Horsham, Dorking and Leatherhead Railway

Last updated

The Horsham, Dorking and Leatherhead Railway (HD&LR) was an early railway company in southern England. It planned to fill in a gap in the network of the London, Brighton and South Coast Railway, shortening the route from London to coastal towns from Littlehampton to Portsmouth. It only obtained Parliamentary authorisation to build from Horsham to Dorking, and it sold its company to the LBSCR, which completed the construction, and itself built the remaining section from Dorking to Leatherhead.

Contents

It opened in 1867, and the LBSCR transferred through trains to this shorter route, relieving the congested main line. It was electrified from Leatherhead to Dorking in 1925 as part of the Southern Railway's outer suburban electrification scheme, and in 1938 the rest of the line was electrified, completing the route to the coast. A new regular interval service of fast trains was commercially successful.

The through fast trains were diverted to the Three Bridges route from 1978, and the line now carries only local passenger trains.

History

Horsham branch from Three Bridges

The Leatherhead to Horsham railway Leatherhead-horsham.gif
The Leatherhead to Horsham railway

The London and Brighton Railway was authorised to build a direct line through Three Bridges, and it opened in 1841. Its trains used the London and Croydon Railway at the north end of the route. [1] During the planning stage, one possible route would have run through Horsham, but the route selected ran through Three Bridges instead. A branch line was later constructed to Horsham from Three Bridges, opening on 14 February 1848. [2] The London and Brighton Railway merged with other companies to form the London, Brighton and South Coast Railway on 27 July 1846. [3]

Epsom and Leatherhead Railway

The Epsom and Leatherhead Railway was built independently; it opened on 1 February 1859. Although at first it was isolated from other lines, it was soon connected to the LBSCR route from London Bridge via Croydon, and the LSWR line from Waterloo via Wimbledon. [4] [5] [6]

Horsham to Petworth, and on to Arundel

The LBSCR sponsored a local company, the Mid-Sussex Railway, to build a new line from Horsham through Billingshurst and Pulborough to Petworth; the area was agricultural. The line opened on 15 October 1859 [7] [8] [9] [10] [11]

The LBSCR realised that the gap from the Petworth line to its own coastal line near Arundel could easily be closed, and a new line about ten miles long was built; it ran from Hardham Junction just south of Pulborough to the Arundel station, now named Ford. It saved ten miles on the journey from London to Chichester, Littlehampton and Portsmouth. The new line was described as the Mid-Sussex Junction Railway. [12] [8] [13]

Horsham, Leatherhead and Dorking Railway

The completion of the route from Three Bridges through Horsham and Pulborough to Arundel and beyond was a considerable boost to the LBSCR’s traffic, shortening the route. Independent promoters observed that the route from London to Horsham was rather roundabout, and subject to congestion on the double track main line. If the gap between Leatherhead and Horsham were closed, a new, more direct route would be formed. An independent company, the Horsham, Dorking and Leatherhead Railway was promoted to build such a line, and it gained its Parliamentary authorisation by Act of 17 July 1862. [14] [15]

Notwithstanding the company’s title, the authorisation was for a line from Horsham to Dorking only. The South Eastern Railway was established at Dorking, having opened its east-west line there in July (west from Dorking) and August (from Dorking to Redhill) 1849, by means of an affiliate company, the Reading, Guildford and Reigate Railway. The northern extremity of the HD&LR was a junction with the SER line enabling the Horsham trains to reach the Dorking station of the SER. [16]

The LBSCR observed that the HD&LR formed the basis of a useful link between Leatherhead and Horsham, and itself obtained powers to build from Leatherhead to Dorking, making a junction with the HD&LR. It absorbed the HD&LR company in 1864. It provided its own Dorking station and joined the HD&LR route a little south of the connection to the SER. In fact the LBSCR section was completed swiftly, opening on 11 March 1867; there was one intermediate station at Box Hill. [note 1]

The LBSCR absorbed the HD&LR company on 29 July 1864, [15] and completed the construction. The process was made difficult by geological conditions in Betchworth Tunnel, and the line finally opened on 1 May 1867. There were intermediate stations at Warnham, Ockley and Holmwood. [15] [17]

Leatherhead and Dorking connections

At Leatherhead, the terminal station of the Joint Epsom and Leatherhead Railway was identified as inconveniently located for the town, and the LBSCR extended south-westward in preparation for the Dorking line. It opened a new station on 4 March 1867, leaving the joint station in use only by the LSWR for a week. The LSWR were obliged to provide their own new station, separate from but adjacent to the LBSCR station. The LSWR transferred to its new station, and the joint station closed, on 11 March 1867. [18]

At Dorking the curve connecting to the SER line was built, and opened on 1 May 1867 along with the main line, but no regular traffic ever used it. [18] Oppitz says that it was used only once for a race special from Hastings to Epsom. It was removed in 1926, and reinstated in 1941 as a wartime precaution, but removed again after the war. [19]

Electrification to Dorking

The Southern Railway was formed in 1923 by the forced amalgamation of the LBSCR, the LSWR and other railways, in a process known as the Grouping, following the Railways Act 1921. The LSWR had implemented a widespread network of third-rail dc electrification in the suburban area, and this was considered to be highly satisfactory, and the Southern Railway determined to extend the system. The SR implemented a widespread scheme of electrification of outer suburban routes using the system. This included the line from Epsom to Leatherhead; public operation to Leatherhead started on 12 July 1925; there was a formal opening ceremony on 9 July. The new trains ran to a regular-interval pattern, and two trains per hour ran to Dorking. There were still two separate stations at Leatherhead, a legacy of the prior competition between the LSWR and the LBSCR. From 10 July 1927 the two stations at Leatherhead were re-arranged so that all trains used the former LBSCR station. [20] [21]

Electrification to the Coast

In 1935 it was agreed to electrify the main line from Dorking and Three Bridges to Arundel Junction. The work was the second scheme to be financed under the 1935 arrangement with the Treasury. It was known as the Portsmouth No 2 Scheme, as it followed the No 1 scheme, which was on the Portsmouth Direct line and associated routes. The newly-converted lines made end-on connections with existing electrified routes at Dorking (1925 suburban extension) and Three Bridges (1932/33 Brighton scheme).

The Down bay platform at Dorking North was converted into a loop and resignalled for running in either direction. Colour-light signalling was installed from Mickleham through to Holmwood controlled from a signal box at Dorking. Intermediate signal boxes, such as that at Lodge Farm north of Holmwood, ceased to be block posts. [20]

Work had progressed sufficiently for the first trial trains to run over the newly-electrified lines in May 1938, and in the following month electric stock was used on a number of specials between London Bridge and Bognor Regis. The official opening took place on 30 June 1938, with the usual civic receptions which had become a feature of SR electrification inaugurations. Regular electric services on the sections newly converted commenced on 2 July 1938. [22]

One suburban train each hour from Waterloo to Dorking North via Wimbledon and one train from London Bridge to Dorking North via Mitcham Junction were extended to Horsham, calling at all stations. Additionally, one other Waterloo train was extended as far as Holmwood. [22] As well as local services, there was now an hourly fast train from Victoria to Bognor Regis and Portsmouth, dividing at Barnham, running via Sutton, Epsom and Leatherhead, and making calls at Sutton, Dorking and Horsham. Trains from Waterloo previously terminating at Dorking North were extended to Horsham. In the first six months of the new electric service receipts rose 13%. [20]

Current operations

The Leatherhead to Horsham line is no longer a primary main line, as from 8 May 1978 the Bognor Regis trains have been diverted via Three Bridges, in order to serve Gatwick Airport. [23] The current (December 2022) timetable gives an hourly stopping train from Victoria to Horsham over the Dorking route, with an additional train from Victoria to Dorking and another from Waterloo to Dorking. [24]

Locations


Notes

  1. The SER line had a Box Hill station also; it is now called Deepdene.

Related Research Articles

<span class="mw-page-title-main">Epsom railway station</span> Railway station in Surrey, England

Epsom railway station serves the town of Epsom in Surrey, England. It is located off Waterloo Road and is less than two minutes' walk from the town's high street. It is 14 miles 18 chains (22.9 km) down the line from London Waterloo.

<span class="mw-page-title-main">Portsmouth Direct line</span> Railway line from London to Portsmouth, England

The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.

<span class="mw-page-title-main">Sutton and Mole Valley lines</span>

The Sutton and Mole Valley lines were constructed between 1847 and 1868 by the London, Brighton and South Coast Railway, the London and South Western Railway and the LBSCR-sponsored Horsham, Dorking and Leatherhead Railway.

<span class="mw-page-title-main">Horsham railway station</span> Railway station in West Sussex, England

Horsham railway station serves the town of Horsham in West Sussex, England. It is 37 miles 56 chains (60.7 km) down the line from London Bridge, measured via Redhill, on the Arun Valley Line and the Sutton & Mole Valley Lines, and train services are provided by Southern. Services on the Sutton & Mole Valley Line from London Victoria via Dorking terminate here, the others continue into the Arun Valley: a half-hourly service from London Victoria to Southampton Central or Portsmouth Harbour (alternating) and Bognor Regis. These trains usually divide here with the front (Southampton/Portsmouth) portion travelling fast and the rear half providing stopping services.

<span class="mw-page-title-main">Leatherhead railway station</span> Railway station in Surrey, England

Leatherhead railway station is in Leatherhead, Surrey, England. It is managed by Southern, with services provided by them and South Western Railway. It is 18 miles 2 chains (29 km) from London Waterloo.

<span class="mw-page-title-main">Dorking railway station</span> Railway station in Surrey, England

Dorking railway station is a railway station in Dorking, Surrey, England. Located on the Mole Valley line, it is 22 miles 8 chains (35.6 km) down the line from London Waterloo. The station is one of three that serve the town of Dorking, alongside Dorking Deepdene and Dorking West stations. Dorking and Dorking Deepdene stations are within walking distance of each other and interchange between them on a through ticket is permitted.

<span class="mw-page-title-main">Holmwood railway station</span> Railway station in Surrey, England

Holmwood railway station serves the villages of Beare Green and South Holmwood in Surrey, England, on the Sutton and Mole Valley Lines between Dorking and Horsham, 27 miles 5 chains (43.6 km) from London Waterloo.

<span class="mw-page-title-main">New Guildford line</span>

The New Guildford line, presently operated by South Western Railway, is a commuter line between London Waterloo and Guildford. It branches off the South West Main Line at Hampton Court Junction, just south-west of Surbiton. On timetables, trains on this route are advertised as going to Guildford via Cobham.

The Midhurst Railways were three branch lines which were built to serve the market town of Midhurst in the English county of West Sussex. The three lines were the Petersfield Railway, from Petersfield; the Mid-Sussex Railway extended by the Mid-Sussex and Midhurst Junction Railway, from Hardham Junction (Pulborough); and from Chichester. The Petersfield Railway opened in 1864, the promoting company having been absorbed by the London and South Western Railway (LSWR) in 1863. The Mid-Sussex lines reached Midhurst in 1866, after being absorbed by the London, Brighton and South Coast Railway (LBSCR) in 1862. The two lines did not connect, and there were two separate stations close by one another. The Chichester line took much longer to complete, and was opened in 1881, and a new LBSCR station was opened, replacing the first station. In 1925 the former LSWR line was connected to that station.

<span class="mw-page-title-main">Kingston loop line</span>

The Kingston loop line is a railway line built by the London and South Western Railway (L&SWR) in South West London. It was built in two stages; at first from Twickenham to Kingston, opened in 1863; travel from Kingston to London by that route was a rather circuitous trip. Later the line was extended from Kingston to Wimbledon in 1869. The line ran independently alongside the Southampton main line from Malden to Wimbledon, connecting there to other lines which gave access to Ludgate Hill in the City of London, as well as to Waterloo.

The Cranleigh line was a railway line in England that connected Guildford in Surrey, with Horsham in West Sussex. Construction of the line was started by an independent company, the Horsham and Guildford Direct Railway, but management failures delayed construction, and the company was taken over by the London, Brighton and South Coast Railway (LBSCR). The LBSCR completed the construction of the line and it was opened in 1865; it was nearly 16 miles in length.

The Steyning Line was a railway branch line that connected the West Sussex market town of Horsham with the port of Shoreham-by-Sea, with connections to Brighton. It was built by the London, Brighton and South Coast Railway, and opened in 1861. It was 20 miles in length. It followed the course of the River Adur for much of its extent and was alternatively known as the Adur Valley Line.

<span class="mw-page-title-main">LSWR suburban lines</span>

This article deals with the development of the London suburban railway lines of the London and South Western Railway (LSWR). For the wider view of the LSWR in general, see London and South Western Railway.

<span class="mw-page-title-main">Portsmouth line</span>

The Portsmouth line is a secondary main line originally built by the London, Brighton and South Coast Railway and the London and South Western Railway between 1847 and 1868. It leaves the South London Line at Peckham Rye, with connections to the Victoria branch of the Brighton Main Line at Streatham, and continues via Sutton, Epsom and Dorking to join the Mid-Sussex Line at Horsham.

The Wimbledon and Dorking Railway (W&DR) was an early railway company in southern England. It was independently promoted with the intention of penetrating into West Sussex, but it only succeeded in getting authorisation as far as Epsom. It joined the Epsom and Leatherhead Railway there, and opened in 1859.

The Epsom and Leatherhead Railway (E&LR) was a railway company in Surrey, England. Promoted independently, it opened its short line in 1859 and was worked by the London and South Western Railway (LSWR). It was transferred to the joint ownership of the LSWR and the London, Brighton and South Coast Railway (LBSCR) in 1860. Those companies operated passenger trains to Waterloo and London Bridge station respectively. In 1867 the LBSCR built an extension line from Leatherhead to Dorking, with the declared intention of continuing to the Sussex coast. A new Leatherhead station was built on the new line, and the LSWR was obliged to build its own independent, new Leatherhead station; this was a terminus for some years.

<span class="mw-page-title-main">Epsom Town railway station</span> Former railway station in England

Epsom Town railway station is a closed railway station that served the town of Epsom in Surrey, England. For many years, Epsom had two railway stations, one built by the LSWR in 1859, and this station, built by the LBSCR twelve years earlier. It was located on Upper High Street and is less than ten minutes' walk from the town's other station. It closed in 1929 when the former LSWR station was rebuilt and expanded to four platforms.

The Portsmouth to Brighton Railway was built by the London, Brighton and South Coast Railway and its immediate predecessor in several stages.

The Mid-Sussex railways were a group of English railway companies that together formed what became the Mid-Sussex line, from Three Bridges through Horsham to Littlehampton, in southern England. After 1938 the Southern Railway operated a regular electric train service ran from London to Bognor Regis and Portsmouth using the marketing brand "Mid-Sussex Line", leading to an informal consensus. The Mid-Sussex Railway company ran from Horsham to Petworth, and the Mid-Sussex Junction line of the London, Brighton and South Coast Railway (LBSCR) extended from the Petworth line to Littlehampton. The Three Bridges to Horsham branch of the LBSCR was at first the sole access from the north to the Mid-Sussex railways, although a line from Leatherhead was used later.

<span class="mw-page-title-main">Electrification of the London and South Western Railway</span>


The Electrification of the LSWR refers to the installation of electric traction on the London and South Western Railway surface network, and its successor the Western Section of the Southern Railway, in England. The LSWR started a programme of electrification in response to rising costs and loss of traffic to street tramways; the first installation was to Kingston, Richmond, Hounslow, Hampton Court and Shepperton, starting in 1917. The third rail DC system was used, as it was assessed to be considerably cheaper to install and maintain than the overhead systems then in use. The rolling stock was constructed by the conversion of relatively new coaches built for suburban steam-hauled operation. The LSWR generated its own electric power at a new power station near Wimbledon. A frequent regular-interval timetable was implemented and the system was a considerable success.

References

  1. J T Howard Turner, The London, Brighton and South Coast Railway, volume 1: Origins and Formation, B T Batsford Ltd, London, 1977, ISBN   0-7134-0275-X, page 138
  2. Turner, volume 1, page 234
  3. Turner, volume 1, page 277
  4. Alan A Jackson, The Railway in Surrey, Atlantic Transport Publishing, Penryn, 1999, ISBN   0-906899-90-7, pages 32 to 35
  5. R A Williams, The London and South Western Railway: volume 1: The Formative Years, David & Charles, Newton Abbot, 1968, ISBN   0-7153-4188-X, pages 152 to 154
  6. Turner, volume 2, pages 71, 72 and 73
  7. Turner, volume 2, pages 92 and 93
  8. 1 2 H P White, A Regional History of the Railways of Great Britain: volume II: Southern England, Phoenix House, London, 1961, pages 105 to 107
  9. Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 282
  10. Grant, pages 380 and 381
  11. Adrian Gray, Railways of Mid Sussex, Oakwood Press, 1975, pages 23 and 26
  12. Turner, pages 98 and 99
  13. Gray, page 36
  14. H P White, A Regional History of the Railways of Great Britain: volume II: Southern England, Phoenix House, London, 1961, page 102
  15. 1 2 3 Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN   978-1-78589-353-7, page 268
  16. Adrian Gray, The South Eastern Railway, Middleton Press, Midhurst, 1990, ISBN 978-0906520857, page 181
  17. Turner, volume 1, pages 111 and 112
  18. 1 2 Turner, volume 2, page 112
  19. Leslie Oppitz, Surrey Railways Remembered, Countryside Books, Newbury, 1988, ISBN   1-85306-005-4, page 42
  20. 1 2 3 Gray, pages 58 to 61
  21. David Brown, Southern Electric, volume 1, Development of the London Suburban Network and Its Trains, Capital Transport Publishing, Crowthorne, 2009, ISBN   978-1-85414-330-3, page 44
  22. 1 2 Brown, volume 2, page 34
  23. Railway Magazine, August 1978, page 416
  24. Southern publicity
  25. M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.04, September 2022, Railway and Canal Historical Society, electronic download