Gros-Morne | |
---|---|
Country | Canada |
Location | Gaspé Peninsula, Quebec |
Coordinates | 49°20′N65°44′W / 49.333°N 65.733°W |
Status | Operational |
Commission date | Phase I: 2011 Phase II: 2012 |
Owner | Cartier Wind Energy |
Power generation | |
Units operational | 141 |
Make and model | GE 1,5 sle |
Nameplate capacity | 211.5MW |
The Gros-Morne Wind Farm is a large 211.5 megawatt (MW) wind farm comprising 141 1.5MW wind turbines that provides electricity to over 40,000 homes. [1] [2] It is located about 50 kilometers north-west of Gaspe, Quebec and it is owned and operated by Cartier Wind Energy. The wind farm was constructed in 2 phases, the first phase, involving 100.5 MW and 67 wind turbines, was completed on November 29, 2011. Construction of phase II involved 111MW and 74 wind turbines, and it was finalized on November 6, 2012. [3]
A wind farm or wind park, or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.
Ørsted A/S is a Danish multinational energy company. Headquartered in Fredericia, Denmark, Ørsted is the largest energy company in Denmark. The company adopted its current name on 6 November 2017. It was previously known as DONG.
The London Array is a 175-turbine 630 MW Round 2 offshore wind farm located 20 kilometres (12 mi) off the Kent coast in the outer Thames Estuary in the United Kingdom. It was the largest offshore wind farm in the world until Walney Extension reached full production in September 2018.
In 2021 France reached a total of 18,676 megawatts (MW) installed wind power capacity placing France at that time as the world's seventh largest wind power nation by installed capacity, behind the United Kingdom and Brazil and ahead of Canada and Italy. According to the IEA the yearly wind production was 20.2 TWh in 2015, representing almost 23% of the 88.4 TWh from renewable sources in France during that year. Wind provided 4.3% of the country's electricity demand in 2015.
Energy in Belgium describes energy and electricity production, consumption and import in Belgium.
The Belwind Wind Farm is located in Bligh Bank, 46 kilometres (29 mi) from the Belgian port of Zeebrugge, and has been built in two phases. It has a 330 MW production capacity and an estimated annual output of 1.1 TWh. Phase 1 had a 165 MW production capacity.
Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres (4.3 mi) off the Clacton-on-Sea coast in the Northern Thames Estuary.
GE Offshore Wind is a joint venture with Alstom and a subsidiary of GE Vernova, created in 2015 when most of Alstom's electrical power and generation assets were acquired by General Electric. GE's stake in the joint venture is 50% plus 1 share.
Alta Wind Energy Center (AWEC), also known as Mojave Wind Farm, is the third largest onshore wind energy project in the world. The Alta Wind Energy Center is a wind farm located in Tehachapi Pass of the Tehachapi Mountains, in Kern County, California. As of 2022, it is the largest wind farm in the United States, with a combined installed capacity of 1,550 MW (2,080,000 hp). The project, being developed near Tehachapi Pass Wind Farm— site of the first large-scale wind farms installed in the U.S. in the 1970s and 1980s—is "a powerful illustration of the growing size and scope of modern wind projects".
Innergex Renewable Energy Inc. is a developer, owner and operator of run-of-river hydroelectric facilities, wind energy, and solar farms in North America, France and South America. While many of the firm's operational assets are located in its home province of Québec, it has expanded into Ontario, British Columbia, and Idaho, as well as Chile and France
Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, England, in the Irish Sea. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's second largest offshore wind farm in 2018.
Teesside Wind Farm, or alternatively referred to as Redcar Wind Farm, is a 27 turbine 62 MW capacity offshore wind farm constructed just to the east of the mouth of the River Tees and 1.5 km north of Redcar off the North Yorkshire coast, in the North Sea, England.
Cartier Wind Energy is a developer, owner and operator of wind farms in Quebec. Formed in 2004 as a partnership between TransCanada Corporation (62%) and Innergex Renewable Energy (38%), the Longueuil-based company has built 5 wind farms with a combined capacity of 589.5 MW in the Gaspé peninsula delivering power under a 20-year contract signed in 2005 with Hydro-Québec. The company's sixth project, a 150-MW wind farm in Les Méchins, Quebec, was cancelled in 2010, after Cartier failed to reach an agreement with landowners.
Navitus Bay Wind Park was a proposed 970 MW Round 3 offshore wind farm, to be situated off the English coast approximately 10 km south of Dorset and the Isle of Wight. The wind farm was refused planning permission in September 2015.
The Carleton Wind Farm is a 109.5MW wind farm comprising 73 1.5MW wind turbines spread over 5,000 hectares. It began commercial operations in November 2008. It is located near Carleton-sur-Mer, Quebec, and it is owned and operated by Cartier Wind Energy.