The Hellingly Hospital Railway was a light railway owned and operated by East Sussex County Council, used for transporting coal and passengers to Hellingly Hospital, a psychiatric hospital near Hailsham, from the London, Brighton and South Coast Railway's Cuckoo Line at Hellingly railway station.

Contents

The railway was constructed in 1899 and opened to passengers on 20 July 1903, following its electrification in 1902. After the railway grouping of 1923, passenger numbers declined so significantly that the hospital authorities no longer considered passenger usage of the line to be economical, and that service was withdrawn in 1931. The railway closed to freight in 1959, following the hospital's decision to convert its coal boilers to oil, which rendered the railway unnecessary.

The route took a mostly direct path from a junction immediately south of Hellingly Station, past Farm and Park House Sidings, stopping places to load and unload produce and supplies from outbuildings of the hospital. Much of the railway has been converted to footpath, and many of the buildings formerly served by the line are now abandoned.

Construction and opening

Hellingly Station in the early 20th century, showing the wooden platform before it was shortened Hellingly Railway Station.jpg
Hellingly Station in the early 20th century, showing the wooden platform before it was shortened

In 1897, East Sussex County Council purchased 400 acres (160 ha) of land at Park Farm, about three miles (5 km) north of Hailsham, from the Earl of Chichester, to be the site of a new county lunatic asylum that became Hellingly Hospital. [lower-roman 1] Construction work on the hospital began in 1900, to the design of George Thomas Hine, [1] who had designed the nearby Haywards Heath Asylum. [2] Building materials were transported to the site by a 1+14 mile (2 km) standard gauge private siding from the goods yard at Hellingly railway station on the Cuckoo Line. The connection was built by the asylum's builders, Joseph Howe & Company, and was authorised by the London, Brighton and South Coast Railway (LBSCR) on condition that East Sussex Council paid the cost, estimated at £1,700. [3]

A small wooden platform was built at Hellingly railway station, opposite the main line platform. This had no connection to the station buildings and was used only for the transfer of passengers between main-line and hospital trains, and kept chained off when not in use. [4] Coal yards and sidings were also built at Hellingly station. The hospital opened to patients, and the railway to passengers, on 20 July 1903. [5]

Route

Route of the Hellingly Hospital Railway Hellingly railway route.png
Route of the Hellingly Hospital Railway

The railway left the Cuckoo Line at Hellingly Station. Although the railway joined the Cuckoo Line at both the northern and southern ends of the platform, virtually no through trains ran. Due to the arrangement of the lines at the junction with the Cuckoo Line, passenger trains to and from the hospital reversed south of Hellingly station. [6]

After leaving the main line immediately south of Hellingly, the railway passed over gated level crossings at Park Road and New Road. Farm Siding, a single siding on the west of the line beyond the crossings, was a collection point for the farm's agricultural produce in the early years of the railway, but later fell out of use. [6] The line climbed most of the way from here to the hospital at 1 in 50. [7] About halfway between Hellingly and the hospital the line entered the hospital grounds, passing to the west of Park House Siding, which served the hospital's Park House annexe.

As it approached the hospital, the line split; the southern fork led to a siding to the north-west of the hospital, while the other turned sharply east and south through almost 180° before splitting again. One fork ran into a large workshop and the other led to a short platform, which was initially used for passengers. Following the suspension of passenger services it was converted into a coal dock. [8]

The line had no signals or automatic points to control the switching between lines at junctions with the main line and with the sidings. On the approach to a level crossing the fireman ran ahead with a red flag, to stop the traffic; he also manually operated the points. [9]

Motive power

Joseph Howe & Company used an 0-4-0 saddle tank locomotive to transport building materials during the hospital's construction. The locomotive was purchased new in 1900, and sold in 1903 following the completion of the hospital and electrification of the line. [10]

In 1902, the decision was taken to electrify the railway using power generated from the hospital's own power plant, the line was electrified at 500 V DC using a single overhead line. [6] The power plant (to generate the electricity for the hospital and railway) was the creation of Messrs Spagnoletti & Co (of London). [11] James E. Spagnoletti was the son of Charles Spagnoletti who was a consulting electrical engineer to both electric railways and the London Electric Omnibus Company. James was first employed on the railways, but created his own company building electricity generation plant. Messrs Spagnoletti had, therefore, the combination of experience to integrate power generation for the electric railway with the domestic generating capacity for the mental hospital.

The hospital was also connected to the local 11 kV electricity distribution system.

Engineers Robert W. Blackwell & Co provided a small 0-4-0 electric locomotive capable of pulling two loaded coal wagons. It is not known where the locomotive was manufactured, as the company has no record, but the design of the controls suggests that it may have been imported from Germany. [12] A small railcar/tramcar made by Brush Engineering Company with space for 12 passengers was also provided. The locomotive and the railcar were each fitted with a single trolley pole to collect electricity from the overhead wire. [13] The passenger car was used for the duration of passenger services on the line, and the locomotive from the electrification of the line until closure in 1959. At that time, it was the oldest operational electric locomotive in the British Isles. [6] [14]

Operations

Layout of LBSCR (dotted) and HHR (solid) lines and platforms at Hellingly station Hellingly station layout.png
Layout of LBSCR (dotted) and HHR (solid) lines and platforms at Hellingly station

At the railway grouping of 1923, the LBSCR became part of the Southern Railway and the agreements between the hospital (renamed the East Sussex Mental Hospital in 1919) and the LBSCR were updated. The wooden platform at Hellingly station was drastically shortened in 1922. [15] Because service levels depended on patient numbers and the hospital's coal and food requirements, the line never operated to a timetable. [6] By 1931, passenger numbers had fallen to such an extent that the hospital authorities no longer considered passenger usage of the line to be economical, and the passenger service was withdrawn. The passenger car was moved to the hospital grounds, fitted with an awning, and became the hospital's sports pavilion. [16] surviving into the mid-1990s before being destroyed in a fire started by vandals. The wooden platform at Hellingly station was removed in 1932, [17] and the platform at the hospital was converted into a coal bay. [8]

There were only two minor accidents: a car that collided with the locomotive whilst driving through the hospital grounds, and a wagon whose brakes failed whilst stabled at Farm Siding, which rolled down the line to Hellingly station. [18]

On 22 November 1939, plans were put in place for the restoration of passenger services to allow ambulance trains to reach the hospital, and authorisation was given for their operation. However, the line was never used to transport patients, as although Park House was used as a hospital by the Canadian Army during the Second World War, patients left ambulance trains at Hellingly station and were transferred to Park House by road. [15]

Closure

In the late 1950s, the hospital, under the control of the Hailsham Hospitals Management Committee since the 1948 establishment of the National Health Service, decided to convert its boilers from coal to oil. The railway was therefore no longer needed to transport coal; the last load was delivered on 10 March 1959, and the empty coal wagon returned to Hellingly on 25 March 1959. [19] [20]

Under the terms of the agreement between the hospital authorities, the LBSCR, and its successors, the hospital authorities were obliged to keep the railway in good repair to allow its use by main-line wagons. With a greatly reduced need for goods traffic to the hospital following the conversion of the boilers, it was decided that the railway was not worth the expense of continued maintenance and necessary upgrading, and the line was officially closed on 25 March 1959 following the departure of the last coal wagon. [20]

The line was used for occasional excursions by railway enthusiasts for a short period after official closure, using the electric locomotive and a brake van borrowed from British Railways. [6] The exact date of the last run is not recorded; the last recorded use of the line was an excursion organised by the Norbury Transport and Model Railway Club on 4 April 1959, but it is known that later excursions ran. [20] In the early 1960s a railway society in Yorkshire proposed to buy the track as a preserved railway. However, as the psychiatric hospital was still open the request was not considered practical, [20] and the track was lifted in the early 1960s. The fittings and locomotive were disposed of by H.Ripley and Sons of Hailsham. [6]

Present day

Hellingly station, 2008 Hellingly railway station in 2008.jpg
Hellingly station, 2008

The Cuckoo Line closed shortly after the Hospital Railway. Hellingly station closed to passengers on 14 June 1965, and the line closed for goods traffic on 26 April 1968. The station building complete with platform is now a private residence, and the Cuckoo Line trackbed was converted to the Cuckoo Trail long-distance footpath in 1990. [21] Much of the route of the Hospital Railway is also now a footpath. [22]

Traces of the railway can still be seen, including a cast iron pole that supported the overhead wire, the remains of the engine shed (burnt down in 2004), and a short section of track. [23] [24] Hellingly Hospital is now closed [25] Approval for redevelopment as a housing complex was obtained in 2009. [1] [26]

See also

Related Research Articles

<span class="mw-page-title-main">Southern Railway (UK)</span> British "Big 4" railway company, active 1923–1947

The Southern Railway (SR), sometimes shortened to 'Southern', was a British railway company established in the 1923 Grouping. It linked London with the Channel ports, South West England, South coast resorts and Kent. The railway was formed by the amalgamation of several smaller railway companies, the largest of which were the London and South Western Railway (LSWR), the London, Brighton and South Coast Railway (LB&SCR) and the South Eastern and Chatham Railway (SE&CR). The construction of what was to become the Southern Railway began in 1838 with the opening of the London and Southampton Railway, which was renamed the London & South Western Railway.

<span class="mw-page-title-main">London, Brighton and South Coast Railway</span> British pre-grouping railway company

The London, Brighton and South Coast Railway was a railway company in the United Kingdom from 1846 to 1922. Its territory formed a rough triangle, with London at its apex, practically the whole coastline of Sussex as its base, and a large part of Surrey. It was bounded on its western side by the London and South Western Railway (L&SWR), which provided an alternative route to Portsmouth. On its eastern side the LB&SCR was bounded by the South Eastern Railway (SER)—later one component of the South Eastern and Chatham Railway (SE&CR)—which provided an alternative route to Bexhill, St Leonards-on-Sea, and Hastings. The LB&SCR had the most direct routes from London to the south coast seaside resorts of Brighton, Eastbourne, Worthing, Littlehampton and Bognor Regis, and to the ports of Newhaven and Shoreham-by-Sea. It served the inland towns and cities of Chichester, Horsham, East Grinstead and Lewes, and jointly served Croydon, Tunbridge Wells, Dorking and Guildford. At the London end was a complicated suburban and outer-suburban network of lines emanating from London Bridge and Victoria, and shared interests in two cross-London lines.

<span class="mw-page-title-main">Hailsham</span> Town in East Sussex, England

Hailsham is a town, a civil parish and the administrative centre of the Wealden district of East Sussex, England. It is mentioned in the Domesday Book, where it is called Hamelesham. In one part yet, mentioned in other part of the same book as ‘’’Tilux’’’, the land of Ricard de Tunbrige. The town of Hailsham has a history of industry and agriculture.

<span class="mw-page-title-main">Coulsdon North railway station</span> Former railway station in England

Coulsdon North is a closed railway station that served Coulsdon, Croydon, England, on the Brighton Main Line.

<span class="mw-page-title-main">East Coastway line</span> Railway line in Sussex, England

The East Coastway line is a railway line along the south coast of Sussex to the east of Brighton, England. Trains to the west of Brighton operate on the West Coastway line. Together with the West Coastway and the Marshlink line to the east, the line forms part of a continuous route from Havant to Ashford. The Brighton Main Line route to Eastbourne and Hastings, via Plumpton and Cooksbridge, shares the East Coastway line east of Lewes station.

<span class="mw-page-title-main">Polegate railway station</span> Railway station in East Sussex, England

Polegate railway station serves Polegate in East Sussex, England. It is on the East Coastway Line, 61 miles 39 chains (99.0 km) from London Bridge, and train services are provided by Southern.

<span class="mw-page-title-main">LB&SCR E4 class</span>

The London, Brighton and South Coast Railway E4 class is a class of 0-6-2T side tank steam locomotive designed by Robert Billinton. They were introduced in 1897 and were essentially a larger version of the E3 Class. The cylinder diameter was reduced from 18 to 17.5 inches by the Southern Railway.

<span class="mw-page-title-main">Tunbridge Wells West railway station</span> Station in Kent, England

Tunbridge Wells West is a railway station located in Royal Tunbridge Wells, Kent. It is one of two railway stations in Tunbridge Wells constructed by rival companies. The other, Tunbridge Wells Central was opened in 1845 by the South Eastern Railway (SER). Tunbridge Wells West was closed to mainline passenger services in 1985, but part of it still remains as a heritage railway line. Opened in 1996, it stands next to the original engine shed. The line is called the Spa Valley Railway.

The Horton Light Railway had its origins in a contractor's line built in 1905 to transport building materials, coal and other supplies for London County Council's Epsom Cluster of psychiatric hospitals in the Horton area to the North-West of the town of Epsom. The Light Railway Order did not permit the carriage of passengers. The railway connected with the mainline network just south of Ewell West railway station.

<span class="mw-page-title-main">Hellingly railway station</span>

Hellingly was a railway station on the now closed Polegate to Eridge line in East Sussex. It served the village of Hellingly.

<span class="mw-page-title-main">Groombridge railway station</span> Station in East Sussex, England

Groombridge railway station is a station on the Spa Valley Railway (SVR) in Groombridge, East Sussex, England. Once a busy station serving four directions, it closed in 1985 to British Rail services. A new station the other side of Station Road bridge was opened by the SVR in 1997 as part of a standard gauge heritage railway to Tunbridge Wells West.

The Midhurst Railways were three branch lines which were built to serve the market town of Midhurst in the English county of West Sussex. The three lines were the Petersfield Railway, from Petersfield; the Mid-Sussex Railway extended by the Mid-Sussex and Midhurst Junction Railway, from Hardham Junction (Pulborough); and from Chichester. The Petersfield Railway opened in 1864, the promoting company having been absorbed by the London and South Western Railway (LSWR) in 1863. The Mid-Sussex lines reached Midhurst in 1866, after being absorbed by the London, Brighton and South Coast Railway (LBSCR) in 1862. The two lines did not connect, and there were two separate stations close by one another. The Chichester line took much longer to complete, and was opened in 1881, and a new LBSCR station was opened, replacing the first station. In 1925 the former LSWR line was connected to that station.

The Cuckoo Line is an informal name for the now defunct railway service which linked Polegate and Eridge in East Sussex, England, from 1880 to 1968. It was nicknamed the Cuckoo Line by drivers, from a tradition observed at the annual fair at Heathfield, a station on the route. At the fair, which was held each April, a lady would release a cuckoo from a basket, it being supposedly the 'first cuckoo of spring'. The railway line served the following Sussex communities: Polegate, Hailsham, Hellingly, Horam for Waldron, Heathfield, Mayfield, Rotherfield and Eridge. Services continued through Eridge and onward via Groombridge to Tunbridge Wells.

The Whittingham Hospital Railway (W.H.R.) was a private light railway operated by Lancashire County Council to serve Whittingham lunatic asylum. Opened in 1889, it carried goods and passengers between Grimsargh on the Preston and Longridge Railway and the hospital grounds. It closed to all traffic in 1957.

<span class="mw-page-title-main">Hawkhurst branch line</span> Railway in Kent, England

The Hawkhurst branch line was a short railway line in Kent that connected Hawkhurst, Cranbrook, Goudhurst and Horsmonden with the town of Paddock Wood and the South Eastern and Medway Valley lines, a distance of 11 miles 24 chains.

The Cranleigh line was a railway line in England that connected Guildford in Surrey, with Horsham in West Sussex. Construction of the line was started by an independent company, the Horsham and Guildford Direct Railway, but management failures delayed construction, and the company was taken over by the London, Brighton and South Coast Railway (LBSCR). The LBSCR completed the construction of the line and it was opened in 1865; it was nearly 16 miles in length.

<span class="mw-page-title-main">Whitstable Harbour railway station</span> Disused railway station in Kent

Whitstable Harbour railway station was the name of two disused railway stations serving Whitstable the terminus of the Canterbury and Whitstable Railway. The station opened in 1830. It was extended in the mid-1870s and resited in 1895. The Canterbury and Whitstable line closed to passengers in 1931 and freight in 1952, although it was reopened for a month following the North Sea flood of 1953.

<span class="mw-page-title-main">Hellingly Hospital</span> Psychiatric hospital in Sussex, England

Hellingly Hospital, formerly the East Sussex County Asylum, was a large psychiatric hospital close to the village of Hellingly, east of Hailsham, in the English county of East Sussex.

The Brill Tramway, also known as the Quainton Tramway, Wotton Tramway, Oxford & Aylesbury Tramroad and Metropolitan Railway Brill Branch, was a six-mile (10 km) rail line in the Aylesbury Vale, Buckinghamshire, England. It was privately built in 1871 by the 3rd Duke of Buckingham as a horse tram line to transport goods between his lands around Wotton House and the national railway network. Lobbying from residents of the nearby town of Brill led to the line's extension to Brill and conversion to passenger use in early 1872. Two locomotives were bought for the line, but as it had been designed and built with horses in mind, services were very slow; trains travelled at an average speed of only 4 miles per hour (6.4 km/h).

The St Edward's Hospital tramway was a tramway built for Staffordshire County Council for the construction of the St Edward's County Mental Asylum at Cheddleton, Staffordshire. Opened in 1899, the line ran until 1954 before being closed and scrapped.

References

  1. Reflecting changing attitudes to, and terminology within, the field of psychiatric medicine, the hospital went through multiple renamings in its lifetime. Known as the County Lunatic Asylum prior to opening, it was opened in 1903 as the East Sussex County Asylum. On 28 June 1919 it was renamed the East Sussex Mental Hospital. Following the nationalisation of the health service in 1948, the formal name gradually declined in usage, and by the time of the closure of the main hospital building in 1990 it was always referred to as Hellingly Hospital. The name "Hellingly Hospital" was used informally (and in semi-official material such as staff publications) throughout the existence of the hospital, and the railway line was known as the "Hellingly Hospital Railway" from the outset.

Notes

  1. 1 2 Ryan, Siobhan (7 February 2007). "Former asylum to be converted to flats". The Argus. Retrieved on 20 June 2008.
  2. Harding 1989 , p. 4
  3. Elliott 1988 , p. 47
  4. Mitchell & Smith 1986 , § 72
  5. Harding 1989 , p. 6
  6. 1 2 3 4 5 6 7 Stones, H.R. (December 1957). "The Hellingly Hospital Railway" (PDF). Railway Magazine. 103 (680): 869–872. Archived from the original (PDF) on 5 February 2009. Retrieved on 29 May 2008.
  7. Railway Magazine December 1950 pp. 869-873 H. R. Stones The Hellingly Hospital Railway
  8. 1 2 Harding 1989 , p. 16
  9. Harding 1989 , p. 23
  10. Harding 1989 , p. 5
  11. "The County's New Mental Sanatorium". Eastbourne Chronicle. Sussex. 30 May 1903. p. 8.
  12. Mitchell & Smith 1986 , § 74
  13. Mitchell & Smith 1986 , § 73
  14. Elliott 1988 , p. 53
  15. 1 2 Harding 1989 , p. 10
  16. Harding 1989 , p. 21
  17. Mitchell & Smith 1986 , § 76
  18. Harding 1989 , p. 24
  19. Harding 1989 , p. 11
  20. 1 2 3 4 Harding 1989 , p. 25
  21. "The Cuckoo Trail" (PDF). East Sussex County Council. Archived from the original (PDF) on 23 October 2007. Retrieved 6 June 2008.
  22. "Hellingly Walk" (PDF). East Sussex County Council. 2005. Archived from the original (PDF) on 5 February 2009. Retrieved 6 June 2008.
  23. Harding 1989 , p. 28
  24. Catford, Nick (1995). "Disused Stations Site Record: Hellingly Hospital Railway". Subterranea Britannica. Retrieved 6 June 2008.
  25. "Wealden Local Plan: Hellingly Hospital" (PDF). Wealden District Council. December 1998. Retrieved 14 January 2009.
  26. "Planning Application Display - WD/2008/0220/MRM". Wealden Council. 19 February 2009. Retrieved 21 February 2012.

Bibliography

  • Elliott, A.C. (1988). The Cuckoo Line. Didcot, Oxon: Wild Swan Publications. ISBN   0-906867-63-0.
  • Harding, Peter A. (1989). The Hellingly Hospital Railway. Woking: Peter A. Harding. ISBN   0-9509414-5-X.
  • Mitchell, Vic; Smith, Keith (1986). Branch Lines to Tunbridge Wells from Oxted, Lewes and Polegate. Midhurst: Middleton Press. ISBN   0-906520-32-0.
Listen to this article (12 minutes)
noicon
Sound-icon.svg
This audio file was created from a revision of this article dated 19 March 2009 (2009-03-19), and does not reflect subsequent edits.

Coordinates: 50°53′16″N0°15′37″E / 50.88778°N 0.26028°E / 50.88778; 0.26028