Genoa–Ventimiglia railway

Last updated
Genoa–Ventimiglia railway
Treno Andora Cervo.jpg
The line near Cervo
Overview
Native nameFerrovia Genova-Ventimiglia
Owner Rete Ferroviaria Italiana
Locale Liguria, Italy
Termini
Service
Operator(s) Trenitalia
History
Opened25 January 1872 (1872-01-25)
Technical
Line length147 km (91 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Route map

Contents

BSicon CONTg.svg
BSicon tBHFa@f.svg
Genova Brignole
BSicon tBS2+l.svg
BSicon tBS2+r.svg
BSicon tBHFea.svg
BSicon tHST.svg
Genova Piazza Principe / Genova P.P. low level
BSicon tdCONTgq.svg
BSicon tABZgr.svg
BSicon tSTR.svg
junction to Fegino Turin–Genoa railway
BSicon PORTALg.svg
BSicon STR.svg
BSicon tHSTe@g.svg
0+980
Genova Via di Francia
BSicon BS2l.svg
BSicon BS2r.svg
BSicon MASK-c3.svg
BSicon ABZgr.svg
BSicon nSTR+r.svg
BSicon BHFABZgr+r.svg
0.20
Genova Sampierdarena Feature ticket office.svg Feature suburban buses.svg Feature parking.svg Italian traffic signs - sottopassaggio pedonale.svg AB-Autobahnkiosk.svg News.svg RWBA WC.svg
To Torbella junction, Milan, Turin and Acqui Terme
BSicon KRZo.svg
Between Genova Sampierdarena goods
yard and Genova Marittima goods yard
BSicon HST.svg
2.10
Genova Cornigliano Italian traffic signs - sottopassaggio pedonale.svg
BSicon HST.svg
3.70
Genova Sestri Ponente Feature ticket office.svg Italian traffic signs - sottopassaggio pedonale.svg AB-Autobahnkiosk.svg
BSicon cSTRc3.svg
BSicon HST.svg
6.30
Genova Pegli Feature ticket office.svg Feature parking.svg
 
Galleria Doria
BSicon MSTR.svg
BSicon vUSTo+4.svg
BSicon lvHST.svg
8+560
Genova Pra'
Castelluccio junction
BSicon vSTR-BST.svg
9.70
Genova Voltri mare
BSicon SHI2g+r~L.svg
BSicon SHI2gl~R.svg
BSicon vBHF-KBHFe.svg
11.00
Genova Voltri
BSicon tSTRa.svg
Crevari tunnel (2.445 m)
BSicon tSTRe.svg
BSicon HST.svg
15.00
Genova Vesima
BSicon BS2+l.svg
BSicon eBS2+r.svg
BSicon tSTRa.svg
BSicon exSTR.svg
Torre Rossa tunnel (1.610 m)
BSicon tSTRe.svg
BSicon exSTR.svg
BSicon HST.svg
BSicon exHST.svg
18.20
Arenzano
BSicon BS2l.svg
BSicon eBS2r.svg
BSicon BHF.svg
Cogoleto
BSicon BS2+l.svg
BSicon eBS2+r.svg
BSicon BHF.svg
BSicon exHST.svg
28.60
Varazze / old Varezze
BSicon HST.svg
BSicon exHST.svg
31.10
Celle Ligure / old Celle Ligure
BSicon HST.svg
BSicon exHST.svg
33.90
Albisola / Albisola Capo
BSicon ABZg+r.svg
BSicon exABZg+r.svg
BSicon BHF.svg
BSicon exBHF.svg
39.10
Savona Mongrifone / Savona Letimbro
BSicon STR.svg
BSicon xABZg+l.svg
From Savona port
BSicon BS2l.svg
BSicon BS2r.svg
BSicon DST.svg
40.50
Savona Parco Doria
BSicon BS2+l.svg
BSicon BS2+r.svg
BSicon HST.svg
BSicon KDSTxe.svg
43.30
Quiliano - Vado / Vado industrial area
BSicon TUNNEL1.svg
BSicon exHST.svg
Bergeggi
BSicon BHF.svg
BSicon exBHF.svg
49.80
Spotorno - Noli / Spotorno
BSicon tSTRa.svg
BSicon exHST.svg
Noli
BSicon tSTR.svg
BSicon exHST.svg
Varigotti
BSicon tSTRe.svg
BSicon exHST.svg
Finalpia
BSicon xABZg2.svg
BSicon xSTR+c3.svg
BSicon xSTR+c1.svg
BSicon xABZg+4.svg
BSicon exSTR.svg
BSicon BHF.svg
58.40
Finale Ligure Marina
End of double line
BSicon exSTR.svg
BSicon HST.svg
65.80
Borgio Verezzi
BSicon exBHF.svg
BSicon BHF.svg
68.70
Pietra Ligure
BSicon exSTR.svg
BSicon BHF.svg
72.00
Loano
Start of double line
BSicon exBHF.svg
BSicon HST.svg
73.70
Borghetto Santo Spirito
BSicon exSTR.svg
BSicon HST.svg
75.00
Ceriale
BSicon exBHF.svg
BSicon BHF.svg
80.90
Albenga
End of double line
BSicon exBHF.svg
BSicon BHF.svg
87.10
Alassio
BSicon exSTR.svg
BSicon HST.svg
90.30
Laigueglia
BSicon xSTR+c2.svg
BSicon xABZg3.svg
Start of double line
BSicon xABZg+1.svg
BSicon xSTR+c4.svg
BSicon BHF.svg
BSicon exBHF.svg
Andora / old Andora
BSicon htSTRa@g.svg
BSicon exSTR.svg
Collecervo tunnel (3.463 m)
BSicon htSTRe@f.svg
BSicon exBHF.svg
Cervo-San Bartolomeo
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river Cervo
BSicon htSTRa@g.svg
BSicon exSTR.svg
Caighei tunnel (2.692 m)
BSicon htHSTe@g.svg
BSicon exSTR.svg
Diano
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river San Pietro
BSicon htSTRa@g.svg
BSicon exSTR.svg
Castello tunnel (680 m)
BSicon htSTRe@f.svg
BSicon exBHF.svg
Diano Marina
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river Varcavello
BSicon htSTRa@g.svg
BSicon exSTR.svg
Gorleri tunnel (3.265 m)
BSicon tSTR.svg
BSicon extSTRa.svg
Capo Berta tunnel(2.435 m)
BSicon tSTR.svg
BSicon extSTRe.svg
BSicon tSTR.svg
BSicon exBHF.svg
Imperia Oneglia
BSicon htSTRe@f.svg
BSicon exABZg+l.svg
junction to Oneglia Port and Agnesi factory
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river Impera
BSicon htBHFa@f.svg
BSicon exSTR.svg
Imperia
BSicon tSTR.svg
BSicon exSTR.svg
Bardellini tunnel (3.051 m)
BSicon tSTR.svg
BSicon exABZgl.svg
junction to Porto Maurizio
BSicon htSTRe@f.svg
BSicon exBHF.svg
Imperia Porto Maurizio
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river Caramagna
BSicon htSTRae.svg
BSicon exSTR.svg
Caramagnetta tunnel (318 m)
BSicon hKRZW.svg
BSicon exWBRUCKE1.svg
river Prino
BSicon htSTRa@g.svg
BSicon exSTR.svg
Poggi Terrabianca tunnel (3.021 m)
BSicon tSTR.svg
BSicon extSTRc2.svg
BSicon exABZg3xu.svg
BSicon etABZg+1.svg
BSicon exSTR.svg
BSicon tSTRe@g.svg
BSicon exSTR.svg
BSicon tSTRa.svg
BSicon exSTR.svg
Santo Stefano tunnel (7.853 m)
BSicon tSTR.svg
BSicon exBHF.svg
San Lorenzo-Cipressa
BSicon tSTR.svg
BSicon exTUNNEL1.svg
old San Lorenzo tunnel
BSicon tSTR.svg
BSicon exBHF.svg
Santo Stefano-Riva Ligure
BSicon MSTR-q.svg
BSicon tSTRe@g.svg
BSicon WBRUCKE1.svg
BSicon exWBRUCKE1.svg
river Argentina
BSicon BHF.svg
BSicon exSTR.svg
Taggia-Arma
BSicon tSTRa.svg
BSicon exSTR.svg
start of Capo Verde tunnel (5.367 m)
BSicon tSTR.svg
BSicon exBHF.svg
Old Taggia-Arma
BSicon tSTR.svg
BSicon exTUNNEL1.svg
old Capo Verde tunnel
BSicon tHST.svg
BSicon exSTR.svg
Sanremo
BSicon tSTR.svg
BSicon exBHF.svg
old San Remo
BSicon tSTR.svg
BSicon exSTR.svg
start of Capo Nero tunnel (7.221 m)
BSicon tSTR.svg
BSicon exTUNNEL1.svg
old Capo Nero tunnel
BSicon tSTR.svg
BSicon exBHF.svg
Ospedaletti Ligure
BSicon PORTALg.svg
BSicon BS2l.svg
BSicon eBS2r.svg
end of Capo Nero tunnel
BSicon HST.svg
142.60
Bordighera
BSicon HST.svg
145.20
Vallecrosia
BSicon BHF.svg
147.30
Ventimiglia
BSicon ABZgr.svg
BSicon GRENZE.svg
Italian/French border
BSicon STR.svg
Line to Marseille
Map Mappa ferrovia Genova-Ventimiglia.png
Map
Ventimiglia station Gare de Vintimille-Ventimiglia.jpg
Ventimiglia station

The Genova-Ventimiglia railway runs along the coast of the Liguria region of Italy. It was opened as a single track line between Genova and Savona in 1868, and between Savona and Ventimiglia in 1872, mostly running along a coastal corniche.

A large part of the line was doubled in 2004-2017, mainly by building an entirely new double track line parallel to the old railway, which often ran through towns where space could not be found for a second track. The new line was opened in 2017, and subsequently, the old line was closed. The new line features an increased maximum speed of 180 km/h; on the old line, speed had been limited to 100 km/h. The line is mainly in tunnels: 61 km of the 74 km of line between Ospedaletti and Finale Ligure is underground, and the rest of the line has similar proportions. The longest tunnel is Caponero-Capoverde (13.135 km). This tunnel includes the new Sanremo station. Due to it being mainly in tunnels, the new line does not feature views of the Ligurian coast, making it less attractive for sightseeing.

The last 32 km of the new double line are in the planning stage (Andora-Finale Ligure) as of 2025. [1]

History

The idea of a railway along the Ligurian coast began in March 1857 with what was called the Railway of the Ligurian Riviera (Italian: Ferrovia delle Riviere Liguri) with the inauguration of a project for a railway from the Var river in Nice—then the border of the Kingdom of Sardinia and France—to the Magra river—which then marked the border Sardinia of and Duchy of Modena. This was part of the ambitious project for the building of a railway system, considered by Cavour as an important part of the process of Italian unification.

A railway was already in operation for a short distance west from Genoa, between the stations of Sampierdarena and Voltri, opened on 8 April 1856, which branched off the Turin–Genoa line. The rapid progress in the creating the Kingdom of Italy gave further impetus to the project leading to the proclamation of a law on 27 October 1860 establishing the Ligurian Railway (Italian: Ferrovia ligure) to run along the coast from Ventimiglia to Massa where it would join an existing railway line. Despite the need to build many tunnels and viaducts this work was carried out quickly and the 29 kilometre extension from Genoa to Savona Letimbro was inaugurated on 25 May 1868. In 1865 the line had been absorbed by the newly established Società per le strade ferrate dell'Alta Italia (Upper Italian Railways). On 25 January 1872, the line was completed to Ventimiglia. The seven km connection from Ventimiglia to the relocated French border was opened two months later.

In the building of the line, its designers did not pay much attention to the needs of the territory through which it was built but instead mainly took into account military considerations and the political purposes of the new Kingdom of Italy. As most transport in the area, both passenger and freight was mainly carried by sea, the selected route ran virtually at sea level, closely following the coast and, where possible the Via Aurelia, linking more than 40 villages that had previously been difficult to reach by land. In 1885, the line was integrated into the new Società per le Strade Ferrate del Mediterraneo (Mediterranean System), which was taken over by the Ferrovie dello Stato in 1905.

Doubling

Due to the difficulty of building the line and in order to minimise costs, the line was built almost entirely as a single track. This soon proved inadequate for its traffic. In the early twentieth century work began on designing improvements to the line, but duplication work proceeded very slowly, so much so that some sections between Imperia and Finale Ligure are still single track. Almost all doubling has involved the construction of new largely underground line, with the abandonment of the old line. [2] [3]

Sections doubled by 1969 were:

The first part of the doubling, between the station of Genova Voltri and Varazze, was opened in 1970. The new line was moved inland compared to the old route, removed to railway from the coastal towns of Arenzano, Cogoleto and Varazze. A new station was built in Arenzano. [2] [3]

The old railway line was partly re-used and partly abandoned. In particular in the area of Vesima, after years of abandonment, the route of the old line was used for the widening of the roadway of the Via Aurelia within the three towns. The suburban sections were originally abandoned but have been recovered in recent years to be used as pedestrian paths. [2] [3]

In 1977, the new section between Finale Ligure and Varazze was completed very late compared with the original program; it included the new station of Savona Mongrifone. The abandoned line was absorbed by the urban fabric, with much of it converted into a promenade.

In Savona the old station was left abandoned for a long while. The new station, built between 1961 and 1962 to the design of the engineer Pier Luigi Nervi, was opened by President Antonio Segni.

After 25 years of planning, public discussion and construction the new double line between Imperia and Bordighera, opened in 2001, including new stations in Arma di Taggia and Sanremo, while San Lorenzo, Santo Stefano and Ospedaletti lost their stations.

On 2 April 2005 a deviation of the line between Voltri and Pegli was opened, including the building of a new station of Genova Prà in replacement of the original one built in 1856, transferred to City Municipality for non railway purposes. The new station of Pra' due to its huge parking place is nowadays one of the busiest and most utilized stations in Genova. the old railway area in the territory of Prà has been utilized to build a new road and promenade, reconnecting the city with its littoral and sea, within a European Union co-financed project named "P.O.R. - Pra' Marina".

A new section of double track has been built between San Lorenzo al Mare and Andora, diverting the line inland via a series of new tunnels and viaducts. It replaced the old coastal route and includes new stations at Andora, Diano and Imperia that replaced older stations, including two former stations in Imperia. This new section was scheduled for completion at the end of 2009, but was delayed. [4] Work on the section of line through Imperia ground to a halt in 2011, [5] and after the resolution of legal disputes between the main contractors, construction recommenced in February 2014. [6] The new section was opened at the 2016 winter timetable change.

The last section to be double-tracked, between Andora and Finale Ligure, is currently in planning stage. The section is 32 kilometers long, of which 25 will be in tunnels. The completion is scheduled for 2029. [7]

See also

References

  1. "Genova - Ventimiglia". www.fsitaliane.it (in Italian). Retrieved 2025-02-17.
  2. 1 2 3 Ferrara A., Valdambrini F., Pedemonte S., Progettazione e realizzazione degli impianti di sicurezza della Fermata Sotterranea di Sanremo e delle gallerie correnti, Quarry & Construction, no 2, February 1998
  3. 1 2 3 Pedemonte Sergio, Valdambrini Franco, Spostamento a monte tra S. Lorenzo e Ospedaletti, Quarry & Construction, no 2, February 1998
  4. "Raddoppio ferroviario Genova - Ventimiglia Stato di avanzamento del progetto". Trail Liguria (in Italian). Archived from the original on 7 November 2014. Retrieved 1 October 2014.
  5. Famà, Natalino (23 October 2011). "Raddoppio ferroviario: cantieri paralizzati". Il Secolo XIX (in Italian). Retrieved 4 October 2014.
  6. de Fazio, Mario (14 February 2014). "Liguria, intesa sul raddoppio della ferrovia". The MediTelegraph. Retrieved 4 October 2014.