The Higham Ferrers branch line was a short railway branch built in Northamptonshire, England, by the Midland Railway to serve the industrial towns of Rushden and Higham Ferrers. It was originally intended to continue the line to Raunds, but that was frustrated by the refusal of a landowner to release his land.
The line opened in 1893 for goods traffic and 1894 for passengers. For some time a thriving passenger and goods business developed, helping the towns to expand. The passenger service operated as a shuttle to and from Wellingborough. As road transport became practical in the 1930s and subsequently, the usage of the line declined, although heavy mineral traffic remained buoyant. Nevertheless the line was closed to passenger operation in 1959, although some factories' holiday special trains ran annually after that. Goods and mineral traffic ended in 1969.
The station site at Rushden has been acquired by a heritage railway group.
Higham Ferrers is an old market town, but like the adjacent town of Rushden it was by-passed by main line railways. Both towns were heavily engaged in the footwear industry, and by the second half of the nineteenth century, an industrialised town without convenient railway transport was at a clear competitive disadvantage.
The first railway nearby was the Northampton and Peterborough Railway, promoted by the London and Birmingham Railway and opened in 1845. [1] It had a station named Higham Ferrers, but it was over a mile from Higham Ferrers and three miles from Rushden. It was later renamed Irthlingborough.
The Midland Railway opened its north-south main line in 1857 and provided a station at Irchester; this too was inconvenient and distant, although it was nearer Rushden. [2] [3]
Local business interests saw that their towns were at a disadvantage in not having direct railway access; moreover the transport of coal and other heavy supplies added considerably to their cost. Repeated requests were made to the Midland Railway to build a branch line. This the Midland Railway were reluctant to do; they had priorities elsewhere at the time, and experience had shown that short rural branch lines did not pay. Moreover the Midland Railway main line in the area was heavily congested, in particular due to the heavy volume of coal traffic being carried.
The Midland main line was quadrupled (making four tracks) in a project that was completed in December 1883. This provided considerable relief to the problem of congestion on the main line. [3]
After continued persistent requests from local interests the Midland Railway agreed to make a branch line; this was authorised as a double track line in 1890. It was referred to as the Irchester and Raunds Branch: the Midland Railway's intention was to make it from a junction south of Wellingborough on the main line, through Rushden and Higham Ferrers, continuing to Raunds and making a junction at Raunds station on its Kettering to Huntingdon line, [3] which had opened in 1866 [4] Raunds station was more than two miles from the town it purported to serve. [5]
Construction started in 1892. Useful iron ore deposits were available near the junction with the main line, and some months prior to the branch opening fully, from 3 July 1893, [4] some train movements took place on the stub of the branch to remove the mineral. [3]
The line was completed as far as Higham Ferrers, and goods traffic started operation on 1 September 1893. Passenger train operation followed on 1 May 1894, in both cases as far as Higham Ferrers only, a distance of 3+1⁄2 miles. The intended continuation to Raunds was abandoned, because the owner of lands required for the line made such obstruction to the sale of his property, and the Midland Railway did not proceed with construction beyond Higham Ferrers. The intended double track was also not proceeded with, and the branch was single track only. [2] [3] [6] [7]
There was no station at Irchester Junction on the four-track Midland Railway main line, where the branch connected with the Slow Lines only; the location was immediately south of the River Nene bridge. The train service ran from Higham Ferrers to Wellingborough, consisting of six trains each way at first, increasing to ten by 1901. [2] <Peter Butler, A History of the Railways of Northamptonshire Pages 94 to 97> The arrival of the railway encouraged development in both Higham Ferrers and Rushden, and populations increased, but Rushden started with a larger population and maintained that advantage. [2]
The concentration in Rushden of large industrial employers in a town of moderate size encouraged co-ordinated annual holiday breaks and in 1934, one of Rushden’s leading shoe manufacturers chartered three special trains to take more than 1,000 employees and their families to Brighton for the day. These works specials continued after World War II. [3]
Wellingborough was the local main commercial town locally, but the station in Wellingborough is not conveniently sited for the town, and when local bus services became available in the 1930s and afterwards, passenger usage on the branch declined steeply.
In the summer of 1952 British Railways started a through service from Higham Ferrers to Leicester. This brought the sight of a large passenger locomotive with a long train on the branch on a regular basis. However the through train did not work back to Higham Ferrers; passengers had to return on the ordinary service trains and change at Wellingborough.
Then in 1954 the usual steam-worked branch train was replaced by a three-coach diesel multiple unit, but this seems to have been unsuccessful and steam operation was reinstated. [3]
It became unsustainable to continue with passenger operation in the face of road competition, and the passenger service was discontinued on 15 June 1959. [6] [2]
Factories continued to charter special trains for workers' summer holidays, to Blackpool and Great Yarmouth on Saturdays in the town's holiday fortnight, and this arrangement continued until 1964. General goods traffic operated until 3 February 1969. Iron ore concentrate had been a local specialised traffic but that too ceased on 3 November 1969. [2] [3]
A significant factor in the downturn of the branch line economics was the conversion of domestic gas to natural gas in 1968, meaning that the town gas works no longer required deliveries of coal. [8]
After closure part of the route at Rushden was acquired by an enthusiasts' group; it now operates as a heritage railway called "The Rushden, Higham and Wellingborough Railway". In 2022 its website states that it "presently has 1⁄2 mile of track". [9]
Northamptonshire is a ceremonial county in the East Midlands of England. It is bordered by Leicestershire, Rutland and Lincolnshire to the north, Cambridgeshire to the east, Bedfordshire, Buckinghamshire, Oxfordshire to the south and Warwickshire to the west. Northampton is the largest settlement and the county town.
The Midland Main Line (MML), sometimes also spelt Midland Mainline, is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.
Wellingborough is a market town and civil parish in the North Northamptonshire unitary authority area of Northamptonshire, England. It is 65 miles (105 km) from London and 11 miles (18 km) from Northampton, and is on the north side of the River Nene.
Raunds is a market town in North Northamptonshire, England. It had a population of 9,379 at the 2021 census.
Rushden is a town and civil parish in North Northamptonshire, England, around 18 miles (29 km) east of Northampton. The parish is on the border with Bedfordshire, 12 miles (19 km) north of Bedford.
East Northamptonshire was a local government district in Northamptonshire, England, from 1974 to 2021. Its council was based in Thrapston and Rushden. Other towns included Oundle, Raunds, Irthlingborough and Higham Ferrers. The town of Rushden was by far the largest settlement in the district. The population of the district at the 2011 Census was 86,765.
The A45 is a major road in England. It runs east from Birmingham past the National Exhibition Centre and the M42, then bypasses Coventry and Rugby, where it briefly merges with the M45 until it continues to Daventry. It then heads to Northampton and Wellingborough before running north of Rushden and Higham Ferrers and terminating at its junction with the A14 in Thrapston.
Wellingborough and Rushden is a constituency in Northamptonshire represented in the House of Commons of the UK Parliament. The seat is currently held by Labour MP Gen Kitchen, after the recall of MP Peter Bone in December 2023 which resulted in a by-election in February 2024.
Wellingborough railway station is a Grade II listed station located in the market town of Wellingborough in Northamptonshire, England. It lies on the Midland Main Line and is 65 miles (104 km) from London St. Pancras. The station is operated by East Midlands Railway, which is also the primary operator serving the station with passenger services under the Luton Airport Express brand.
Irchester is a village and civil parish in North Northamptonshire, two miles (3 km) south-east of Wellingborough and two miles south-west of Rushden. The population of the village at the 2011 Census was 5,706 and estimated in 2019 at 5,767. Little Irchester and Knuston also lie in the parish.
Higham Ferrers is a former railway station on the Higham Ferrers branch line from Wellingborough. It served the market town of Higham Ferrers, Northamptonshire, England.
North Northamptonshire is one of two local government districts in Northamptonshire, England. Its council is a unitary authority, being a district council which also performs the functions of a county council. It was created in 2021. The council is based in Corby, the district's largest town. Other notable towns are Kettering, Wellingborough, Rushden, Raunds, Desborough, Rothwell, Irthlingborough, Thrapston and Oundle.
Wellingborough London Road railway station is a former railway station in Wellingborough, Northamptonshire on a line which connected Peterborough and Northampton.
Glendon and Rushton railway station is a Grade II listed former railway station in Rushton, Northamptonshire.
The Northampton and Peterborough Railway was an early railway promoted by the London and Birmingham Railway (L&BR) to run from a junction at Blisworth on the L&BR main line to Northampton and Peterborough, in England. The construction of the line was authorised by Parliament in 1843 and the 47 mile line opened in 1845. The line largely followed the river Nene, and for the economy of construction, it had many level crossings with intersecting roads, rather than bridges. In 1846 the L&BR joined with other companies, together forming the London and North Western Railway (LNWR).
Rushden Parkway railway station is a proposed new railway station to serve the village of Irchester in Northamptonshire, England. It would also serve the nearby towns of Higham Ferrers and Rushden.
The Kettering, Thrapston and Huntingdon Railway was an English railway line opened throughout in 1866. It connected the Midland Railway main line at Kettering to ironstone deposits to the south-east of the town, as well as opening up the agricultural district around Thrapston and reaching the regional centre of Huntingdon. The hoped-for expansion of agricultural was limited and local traffic did not develop; at the same time the difficult alignment and gradients of the line discouraged heavy use as a through line. A basic passenger service operated through from Kettering to Cambridge, by using running powers east of Huntingdon via St Ives.
Rail transport in Northamptonsire is part of the national rail network of Great Britain. Rail transport in Northamptonshire began in the 19th century and there were many different railway companies. There used to be 92 railway stations in Northamptonshire, today there are only 6: Kings Sutton, Long Buckby, Northampton, Kettering, Wellingborough, and Corby.