and recovery of aircraft from the deck of an aircraft carrier. Under this technique, aircraft launch using a catapult-assisted take-off and land on the ship using arrestor wires.

<i>Clemenceau</i>-class aircraft carrier Class of French aircraft carriers

The Clemenceau-class aircraft carriers are a pair of aircraft carriers, Clemenceau and Foch, which served in the French Navy from 1961 until 2000. From 2000 to 2017, one ship served with the Brazilian Navy as the São Paulo.

The Amphibious Assault Ship Project was a proposed procurement project by the Government of Canada for the Royal Canadian Navy (RCN). However, no such project was incorporated into the Government's defence plan Strong, Secure and Engaged released in 2017 and cost challenges with other naval procurement projects under the National Shipbuilding Procurement Strategy has led to no movement on the idea.

<span class="mw-page-title-main">Carrier-based aircraft</span> Military aircraft designed specifically for operations from aircraft carriers

A carrier-based aircraft is a naval aircraft designed for operations from aircraft carriers. Carrier-based aircraft must be able to launch in a short distance and be sturdy enough to withstand the abrupt forces of launching from and recovering on a pitching deck. In addition, their wings are generally able to fold up, easing operations in tight quarters.

INS Vishal, also known as Indigenous Aircraft Carrier 3 (IAC-3), is a planned aircraft carrier to be built by Cochin Shipyard Limited for the Indian Navy. It is intended to be the third aircraft carrier to be built in India after INS Vikrant (IAC-1) and another Vikrant-class aircraft carrier, provisionally called (IAC-2). The proposed design of this class will be a new design, featuring significant changes from Vikrant, including an increase in size and displacement. An Electromagnetic Aircraft Launch System (EMALS) CATOBAR system is also under consideration. Its name Vishal means 'Gargantuan' in Sanskrit.

<span class="mw-page-title-main">Dassault Rafale</span> Multi-role combat aircraft family by Dassault

The Dassault Rafale is a French twin-engine, canard delta wing, multirole fighter aircraft designed and built by Dassault Aviation. Equipped with a wide range of weapons, the Rafale is intended to perform air supremacy, interdiction, aerial reconnaissance, ground support, in-depth strike, anti-ship strike and nuclear deterrence missions. It is referred to as an "omnirole" 4.5th generation aircraft by Dassault.

Future French aircraft carrier France future aircraft carrier project

The French Navy is actively planning for a future aircraft carrier (supercarrier) and new flagship. It is known in French as Porte-avions de nouvelle génération (PA-NG) for 'new generation aircraft carrier'. Construction of the PANG is expected to begin around 2031 and it is projected to enter service in about 2038; the year the aircraft carrier Charles de Gaulle is due to be retired. The ship will be nuclear-powered and will feature the Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG).

References

  1. "Porte-Avions 2 (PA2)". naval-technology.com. Retrieved 18 February 2015.
  2. "Livre Blanc-2013" (in French). Ministry of Defence (France). 15 July 2013. Retrieved 18 February 2015.
  3. Keller, Greg (29 April 2013). "France to slash 24K military jobs, seeking savings". Huffington Post. Retrieved 18 February 2015.
  4. "UK-French agreement on aircraft carriers UK Ministry of Defence". UK Ministry of Defence. 24 January 2006. Archived from the original on July 11, 2006. Retrieved 8 July 2006.
  5. "Plaquette" (PDF) (in French). Défense. Archived from the original (PDF) on December 3, 2007.
  6. "French defence minister casts doubt on new aircraft carrier". Defence Talk. Archived from the original on April 30, 2008.
  7. Sage, Adam (21 June 2008). "President Sarkozy ditches Franco-British carrier project". The Times. London. Archived from the original on July 1, 2009. Retrieved 3 May 2010.(subscription required)
  8. meretmarine.com Archived March 20, 2009, at the Wayback Machine
  9. "PA2 programme". Question Defense. Archived from the original on September 30, 2007.