Holyhead Admiralty Pier | |
---|---|
Location | Holyhead, Anglesey Wales |
Other information | |
Status | Disused |
History | |
Original company | Chester and Holyhead Railway |
Pre-grouping | London and North Western Railway |
Post-grouping | London, Midland and Scottish Railway |
Key dates | |
20 May 1851 | Opened |
1 April 1925 | Closed |
Holyhead Admiralty Pier railway station served the pier in the town of Holyhead, Anglesey, Wales, from 1851 to 1925 on the Chester and Holyhead Railway.
The station was opened on 20 May 1851 by the Chester and Holyhead Railway. The services were horse-drawn until 1860. The goods shed was used by passengers to board the ferry to Ireland. They stopped using this in 1880 when the line was extended to Holyhead. The station closed on 1 April 1925. [1] [2]
The North Wales Coast Line, also known as the North Wales Main Line, is a major railway line in the north of Wales and Cheshire, England, running from Crewe on the West Coast Main Line to Holyhead on the Isle of Anglesey. The line has 19 stations, with all except two, Chester and Crewe, being in Wales.
Bangor railway station is a railway station in Bangor, Gwynedd, operated by Transport for Wales Rail Limited. The station, which is 24+3⁄4 miles (40 km) east of Holyhead, is the last mainland station on the North Wales Coast line between Crewe and Holyhead. It is the busiest in terms of passenger numbers in North Wales, as it serves the community around Caernarfon and further west, it is close to the Snowdonia National Park and Bangor University, and has an interchange with bus services to the various towns and villages of northern/western Gwynedd and Anglesey.
Llandudno Junction railway station is a station serving the village of Llandudno Junction on the Crewe to Holyhead North Wales Coast Line. The station is managed by Transport for Wales Rail Limited, although Avanti West Coast also serves it.
Gobowen railway station is a railway station on the Shrewsbury to Chester Line of the former Great Western Railway's London Paddington to Birkenhead Woodside via Birmingham Snow Hill line, serving the village of Gobowen in Shropshire, England. It is the nearest station to the town of Oswestry.
Chester railway station is located in Newtown, Chester, England. Services are operated by Avanti West Coast, Merseyrail, Northern and Transport for Wales. From 1875 to 1969 the station was known as Chester General to distinguish it from Chester Northgate. The station's Italianate frontage was designed by the architect Francis Thompson.
Abergele & Pensarn railway station on the North Wales Coast Line serves the town of Abergele. It is located in the coastal suburb of Pensarn.
Conwy railway station serves the town of Conwy, Wales, and is located on the Crewe to Holyhead North Wales Coast Line. There are through services to Chester via Colwyn Bay, Rhyl, Prestatyn and Flint in one direction and to Bangor & Holyhead in the other. After arrival at Chester, most trains go forward to either Crewe, Cardiff or Birmingham International.
Colwyn Bay railway station is on the Crewe to Holyhead North Wales Coast Line serving the seaside town of Colwyn Bay in North Wales.
Wrexham General railway station is a main line railway station and the main railway station serving Wrexham, north-east Wales. It is currently operated by Transport for Wales, but services are also provided by Avanti West Coast who operate a service to London Euston. Until January 2011 Wrexham & Shropshire also operated from here to London Marylebone.
Bodorgan railway station serves the hamlet of Bodorgan and the village of Bethel on the Isle of Anglesey, Wales. The stop is an unmanned halt, and serves as a request stop for Chester and Holyhead-bound local trains along the North Wales coast.
Holyhead railway station serves the Welsh town of Holyhead on Holy Island, Anglesey. The station is the western terminus of the North Wales Coast Line 105+1⁄2 miles (170 km) west of Crewe and is managed by Transport for Wales Rail Limited. It connects with the Holyhead Ferry Terminal.
The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland, as well as ordinary railway objectives. Its construction was hugely expensive, chiefly due to the cost of building the Britannia Tubular Bridge over the Menai Strait. The company had relied on Government support in facilitating the ferry service, and this proved to be uncertain. The company opened its main line throughout in 1850. It relied on the co-operation of other railways to reach London and in 1859 it was absorbed by the London and North Western Railway.
Ruabon railway station is a combined rail and bus interchange serving Ruabon in Wrexham, Wales. It is the second busiest station in Wrexham in terms of passenger journeys, after the mainline station, Wrexham General. It is on the Shrewsbury to Chester Line, which is part of the former Great Western Railway mainline route from London Paddington to Birkenhead Woodside which lasted until 1967.
Chirk railway station serves the town of Chirk in the county borough of Wrexham, Wales. Chirk station is on the Shrewsbury to Chester Line 21 miles (34 km) north of Shrewsbury, which is part of the former Great Western Railway mainline route from London Paddington to Birkenhead Woodside. The original 19th-century Chirk / Y Waun station building was demolished in 1987, without consultation, by the local council.
The Vale of Clwyd Railway (VoCR) was a standard-gauge line which connected the towns of Rhyl and Denbigh via St Asaph in North Wales.
The Birkenhead Railway was a railway company in England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting Chester and the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to The Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a Joint Railway until Nationalisation of the railways in 1948.
The Bangor and Carnarvon Railway was a railway company promoted to build a branch railway connecting Caernarfon with the main line at Bangor, in north-west Wales. It opened in 1852 as far as Port Dinorwic and was extended to Caernarfon later in the same year.
Bagillt railway station was a railway station serving the village of Bagillt on the North Wales Coast Line in the Welsh county of Flintshire. Although trains still pass on the main line, the station closed in 1966.
The Port of Holyhead is a commercial and ferry port in Anglesey, Wales, handling more than 2 million passengers each year. It covers an area of 240 hectares, and is operated by Stena Line Ports Ltd. The port is the principal link for crossings from north Wales and central and northern England to Ireland. The port is partly on Holy Island and partly on Salt Island. It is made up of the Inner Harbour, the Outer Harbour and the New Harbour, all sheltered by the Holyhead Breakwater which, at 2.7 kilometres, is the longest in the UK.
The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.
Preceding station | Historical railways | Following station | ||
---|---|---|---|---|
Terminus | Chester and Holyhead Railway | Holyhead Line and station open |