The Grangemouth branch railways served Grangemouth docks on the Firth of Forth, Scotland, connecting the docks to the main line railway network. The first line was opened in 1860. The docks and the branch line developed considerably, and a second branch line was opened in 1911. Grangemouth docks was exceptionally busy during World War I, supplying the Grand Fleet.
The 1911 branch line closed in 1991, but the original section remains in use today for freight traffic.
The Forth and Clyde Canal opened in 1790, connecting the River Clyde at Bowling with the Firth of Forth at Grangemouth. As well as having a basin at Grangemouth, the canal company constructed facilities for transshipping from canal boats to sea-going vessels at Grangemouth. Much of the traffic was minerals and manufactured goods for export, including coastwise trade.
The Edinburgh and Glasgow Railway opened its main line in 1842, passing through Falkirk. To obtain access from the Edinburgh direction on to the Scottish Central Railway towards Stirling and Perth, the E&GR encouraged a nominally independent Stirlingshire Midland Junction Railway to build a line from Polmont to a junction near Larbert, via Grahamston (then a town in its own right, a little to the north of Falkirk). In fact the E&GR took over the SMJR company before the line was built. The line opened on 1 October 1850. [1] [ page needed ]
It was the Forth and Clyde Canal which took the initiative to build a railway branch line into its harbour facility at Grangemouth. It built a single line from just east of Grahamston station to the harbour; the line opened in 1860 for goods, and for passengers on 1 November 1861. [2] [ page needed ] It was worked by the Edinburgh and Glasgow Railway. [3] [ page needed ]
On 20 June 1867 the Forth and Clyde Navigation Act 1867 was passed, authorising the Caledonian Railway to acquire the Forth and Clyde Canal, as well as the Monkland Canal and the Forth and Cart Canal, and the railway branch line from Grahamston (Falkirk) to Grangemouth, as well as the Drumpeller Railway. [4] [ page needed ]
The capital value of the Forth and Clyde Canal was £1,141,333. The purchase price was calculated to guarantee the F&CC shareholders 6.5% on their shareholding, a little higher than their recent dividend level. As part of the authorising arrangements, the North British Railway(NBR)was given running powers over the branch line, and reciprocal powers were given to the Caledonian over the line from Grangemouth Junction to Larbert Junction. (NBR had promoted a branch line from Bo'ness to Grangemouth, and dropped the scheme on being given the running powers. [5] [ page needed ]) The line was operated by a manager responsible to the two railways companies jointly, and both companies ran passenger trains to Grangemouth. The Caledonian was now a canal and harbour owner, and did much to improve the facilities offered by those assets. [4] [ page needed ] Indeed, the improved waterway services abstracted some traffic from the parallel Kelvin Valley line. [6]
On 3 June 1882, the Caledonian opened the new Carron Dock at Grangemouth. The port was capable of handling large steamships, and hydraulic coal elevators made rapid loading possible. Although the Act did not allow the Caledonian Railway to use the NBR Grahamston station, NBR conceded the use of it from 1 August 1883 after the Caledonian threatened to obtain powers to build an independent railway between Larbert and the Grangemouth branch. [note 1] The port was said to be capable of handling a considerable additional volume of shipping, but already by 1893 "coal companies were demanding more quays at Grangemouth because of congestion in that port". [8] [ page needed ]
On 10 October 1906, a new Grange Dock was opened at Grangemouth. The harbour capacity was doubled, and ships of 7,000 tons could use the entrance lock. Considerable extra siding accommodation was provided over and above the marshalling sidings at Fouldubs. Eight hydraulic coal hoists were provided, each capable of handling 50 wagons an hour; there was a gravitational system to feed the wagons to the hoist and away again after discharge, and 120 hydraulic capstans were provided, substantially reducing the use of horses for wagon movements. A new quayside passenger platform was provided for occasional passenger use, replacing platforms originally placed at the Carron Dock for use by passengers on Carron Line ships to London. [4] [ page needed ]
A station was opened at Thornbridge on 1 December 1899 for the use of workmen, in connection with an adjacent factory not easily reached by road. It was not advertised in public timetables, and it closed on 1 August 1938. [2] [ page needed ] [9] [ page needed ]
Grangemouth traffic continued to grow considerably, and the heavy traffic running through Grahamston was causing difficulty. A new connection was proposed, leaving the Grahamston line west of that station (at what became Swing Bridge Junction) and running via Bainsford, and joining the original branch line at Fouldubs. Agreement was reached that both the NBR and the Caledonian would build the branch, the section from Swing Bridge Junction to Bainsford being built by the NBR, and the eastern section from there to Fouldubs being built by the Caledonian Railway. [3] [ page needed ]
In fact the NBR section was completed in 1908, serving ironworks in the area of Bainsford. The Caledonian section was not opened until 1911, then completing the through route. There was a large swing bridge over the Forth and Clyde Canal. [3] [ page needed ] [4] [ page needed ] This section never carried local passenger trains.
On 4 August 1914 the United Kingdom declared war on Germany: World War I had started. The following day the Caledonian Railway received a letter from the War Office to inform it that it had been taken under Government control, pursuant to the Regulation of Railways Act 1871. Eight days after the declaration of war, Grangemouth Docks were declared a military area, and access was only permitted on production of an official pass. The Grand Fleet was based at Scapa Flow in the Orkney Islands, and on a wartime footing it had a huge demand for fuel, provisions and other supplies, that the Highland Railway and the northern port facilities were incapable of handling. Grangemouth became the effective railhead for the fleet, and so-called Jellicoe Specials (named after the Commander in Chief of the Grand Fleet, Admiral Jellicoe), conveyed steam coal from South Wales. [note 2] [4] [ page needed ]
From 15 January 1915 Aberdeen was designated as the prime railhead for bulk supplies to the Grand Fleet, except for fuel. Grangemouth continued to handle the fuel supplies, in addition to a wide diversity of other supplies. Between March and June 1915, 8,000 tons of flour was stored in seven sheds; and in 1915 - 1916 19,000 tons of hay (for feed for horses on active service) were delivered by rail. Grange Dock warehouses were requisitioned by the Admiralty as a mine depot from January 1916, and during the remainder of hostilities handled 57,600 tons of the munitions. The trains were handled by Admiralty locomotives within the harbour area.
A victualling yard occupying five warehouse sheds was established in June 1916 at Carron Dock; during the remainder of the war it handled 51,000 tons of supplies. During the war the docks handled 2,306,000 tons of coal. A temporary station was opened in the dock area, to enable the greatly increased dock workforce to travel to and from their work; there were four daily trains from Grahamston. After the armistice of 11 November 1918, this station was the departure point for 27 special trains during December 1918 and January 1919, carrying men who were being demobilised from the Grand Fleet.
The Port was returned to the control of the Caledonian Railway on 25 December 1918, although the Admiralty retained a presence for a further three months. [4] [ page needed ]
The railway resumed peacetime operation, but the Government reorganised the railways into four "groups" by the Railways Act 1921; the Caledonian Railway was a constituent of the new London Midland and Scottish Railway (LMS), and the NBR a constituent of the London and North Eastern Railway (LNER) from 1923. The Grangemouth Branch Railway therefore remained a separate joint undertaking.
The peak period of Scottish coal exports had passed, and the volume of material handled declined steadily. During World War II the geographical emphasis of naval activity was elsewhere, and the heavy use of Grangemouth was not repeated. After nationalisation of the railways in 1948, the area was under the control of the Scottish Region of British Railways. Changing social patterns, the rise of efficient and cheap bus services, and the further decline of the port activity resulted in attrition of the passenger services, which finally closed on 29 January 1968. [2] [ page needed ]
At that time the western section of the line from Swing Bridge Junction closed; the remaining operational section was from Fouldubs Junction to the Orchardhall Aluminium Rolling Mill. This closed in 1991, and the branch section closed with it. [10] [ page needed ]
The line to Grangemouth freight terminal was electrified in 2019.
The section of line from Grangemouth Junction to Grangemouth remains open for freight traffic. The Forth Port Authority now control the harbour area; there is also an oil terminal. [11]
The Forth and Clyde Canal is a canal opened in 1790, crossing central Scotland; it provided a route for the seagoing vessels of the day between the Firth of Forth and the Firth of Clyde at the narrowest part of the Scottish Lowlands. This allowed navigation from Edinburgh on the east coast to the port of Glasgow on the west coast. The canal is 35 miles (56 km) long and it runs from the River Carron at Grangemouth to the River Clyde at Bowling, and had an important basin at Port Dundas in Glasgow.
Grangemouth is a town in the Falkirk council area, Scotland. Historically part of the county of Stirlingshire, the town lies in the Forth Valley, on the banks of the Firth of Forth, 3 miles (4.8 km) east of Falkirk, 5 miles (8.0 km) west of Bo'ness and 13 miles (20.9 km) south-east of Stirling. Grangemouth had a resident population of 17,906 according to the 2001 Census. Preliminary figures from the 2011 census reported the number as 17,373.
The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.
The Edinburgh and Glasgow Railway was authorised by act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.
Falkirk Grahamston railway station is one of two railway stations serving the town of Falkirk in Scotland. It is located on the Edinburgh to Dunblane Line and also the Cumbernauld Line. Train services are provided by ScotRail. The "Highland Chieftain", the daily London North Eastern Railway service from London King's Cross to Inverness and vice versa also calls here.
The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.
The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.
The Stirling and Dunfermline Railway was a railway in Scotland connecting Stirling and Dunfermline. It was planned by the Edinburgh and Glasgow Railway to get access to the mineral deposits on the line of route, but also as a tactical measure to keep the rival Caledonian Railway out of Fife.
The Glasgow City and District Railway was a sub-surface railway line in Glasgow, Scotland, built to connect suburban routes east and west of the city, and to relieve congestion at the Queen Street terminus.
The Alloa Railway was intended to bridge the River Forth linking Alloa with the south without using a ferry.
The Forth and Clyde Junction Railway was a railway line in Scotland which ran from Stirling to Balloch.
The Dundee and Arbroath Railway was an early railway in Scotland. It opened in 1838, and used the unusual track gauge of 5 ft 6 in (1,676 mm). In 1848 it changed to standard gauge and connected to the emerging Scottish railway network.
The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.
The Edinburgh and Northern Railway was a railway company authorised in 1845 to connect Edinburgh to both Perth and Dundee. It relied on ferry crossings of the Firth of Forth and the Firth of Tay, but despite those disadvantages it proved extremely successful. It took over a short railway on the southern shore of the Forth giving a direct connection to Edinburgh, and it changed its name to the Edinburgh, Perth and Dundee Railway.
The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.
The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.
The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.
The Kilsyth and Bonnybridge Railway was a railway line in central Scotland, built to exploit the mineral extractive industries in the area; it opened in 1888. A passenger service was run, but bus competition overwhelmed it after 1920 and the passenger service closed in 1935. The goods and mineral traffic continued, but it was dependent on the industries it served, and when they declined so did the business on the railway; it closed in 1964 and none of it is now in railway use.
The Wemyss and Buckhaven Railway was a railway company that built a line in the county of Fife in Scotland, connecting Buckhaven with the main line railway network at Thornton, and linking with collieries.