Carolina, Knoxville and Western Railway

Last updated

The Carolina, Knoxville, and Western Railway was a railroad in the southeastern United States, established in 1887 to build a line connecting Augusta, Georgia, and Knoxville, Tennessee. Despite ambitious plans, only about 14 miles of track were laid before financial difficulties led to the suspension of construction. The railway was intended to facilitate coal transportation and provide a direct route over the Appalachian Mountains. After insolvency in 1894, the line was eventually abandoned in 1899.

Contents

Formation

The railway was formed in 1887 with the goal of building a rail line from Augusta, Georgia to Knoxville, Tennessee. Financing was accomplished through bond sales. [1] The company consolidated that same year with the Pennsylvania and Haywood Railroad and the Atlantic, Greenville and Western Railway to operate under the Carolina, Knoxville, and Western Railway moniker. [2]

The newly formed company began construction on a route from Greenville, South Carolina to Marietta, South Carolina. Approximately 14 miles of rail were laid, and additional grading was completed before work was suspended due to the financial collapse of the Georgia Construction and Investment Co., which had the contract for the entire project. [3] The railway was intended to bring coal from Tennessee to South Carolina and provide a direct route over the mountains.

Financial troubles and abandonment

By 1894, the Carolina, Knoxville and Western Railway faced insolvency. Its president, Joseph B. Humbert, filed a lawsuit in an attempt to recover unpaid wages. Despite efforts to revive the railway, including the formation of the Greenville and Knoxville Railroad in 1907, the line was fully abandoned by 1899. [4]

Remnants of the South Carolina portion of the railway can still be seen alongside U.S. Route 276, particularly around Marietta, South Carolina. The remaining tracks were removed in 2006.

Related Research Articles

<span class="mw-page-title-main">U.S. Route 25</span> Highway in the United States

U.S. Route 25 or U.S. Highway 25 (US 25) is a north–south United States Numbered Highway that runs for 750 miles (1,210 km) in the Southern and Midwestern U.S. Its southern terminus is in Brunswick, Georgia, from where it proceeds mostly due north, passing through the cities of Augusta, Georgia; Greenville, South Carolina; and Asheville, North Carolina, before dividing into two branches, known as US 25W and US 25E between Newport, Tennessee, and North Corbin, Kentucky. After passing through Richmond and Lexington, Kentucky, it reaches its northern terminus at Ohio state line in Covington, Kentucky. The route is an important crossing of the Appalachian Mountains, and it is covered by three of the corridors of the Appalachian Development Highway System (ADHS). When the highway was originally established in 1926, the route extended from North Augusta, South Carolina, to Port Huron, Michigan. The southern end was extended to its current terminus in 1936, while the northern end was truncated in 1974.

<span class="mw-page-title-main">Southern Railway (U.S.)</span> Defunct United States railroad

The Southern Railway was a class 1 railroad based in the Southern United States between 1894 and 1982, when it merged with the Norfolk and Western Railway (N&W) to form the Norfolk Southern Railway. The railroad was the product of nearly 150 predecessor lines that were combined, reorganized and recombined beginning in the 1830s, formally becoming the Southern Railway in 1894.

The Tennessee Central Railway was founded in 1884 as the Nashville and Knoxville Railroad by Alexander S. Crawford. It was an attempt to open up a rail route from the coal and minerals of East Tennessee to the markets of the midstate, a service which many businessmen felt was not being adequately provided by the existing railroad companies. They also wanted to ship coal and iron ore to the Northeastern US over the Cincinnati Southern Railway, which was leased to the Southern and operated as the Cincinnati, New Orleans and Texas Pacific Railway (CNOTP), through their Cincinnati gateway. The N&K was only completed between Lebanon, where it connected to a Nashville, Chattanooga and St. Louis Railway branch from Nashville, and Standing Stone.

<span class="mw-page-title-main">Richmond and Danville Railroad</span>

The Richmond and Danville Railroad (R&D) Company was a railroad that operated independently from 1847 until 1894, first in the U.S. state of Virginia, and later on 3,300 miles (5,300 km) of track in nine states.

Nicknamed "The Hiwassee Route" for a scenic portion of the railroad along the Hiawassee River, the Atlanta, Knoxville and Northern Railway was chartered in 1896 as a successor to the Marietta and North Georgia Railway, which had entered receivership in 1891. It was part of a railroad system that ran from the community of Elizabeth near Marietta, Georgia, northward to Murphy in far western North Carolina, and to Delano just south of Etowah in southeast Tennessee.

The Augusta and Knoxville Railroad (A&K) was a railroad company that operated on 66 miles (106 km) of track between Augusta, Georgia, and Greenwood, South Carolina, from 1882 to 1886. It was merged with three other companies to form the Port Royal and Western Carolina Railway, which was reorganized in 1896 as the Charleston and Western Carolina Railway.

The Blue Ridge and Atlantic Railroad of the United States purchased the Cornelia-Tallulah Falls section of the North Eastern Rail Road in an attempt to connect Savannah, Georgia to Knoxville, Tennessee. Chartered in 1887, it went bankrupt in about 1892 and in 1898 its properties became part of the newly formed Tallulah Falls Railway.

<span class="mw-page-title-main">South Carolina Railroad</span> American railroad company (1843–1894)

The South Carolina Rail Road Company was a railroad company that operated in South Carolina from 1843 to 1894, when it was succeeded by the Southern Railway. It was formed in 1844 by the merger of the South Carolina Canal and Rail Road Company (SCC&RR) into the Louisville, Cincinnati and Charleston Railroad Company. It was built with a track gauge of 5 ft.

<span class="mw-page-title-main">Charleston and Western Carolina Railway</span>

The Charleston and Western Carolina Railway (C&WC) was formed in 1896 to operate the lines of the former Port Royal and Augusta Railway (PR&A) and the Port Royal and Western Carolina Railway (PR&WC). The PR&A and PR&WC had originally been part of the Central of Georgia Railroad but the South Carolina Legislature had forced the railroad to give up the subsidiary lines. The Atlantic Coast Line Railroad (ACL) took over the C&WC in 1897 but operated it as a subsidiary until 1959 when the ACL fully absorbed it. Much of the original system is still in use by ACL successor CSX Transportation.

Western North-Carolina Railroad Company was incorporated under act of North Carolina on February 15, 1855. Western North Carolina Railroad Company went through several slight changes in name and reorganizations before being sold at foreclosure on August 21, 1894, and conveyed to Southern Railway (U.S.) on August 22, 1894.

<span class="mw-page-title-main">East Tennessee, Virginia and Georgia Railway</span>

The East Tennessee, Virginia and Georgia Railroad (ETV&G) was a rail transport system that operated in the southeastern United States during the late 19th century. Created with the consolidation of the East Tennessee and Virginia Railroad and the East Tennessee and Georgia Railroad in 1869, the ETV&G played an important role in connecting East Tennessee and other isolated parts of Southern Appalachia with the rest of the country, and helped make Knoxville one of the region's major wholesaling centers. In 1894, the ETV&G merged with the Richmond and Danville Railroad to form the Southern Railway.

The Piedmont & Northern Railway was a heavy electric interurban company operating over two disconnected divisions in North and South Carolina. Tracks spanned 128 miles (206 km) total between the two segments, with the northern division running 24 miles (39 km) from Charlotte, to Gastonia, North Carolina, including a three-mile (5 km) spur to Belmont. The southern division main line ran 89 miles (143 km) from Greenwood to Spartanburg, South Carolina, with a 12 mi (19 km) spur to Anderson. Initially the railroad was electrified at 1500 volts DC, however, much of the electrification was abandoned when dieselisation was completed in 1954.

The Greenville and Northern Railroad was a shortline railroad formerly operating between Travelers Rest and Greenville, South Carolina, 11.3 miles (18.2 km). The railroad was part of the Pinsly Railroad Company after 1957 before being purchased by RailTex in 1997. Operations ended in February 1998 and the railroad was abandoned in 2005.

The Port Royal and Western Carolina Railway (PR&WC) was a railroad company in the southern United States that operated on 229 miles (369 km) of 4 ft 9 in gauge track. It was formed in 1886 by the merger of the Augusta and Knoxville Railroad, Greenwood, Laurens and Spartanburg Railroad, Savannah Valley Railroad and the Greenville and Laurens Railroad, which then joined with Port Royal and Augusta Railway.

The Greenwood, Laurens and Spartanburg Railroad was a South Carolina railroad company begun after Reconstruction.

The Louisville, Cincinnati and Charleston Railroad was an antebellum railroad that served the State of South Carolina and Augusta, Georgia. It was a 5 ft gauge railroad line.

The Ohio River and Charleston Railway was a Southeastern railroad that operated in the late 19th century.

The Iowa and St. Louis Railway (I&SL) was a subsidiary United States railroad operating in south-east Iowa and north-east Missouri from 1902 to 1947. For most of its existence it was part of the Chicago, Burlington and Quincy Railroad (CBQ), familiarly known as the Burlington System.

The Tampa and Jacksonville Railway was a railroad in North Central Florida in the first half of the 20th century, with a length of 56 miles (90 km) at its greatest extent. It operated under several names in the half century of its existence.

References

  1. Huff, Archie (1995). Greenville: The History of the City and County in the South Carolina Piedmont. University of South Carolina Press. p. 184. ISBN   1-57003-045-6.
  2. Interstate Commerce Commission Reports: Decisions of the Interstate Commerce Commission of the United States. Vol. 121. L.K. Strouse. 1927.
  3. Poor, Henry, ed. (1889). Poor's Manual of the Railroads of the United States. Vol. 22. p. 1029.
  4. Comer, Edward (2011). Shadows of the Past: A Focused History of Western North Carolina. Lulu.com. ISBN   0557150477.