In the mathematical theory of probability, a generalized renewal process (GRP) or G-renewal process is a stochastic point process used to model failure/repair behavior of repairable systems in reliability engineering. Poisson point process is a particular case of GRP.
The G-renewal process is introduced by Kijima and Sumita through the notion of the virtual age. [1]
Kaminskiy and Krivtsov [2] extended the Kijima models by allowing q > 1, so that the repair damages (ages) the system to a higher degree than it was just before the respective failure.
Mathematically, the G-renewal process is quantified through the solution of the G-renewal equation:
A closed-form solution to the G-renewal equation is not possible. Also, numerical approximations are difficult to obtain due to the recurrent infinite series. A Monte Carlo based approach to solving the G-renewal Equation was developed by Kaminiskiy and Krivtsov. [2] [3]
The G–renewal process gained its practical popularity in reliability engineering only after methods for estimating its parameters had become available.
The nonlinear LSQ estimation of the G–renewal process was first offered by Kaminskiy & Krivtsov. [2] A random inter-arrival time from a parameterized G-Renewal process is given by:
The Monte Carlo solution was subsequently improved [4] and implemented as a web resource. [5]
The maximum likelihood procedures were subsequently discussed by Yañez, et al., [6] and Mettas & Zhao. [7] The estimation of the G–renewal restoration factor was addressed in detail by Kahle & Love. [8]
The estimation of G–renewal process parameters is an ill–posed inverse problem, and therefore, the solution may not be unique and is sensitive to the input data. Krivtsov & Yevkin [9] [10] suggested first to estimate the underlying distribution parameters using the time to first failures only. Then, the obtained parameters are used as the initial values for the second step, whereat all model parameters (including the restoration factor(s)) are estimated simultaneously. This approach allows, on the one hand, to avoid irrelevant solutions (wrong local maximums or minimums of the objective function) and on the other hand, to improve computational speed, as the number of iterations significantly depends on the selected initial values.
One limitation of the Generalized Renewal Process is that it cannot account for "better-than-new" repair. [11] The G1-renewal process has been developed which applies the restoration factor to the life parameter of a location-scale distribution to be able to account for "better-than-new" repair in addition to other repair types.