Greenville and Knoxville Railroad

Last updated

The Greenville and Knoxville Railroad was a South Carolina railroad that operated in the early 20th century.

The Greenville and Knoxville was formed in 1907, to reopen the 16-mile route between Greenville, South Carolina, and River Falls, South Carolina, [1] abandoned by the Carolina, Knoxville and Western Railway a few years early.

In 1914 the railroad once again reorganized, this time as the Greenville and Western Railroad. It was renamed the Greenville and Northern Railway six years later.

Related Research Articles

The Tennessee Central Railway was founded in 1884 as the Nashville and Knoxville Railroad by Alexander S. Crawford. It was an attempt to open up a rail route from the coal and minerals of East Tennessee to the markets of the midstate, a service which many businessmen felt was not being adequately provided by the existing railroad companies. They also wanted to ship coal and iron ore to the Northeastern US over the Cincinnati Southern Railway, which was leased to the Southern and operated as the Cincinnati, New Orleans and Texas Pacific Railway (CNOTP), through their Cincinnati gateway. The N&K was only completed between Lebanon, where it connected to a Nashville, Chattanooga and St. Louis Railway branch from Nashville, and Standing Stone.

The Augusta and Knoxville Railroad (A&K) was a railroad company that operated on 66 miles (106 km) of track between Augusta, Georgia, and Greenwood, South Carolina, from 1882 to 1886. It was merged with three other companies to form the Port Royal and Western Carolina Railway, which was reorganized in 1896 as the Charleston and Western Carolina Railway.

The Blue Ridge Railway was a 19th-century railroad in the U.S. state of South Carolina. It was originally chartered in 1852 as the Blue Ridge Railroad of South Carolina. Original plans were for a 195-mile line from Anderson, South Carolina, to Knoxville, Tennessee going through the mountains with as many as 13 tunnels including the incomplete Stumphouse Mountain Tunnel.

The Charleston and Western Carolina Railway (C&WC) was formed in 1896 to operate the lines of the former Port Royal and Augusta Railway (PR&A) and the Port Royal and Western Carolina Railway (PR&WC). The PR&A and PR&WC had originally been part of the Central of Georgia Railroad but the South Carolina Legislature had forced the railroad to give up the subsidiary lines. The Atlantic Coast Line Railroad (ACL) took over the C&WC in 1897 but operated it as a subsidiary until 1959 when the ACL fully absorbed it. Much of the original system is still in use by ACL successor CSX Transportation.

The Piedmont & Northern Railway was a heavy electric interurban company operating over two disconnected divisions in North and South Carolina. Tracks spanned 128 miles (206 km) total between the two segments, with the northern division running 24 miles (39 km) from Charlotte, to Gastonia, North Carolina, including a three-mile (5 km) spur to Belmont. The southern division main line ran 89 miles (143 km) from Greenwood to Spartanburg, South Carolina, with a 12 mi (19 km) spur to Anderson. Initially the railroad was electrified at 1500 volts DC, however, much of the electrification was abandoned when dieselisation was completed in 1954.

<span class="mw-page-title-main">Carolina Piedmont Railroad</span>

The Carolina Piedmont Railroad is a class III railroad and subsidiary of Genesee & Wyoming Inc. operating in the Upstate region of South Carolina. From an interchange with CSX Transportation at Laurens the railroad runs 34 miles (55 km) to the northwest, terminating at East Greenville.

The Savannah Valley Railroad was a railroad company in the U.S. state of Georgia in the early 1880s. It was merged by its lessor, the Port Royal and Augusta Railway, with the Augusta and Knoxville Railroad, Greenwood, Laurens and Spartanburg Railroad and the Greenville and Laurens Railroad into the Port Royal and Western Carolina Railway on October 27, 1886.

The Greenville and Northern Railroad was a shortline railroad formerly operating between Travelers Rest and Greenville, South Carolina, 11.3 miles (18.2 km). The railroad was part of the Pinsly Railroad Company after 1957 before being purchased by RailTex in 1997. Operations ended in February 1998 and the railroad was abandoned in 2005.

The Port Royal and Western Carolina Railway (PR&WC) was a railroad company in the southern United States that operated on 229 miles (369 km) of 4 ft 9 in gauge track. It was formed in 1886 by the merger of the Augusta and Knoxville Railroad, Greenwood, Laurens and Spartanburg Railroad, Savannah Valley Railroad and the Greenville and Laurens Railroad, which then joined with Port Royal and Augusta Railway.

The Atlantic, Greenville and Western Railway was a railroad company chartered by the South Carolina General Assembly in 1885.

The Greenville and Port Royal Railroad was a railroad chartered by the South Carolina General Assembly in 1882.

The Augusta, Knoxville and Greenwood Railroad (AK&G) was a South Carolina railroad company chartered shortly after the end of the Reconstruction period.

The Carolina, Knoxville and Western Railway was a South Carolina railroad that existed in the latter half of the 19th century.

The Greenville and Knoxville Railway was a South Carolina railroad company that operated in the western part of the state in the early part of the 20th century.

The Greenville and Western Railroad was a South Carolina railroad company that operated in the western part of the state in the early part of the 20th century.

The Greenwood, Laurens and Spartanburg Railroad was a South Carolina railroad company begun after Reconstruction.

<span class="mw-page-title-main">Sievern and Knoxville Railroad</span> Defunct South Carolina railroad

The Sievern and Knoxville Railroad was a South Carolina railroad that operated from the late 19th century into the first half of the 20th century.

The Greenwood, Anderson and Western Railway was a South Carolina railroad established in the late 19th century.

References