Northampton–Peterborough line |
---|
The Northampton and Peterborough Railway was an early railway promoted by the London and Birmingham Railway (L&BR) to run from a junction at Blisworth on the L&BR main line to Northampton and Peterborough, in England. The construction of the line was authorised by Parliament in 1843 and the 47 mile line opened in 1845. The line largely followed the river Nene, and for the economy of construction, it had many level crossings with intersecting roads, rather than bridges. In 1846 the L&BR joined with other companies, together forming the London and North Western Railway (LNWR).
The line ran through largely agricultural terrain, and it never developed as much as later, neighbouring main line railways. It closed to ordinary passenger traffic in 1964, and closed completely in 1972. A part of it has since been reopened as the Nene Valley Railway heritage line.
The London and Birmingham Railway (L&BR) opened its main line on 17 September 1838, passing from Roade to Rugby to the west of Northampton. [1] [2] The people of Northampton saw that they were at a commercial and economic disadvantage not having a railway station in their town, and following a public meeting on 8 March 1838, [3] they petitioned the L&BR to provide a branch line to their town. After consideration the L&BR considered that a branch line from Blisworth to Northampton and Peterborough would be advantageous, by connecting Peterborough into their system, as well as the intervening agricultural terrain. Peterborough was an important and expanding regional centre, although the route from London via Blisworth would be very circuitous. At this early date the advantages of having a railway connection were so considerable, that few reflected on the lengthy and roundabout route. [3] [4]
London and Birmingham Railway (Northampton and Peterborough Branch) Act 1843 | |
---|---|
Act of Parliament | |
Long title | An Act for making a Branch Railway from the London and Birmingham Railway to Northampton and Peterborough. |
Citation | 6 & 7 Vict. c. lxiv |
Dates | |
Royal assent | 4 July 1843 |
Other legislation | |
Repealed by | |
Status: Repealed | |
Text of statute as originally enacted |
The proposal for the branch line went to the 1843 session of Parliament and the London and Birmingham Railway (Northampton and Peterborough Branch) Act 1843 (6 & 7 Vict. c. lxiv) was passed on 4 July 1843. [5] Robert Stephenson was the engineer of the line; work started in March 1844. The line was to leave the L&BR main line at Blisworth and descend considerably to Northampton. After that the line was to follow the River Nene on an easy alignment all the way to Peterborough. Stephenson's design involved 26 level crossings, 13 river bridges and a short tunnel at Wansford. [6] [4]
At the same time the Eastern Counties Railway was building a branch line from Ely to Peterborough. The Great Northern Railway had not yet been formed so the possibility of a station on a north–south axis was not pursued; the ECR and the L&BR discussed building a joint station, but the ECR turned this idea down. Instead it would build a Peterborough station (and an extension of the line for 600 yards beyond it) and allow the L&BR to use it. [7]
The L&BR opened its line from Blisworth to Northampton on 13 May 1845. On 31 May an inspection trip throughout the line was made by the directors; and the line to Peterborough was opened to the public on 2 June 1845. [8] [6] [9] It was the first railway in Peterborough. At 47 miles in length, it had cost £429,409 to build. [10] [5] As the ECR had not yet opened its line, the L&BR alone was using the ECR station. These openings were for passenger traffic only; goods trains started running on 15 December 1845. [5] Conveyance of cattle to London and other population centres was an important traffic; coal brought in was also a significant business.
Blisworth station had been built as a simple wayside station and was unsuitable as an important junction, and inconveniently located. (It was at the point where the line crosses the A43 road.) [11] A new larger Blisworth station was built about half a mile further north-west, at the point of junction.
Many of the intermediate stations were built in an Old English or Tudor style from local limestone. [12]
The Syston and Peterborough Railway, a dependency of the Midland Railway, was under construction at this period. There was serious difficulty with getting land for the line in the central area, and the company opened a detached section from Stamford to Peterborough. It too did not have its own station at Peterborough, and as it was remote from its parent company, it arranged that the L&BR. [13] ) would work its trains, and to use the ECR station. For a short period there was a passenger service from Ely to Stamford.
In July 1846 the L&BR was absorbed into the London and North Western Railway. [14] Typical passenger services on the line were five trains each way, with additional shuttle services between Blisworth and Northampton. [15] When the line was opened, it was double track from Blisworth to Northampton, and the remainder was single line with a passing place at Thrapston, about halfway. The original intention had been to operate these two halves as one-train-only sections, but this proved impractical. In fact the entire route was formed for double track, and this provision was actually started immediately after opening, and was ready by September 1846. [9]
Although iron ore was known to exist along the course of the line, its extent was not fully understood at first. Colonel Arbuthnot of Woodford displayed specimens of Northamptonshire iron ore at the Great Exhibition, and some early quarrying was carried out in the Blisworth and Heyford area from 1852. New pits near Hardingstone were linked to the line by a tramway in 1851. Tramways or sidings were later laid to connect with the LNWR at Gayton, Duston, Dallington, Heyford, Brixworth, Lamport, Whiston, Earls Barton, Irchester, Irthlingborough, Ditchford, Ringstead, Denford and Orton, and transhipment sidings were laid at Blisworth Station to deal with ironstone brought in by canal from local pits. [16]
The Northampton to Peterborough line was the first railway through the territory that it penetrated. Naturally later railways either crossed it or made junctions with it.
As described above, the line used the Eastern Counties Railway (ECR) station at Peterborough at first, and in fact was the only railway in the area. The ECR completed its line from the east there the following year, 1846, [17] joined by the Midland Railway line from Stamford later the same year. [18]
The Great Northern Railway made its line to and through Peterborough in 1850. [19]
The Stamford and Essendine Railway, an affiliate of the GNR, had a branch to Stamford from the GNR main line, and in 1867 it opened an extension joining the Northampton – Peterborough line at Wansford. It was contemplated that this would be the starting point for a long-distance line, but that idea came to nothing. The connection at Wansford was actually suspended from 1870 to 1879, and the Stamford line used its own station short of the junction. Matters were resolved and the connection was made again from 1879. Nevertheless, that line was never successful and it closed in 1931. [20] [21]
The LNWR itself made a branch line from Wansford to Seaton and beyond to Market Harborough, opening in 1879. This was more successful than the S&ER line, but closed in 1968. [22]
At Thrapston the line was crossed by the Kettering, Thrapston and Huntingdon Railway, which opened in 1866. It was a dependency of the Midland Railway, and was absorbed by that company in 1897. It made no connection with the Northampton and Peterborough line, and had its own separate Thrapston station. [23]
The N&P line had a Higham Ferrers station, although it was inconveniently located and some distance from the town. The people of Higham Ferrers and Rushden pressed for a better station location, and it was the Midland Railway that provided it, the Higham Ferrers branch line, opened in 1893. The LNWR eventually conceded the reality of the location of their own "Higham Ferrers" station and renamed it Irthlingborough in 1910. Even so, the stations were not well sited for Rushden and Higham Ferrers, and their location on a branch line from Wellingborough made them unpopular for passenger journeys. That branch closed to passengers in 1959, and completely in 1969. [24]
The Midland Railway main line referred to crossed over the N&P line to the east of Wellingborough; it opened in 1857, and a spur connection trailed into the N&P line from it, opened in 1859. [25] It was closed in 1966.
Approaching Northampton the Midland Railway Bedford branch ran in from the south-east and crossed over the N&P line, running alongside it on the north side to Hardingstone Junction, and then diverging to a Northampton terminus, called St John's Street from 1924. This was a well-sited central station for the town, but it was inconvenient from the railway operational point of view and it was closed by the LMS railway in 1939. The Bedford line closed in 1968, but a Works remained in existence until 1988, and was served by a stub of the branch. When the main part of the N&P line closed, a connection was retained from Northampton Castle station and the Duston curve.
There was a triangular junction at Duston leading northwards to Northampton Castle station, which was built on the Northampton Loop, a north–south connection off the Birmingham main line, giving Northampton a service on that axis. It opened in 1859 and the Duston West Curve was provided then; it closed in 1969; the east curve was opened in 1879 and continued until 1988. [26]
The LNWR experimented with internal combustion engine railcars, and acquired at least one for trials. They were self-contained, and had two 105 hp Daimler petrol engines, driving the inner axle on each bogie through a Cardan shaft. The photograph looks posed, and it is not known whether the vehicle entered commercial service on the line. [27]
The line was closed on 2 May 1964, except for the stub from Peterborough to Oundle which was retained as a freight-only service, mostly for house coal. Special trains to and from Oundle School, a boarding school, operated until 1972, when the line closed completely. [28] [29]
A 7.5-mile (12.1 km) long stretch of the Northampton and Peterborough Railway has been reopened as the heritage Nene Valley Railway. [31]
The Nene Valley Railway (NVR) is a preserved railway in Cambridgeshire, England, running between Peterborough Nene Valley and Yarwell Junction. The line is 7+1⁄2 miles (12.1 km) in length. There are stations at each terminus, and three stops en route: Orton Mere, Overton and Wansford.
Northampton railway station serves the county town of Northampton in England. It is on the Northampton Loop of the West Coast Main Line and is located 65 miles 68 chains from London Euston. The station is served by West Midlands Trains services between London Euston and Birmingham New Street; there is also a limited direct service to Crewe. A handful of Avanti West Coast services also serve the station, but these have been greatly reduced due to the longer-term impact of the COVID-19 pandemic in the United Kingdom. It is the busiest station in Northamptonshire, and the fourth busiest station in the East Midlands.
Wansford is a village straddling the City of Peterborough and Huntingdonshire districts in the ceremonial county of Cambridgeshire, England. It had a population of 506 at the 2021 Census. It is situated 7 miles (11 km) west of Peterborough and 8 miles (13 km) miles south of Stamford. It is close to the county boundary with both Lincolnshire and Northamptonshire. The village is also located close to the A1 road and was on the route of the original Great North Road before the modern A1 was built. The village has since been bypassed by the A1 but the former Great North Road still exists through the village.
The A605 road is a main road in the English counties of Northamptonshire and Cambridgeshire.
Peterborough East was a railway station in Peterborough, England. It was opened on 2 June 1845 and closed to passenger traffic on 6 June 1966. Located on East Station Road just off Town Bridge, only the engine sheds and one platform remain. The station had services running west to Northampton and Rugby, as well as to the east to March, Wisbech, and Norwich.
Wansford railway station is the headquarters of the Nene Valley Railway in Cambridgeshire, England. The station building was opened in 1995 and contains a ticket office, shop, cafe and toilets. The locomotive sheds are located at this station. Also at the station there is a picnic area and children's playground. The station was formerly the junction for a branch to Stamford, which separated to the north just east of the river bridge at Wansford.
The Ashby and Nuneaton Joint Railway was a pre-grouping railway company in the English Midlands, built to serve the Leicestershire coalfield. Both the Midland Railway and the London and North Western Railway (LNWR) wished to build a line on similar alignments, and they agreed to build jointly. Construction began in 1869 and the railway was opened in 1873. It linked Moira and Coalville with Nuneaton. Mineral traffic was busy, and the line formed a useful link for through goods trains. Some long distance passenger operation took place over the line, but it was never successful in carrying passengers.
Barnwell railway station is a former railway station in Barnwell, Northamptonshire on the former Northampton and Peterborough Railway line which connected Peterborough and Northampton.
See also Thrapston Midland Road
Irthlingborough railway station is a former railway station in Irthlingborough, Northamptonshire, on the former Northampton and Peterborough Railway line which connected Peterborough and Northampton. In 1846 the line, along with the London and Birmingham Railway, became part of the London and North Western Railway.
Wellingborough London Road railway station is a former railway station in Wellingborough, Northamptonshire on a line which connected Peterborough and Northampton.
The Great Northern and London and North Western Joint Railway was a British railway line, almost entirely within Leicestershire. Authorised by the same Act of Parliament, the Great Northern Railway Leicester Branch was built, branching from the Joint Line; on the same basis the Newark to Bottesford Line was built. The lines opened progressively between 1879 and 1883. The dominant traffic was iron ore, and the agricultural produce of the area served also generated considerable business. The passenger usage was never heavy, although some unusual through services were attempted at first.
Blisworth railway station was a junction station on the London and North Western Railway, the Northampton and Banbury Junction Railway, and the Northampton and Peterborough Railway. As well as providing interchange between the lines, the station served the village of Blisworth in Northamptonshire and its environs. The station was opened by the London and Birmingham Railway (L&BR) in 1838.
The Rugby and Stamford Railway was an early railway in England built in 1850. The London and Birmingham Railway had already built a branch from Blisworth to serve Northampton and extend to Peterborough. The success of this, the Northampton and Peterborough Railway encouraged the directors to look for other ventures. They decided upon a branch from Rugby to Stamford which would link up with other new railways in the east of the country.
The Syston and Peterborough Railway was an early railway in England opened between 1846 and 1848 to form a connection from the Midland Counties Railway near Leicester to Peterborough, giving access to East Anglia over the Eastern Counties Railway. The project was part of the ambition of George Hudson to establish and maintain a monopoly of railway service over a large area of England. The surveying of the line achieved notoriety when Robert Sherard, 6th Earl of Harborough, who was hostile to railways, arranged a battle to obstruct surveys of the proposed line, and later of its construction.
The Bedford–Northampton line was a branch of the Midland Railway which served stations in three counties: Northampton and Horton in Northamptonshire, Olney in Buckinghamshire and Turvey and Bedford in Bedfordshire, England. Opened in 1872, the intermediate stations closed to passengers in 1962, leaving a small section between Northampton and Piddington station to remain open until 1981 for the purposes of the Ministry of Defence establishment. The track remains down on another small section of the line between Northampton and Brackmills. The reopening of the line has been proposed by the Bedfordshire Railway & Transport Association.
Roade was a railway station serving the Northamptonshire village of the same name on the West Coast Main Line. Roade Station opened in 1838 as the principal station for Northampton, but its importance diminished upon the opening of the Northampton and Peterborough Railway in 1845. The construction of the Northampton Loop Line in 1875 made Roade a junction station, and it survived until 1964.
The Weedon–Marton Junction line was a rural branch line in England that ran from the West Coast Main Line at Weedon, via Daventry to Marton Junction, where it joined the Rugby–Leamington line and thus connected to Leamington Spa.
The Stamford and Essendine Railway was built to connect Stamford, Lincolnshire, in England, to the nearby Great Northern Railway. It was a short line, and it opened in 1856. It was not commercially successful, and the directors sought a means of connecting Stamford directly to Peterborough. This was the Sibson Extension, opened from Stamford to Wansford in 1867, but the junction there did not facilitate through running to Peterborough, and the Sibson Extension was even less successful than the first line. It was closed in 1929.
The Higham Ferrers branch line was a short railway branch built in Northamptonshire, England, by the Midland Railway to serve the industrial towns of Rushden and Higham Ferrers. It was originally intended to continue the line to Raunds, but that was frustrated by the refusal of a landowner to release his land.