IpOp model is a strategic management approach for pre-project analysis suitable for innovation management and corporate entrepreneurship. [1] [2] Besides guiding innovators on how to analyze an opportunity, [3] it explains how to draft an opportunity case or a business plan to let decision-makers, such as investors, or management, assess the merits of the opportunity. [4]

Contents

History

The IpOp model was initially developed by Raphael H. Cohen, [1] [5] [6] [7] academic fellow and academic director for 20 years of the Entrepreneurial Leadership program at the University of Geneva, [8] [9] to help companies in their innovation management. It was first presented in 2006 in Concevoir et lancer un projet, [10] a French book that has been later translated into English and Spanish. IpOp stands for "Innovation per Opportunities” or how to innovate by seizing opportunities. The latest version of the book was published in 2016 and contains an improved version of the IpOp Model. [11] [12] In 2011 the 2006 version of the model was presented in Cohen's book Winning Opportunities, proven tools for converting your projects into success (without a business plan). [1] [13] [14]

Overview

Description

The IpOp model is a project analysis and decision-making tool. It provides a framework to analyze and assess the benefits and feasibility of projects at the pre-project stage. [4] IIt assumes that a more rigorous analysis at the pre-project stage helps better allocate resources. [15] The claim is that proper early-stage calibration of projects will avoid wasting resources on projects that should not be undertaken or take more time and resources than expected. The IpOp model uses a generic decision tree to help decision-makers better manage their resources. [1] [16]

To achieve this early calibration, the IpOp model highlights the need to catalog as many unknowns as possible as early as possible. This early stage is called “pre-project”. It focuses on defining the unknowns that are missing information that may realistically be obtained. Identifying the unknowns leads to a more accurate estimate of the resources required to reduce key unknowns. The IpOp model has been designed to guide the innovators’ analysis to identify as many unknowns as possible and obtain relevant answers to decision-makers’ concerns. It also shows the complex interactions between all parameters that need to be considered in a project. [17] [16] [18]

To be aligned with the logic of the IpOp decision tree for decision-makers Raphael H. Cohen suggests replacing the business plan by a two-parts approach:

IpOp model decision tree

According to Moses, on average, decision-makers use six different criteria to evaluate projects, with a minimum of 3 and a maximum of 9 parameters. [19] The IpOp model decision tree consists of 11 questions where the left column mentions where the answer to each question/decision criterion can be found in the IpOp model. In contrast, the right column indicates what the decision-makers should do if the answer is negative. Any organization can use this decision tree as a starting point and adapt it to its own circumstances and industry. More specific questions can be added to check the strategic fit. The author claims that using the IpOp model decision tree adds rigor to project management governance, especially in the pre-project stage. [20]

Importance of unknowns

A central characteristic of the IpOp model is the need to identify unknowns because every project has unknowns that express a lack of knowledge or understanding that may negatively affect the success of the project. [19] For instance, ignoring the size of the addressable market represents a critical unknown. The price that customers would be willing to pay is another unknown. In addition to market-related unknowns, there can be technology-related unknowns, process-related unknowns, stakeholders-related unknowns, intellectual property-related unknowns, regulatory unknowns, etc. To reduce the ignorance resulting from the information gap that is expressed by the unknowns, tactical moves or initiatives can be done to obtain the missing information. For example, a doubt about the technical feasibility can be reduced by building a prototype (a tactical move). Another doubt on the product or price acceptability by customers can be reduced with help of a market study (tactical move). [21]

The IpOp model helps identify and map as many unknowns as possible before significant resources (including time) are spent. Only once the key unknowns have been cataloged, and since each tactical move for reducing unknowns consumes resources (time, money, etc.), it is possible to assess the effort required to obtain the missing information as well as the most effective sequence of tactical moves for obtaining it. The author claims that this process allows for a more realistic calibration of the project.

Such method provides decision-makers with a clear view of resources required to first acquire missing information before deciding to launch the project. This means a better assessment of the time, money, and skills required to achieve the desired result. With a clearer understanding of the required effort, decision-makers can reject unnecessary initiatives that are not worth it and allocate resources more efficiently. This enhanced selection increases the success rate of projects delivering on time and on budget. This stringent selection process should also limit the number of projects that are launched but never completed. [19]

The opportunity case

The IpOp model encourages using an opportunity case, a document that addresses all the key issues that interest decision-makers without providing an implementation or action plan. The author makes the assumption that decision-makers are not concerned with the operational aspects of a project until they are convinced of how a project benefits them. [22] [23] This suggests that inundating them with implementation details, as is often the case in business plans, is unproductive as long as they are not convinced by the merits of the project. [24] [16] This led Raphael H. Cohen to use a two-step approach as an alternative to the traditional business plan:

First, an opportunity case for decision-makers, with everything that is relevant for them except the action plan. Cohen believes that this document should not exceed 10 pages. It allows decision-makers to give a first approval on the opportunity. [13] [23]

Second, an action plan which describes the implementation of the project. This plan which complements the opportunity case, will only be read by decision-makers who have found the opportunity case convincing. They will use the action plan to assess how the opportunity will be implemented to deliver the promised outcome stated in the opportunity case (the definition of success).

According to Cohen, this approach has multiple advantages over a business plan: as the opportunity case focuses on core decision-makers concerns without implementation details, it is much shorter (5 to 10 pages) than a business plan (30 to 50 pages). [13] [23] As a result, the IpOp analysis should be performed prior to developing an opportunity case or a business plan. [22] [25] Another benefit is that since the IpOp model helps identify unknowns it provides a more realistic assessment of the challenges and effort to address them.

The four IpOp reviews

The IpOp model uses a sequential and iterative approach [7] where each step is called IpOp review because it will most likely need to be revisited multiple times. [6] [19]

The iterative process explains why it is called “reviews” rather than steps, which are perceived as final when they are completed. The four IpOp reviews have been designed to quickly eliminate projects that do not deserve to consume resources. The IpOp decision tree includes the four IpOp Reviews. [26] [16]

The sequential approach of the IpOp model differentiates itself from the phase-gate or stage-gate model because the latter was built to allocate resource step-by-step. As long as a “gate”has not been validated, it is not possible to ask for additional resources for the next stage gate. To avoid resource waste, the IpOp model can be used before phase-gate process to calibrate project at a very early stage. As it identifies all critical unknowns early on, it helps select the most cost-effective sequence to obtain the missing information instead of always using the one-size-fits-all sequence of the phase-gate approach. [19] [22] [16]

As the IpOp model should be used before resources are allocated, the four IpOp reviews can be analyzed without consuming significant resources. [21] [16] The four IpOp reviews only consume the time of the people doing the analysis at the pre-project stage. Significant resource consumption (time and money) only starts when tactical moves are launched to reduce unknowns.

Questions asked at each IpOp review are stated in a way that allows quick elimination of projects for which the answer is negative. Rigorous decision-makers require a positive response to each decision criterion. The project innovators’ responsibility is to iterate and amend their project to transform every “no” into a “yes” for each question before submitting their project to investors or decision-makers. [16]

Usage

The IpOp model has been taught in corporate executive education seminars, business schools and MBA programs targeting intrapreneurs [2] [20] and entrepreneurs. [15] [12] [21] It has been field tested with over 250 intrapreneurial ventures, [19] and adopted among multinational companies, such as Airbus, Nestlé, [21] Bühler, Sanofi-Aventis, Microsoft, Deutsche Telekom, Orange, [5] [24] Oracle, ST Microelectronics, La Poste, [1] Serono, Capgemini, Ernst & Young. It has been used in banks like Banque Cantonale de Genève, la Banque Cantonale Vaudoise, [27] public administrations and non-profits like the Palo Alto Research Center, [23] EPFL (Swiss Federal Institute of Technology), [12] hospitalx, [28] startups and incubators. [1] [4]

Bibliography

See also

Related Research Articles

<span class="mw-page-title-main">Enterprise resource planning</span> Corporate task of optimizing the existing resources in a company

Enterprise resource planning (ERP) is the integrated management of main business processes, often in real-time and mediated by software and technology. ERP is usually referred to as a category of business management software—typically a suite of integrated applications—that an organization can use to collect, store, manage and interpret data from many business activities. ERP systems can be local-based or cloud-based. Cloud-based applications have grown in recent years due to the increased efficiencies arising from information being readily available from any location with Internet access.

<span class="mw-page-title-main">Risk management</span> Identification, evaluation and control of risks

Risk management is the identification, evaluation, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability or impact of unfortunate events or to maximize the realization of opportunities.

<span class="mw-page-title-main">Business plan</span> Formal written document containing the goals of a business

A business plan is a formal written document containing the goals of a business, the methods for attaining those goals, and the time-frame for the achievement of the goals. It also describes the nature of the business, background information on the organization, the organization's financial projections, and the strategies it intends to implement to achieve the stated targets. In its entirety, this document serves as a road-map that provides direction to the business.

<span class="mw-page-title-main">Business model</span> Rationale of how an organization operates

A business model describes how an organization creates, delivers, and captures value, in economic, social, cultural or other contexts. The process of business model construction and modification is also called business model innovation and forms a part of business strategy.

In business and engineering, product development or new product development covers the complete process of bringing a new product to market, renewing an existing product and introducing a product in a new market. A central aspect of NPD is product design, along with various business considerations. New product development is described broadly as the transformation of a market opportunity into a product available for sale. The products developed by an organisation provide the means for it to generate income. For many technology-intensive firms their approach is based on exploiting technological innovation in a rapidly changing market.

The word ‘dynamics’ appears frequently in discussions and writing about strategy, and is used in two distinct, though equally important senses.

Implementation is the realization of an application, execution of a plan, idea, model, design, specification, standard, algorithm, policy, or the administration or management of a process or objective.

A business case captures the reasoning for initiating a project or task. Many projects, but not all, are initiated by using a business case. It is often presented in a well-structured written document, but may also come in the form of a short verbal agreement or presentation. The logic of the business case is that, whenever resources such as money or effort are consumed, they should be in support of a specific business need. An example could be that a software upgrade might improve system performance, but the "business case" is that better performance would improve customer satisfaction, require less task processing time, or reduce system maintenance costs. A compelling business case adequately captures both the quantifiable and non-quantifiable characteristics of a proposed project. According to the Project Management Institute, a business case is a "value proposition for a proposed project that may include financial and nonfinancial benefit."

<span class="mw-page-title-main">Business analyst</span> Person who analyses and documents a business

A business analyst (BA) is a person who processes, interprets and documents business processes, products, services and software through analysis of data. The role of a business analyst is to ensure business efficiency increases through their knowledge of both IT and business function.

A technology roadmap is a flexible planning schedule to support strategic and long-range planning, by matching short-term and long-term goals with specific technology solutions. It is a plan that applies to a new product or process and may include using technology forecasting or technology scouting to identify suitable emerging technologies. It is a known technique to help manage the fuzzy front-end of innovation. It is also expected that roadmapping techniques may help companies to survive in turbulent environments and help them to plan in a more holistic way to include non-financial goals and drive towards a more sustainable development. Here roadmaps can be combined with other corporate foresight methods to facilitate systemic change.

Business analysis is a professional discipline focused on identifying business needs and determining solutions to business problems. Solutions may include a software-systems development component, process improvements, or organizational changes, and may involve extensive analysis, strategic planning and policy development. A person dedicated to carrying out these tasks within an organization is called a business analyst or BA.

Technology strategy is the overall plan which consists of objectives, principles and tactics relating to use of technologies within a particular organization. Such strategies primarily focus on the technologies themselves and in some cases the people who directly manage those technologies. The strategy can be implied from the organization's behaviors towards technology decisions, and may be written down in a document. The strategy includes the formal vision that guide the acquisition, allocation, and management of IT resources so it can help fulfill the organizational objectives.

Open innovation is a term used to promote an information age mindset toward innovation that runs counter to the secrecy and silo mentality of traditional corporate research labs. The benefits and driving forces behind increased openness have been noted and discussed as far back as the 1960s, especially as it pertains to interfirm cooperation in R&D. Use of the term 'open innovation' in reference to the increasing embrace of external cooperation in a complex world has been promoted in particular by Henry Chesbrough, adjunct professor and faculty director of the Center for Open Innovation of the Haas School of Business at the University of California, and Maire Tecnimont Chair of Open Innovation at Luiss.

<span class="mw-page-title-main">Sales and operations planning</span> Integrated business management process

Sales and operations planning (S&OP) is an integrated business management process through which the executive/leadership team continually achieves focus, alignment, and synchronization among all organization functions. The S&OP process includes an updated forecast that leads to a sales plan, production plan, inventory plan, customer lead time (backlog) plan, new product development plan, strategic initiative plan, and resulting financial plan. Plan frequency and planning horizon depend on the specifics of the context. Short product life cycles and high demand volatility require a tighter S&OP than steadily consumed products. Done well, the S&OP process also enables effective supply chain management.

Interactive planning is a concept developed by Russell L. Ackoff, an American theorist, early proponent of the field of operations research and recognized as the pioneer in systems thinking. Interactive planning forwards the idea that in order to arrive at a desirable future, one has to create a desirable present and create ways and means to resemble it. One of its unique features is that development should be ideal-oriented. Interactive planning is unlike other types of planning such as reactive planning, inactive planning, and preactive planning.

A phase-gate process is a project management technique in which an initiative or project is divided into distinct stages or phases, separated by decision points.

Small-scale project management is the specific type of project management of small-scale projects. These projects are characterised by factors such as short duration; low person hours; small team; size of the budget and the balance between the time committed to delivering the project itself and the time committed to managing the project. They are otherwise unique, time delineated and require the delivery of a final output in the same way as large-scale projects.

<span class="mw-page-title-main">Circular economy</span> Regenerative system in which resource input and waste, emission, and energy leakage, are minimised

A circular economy is a model of production and consumption, which involves sharing, leasing, reusing, repairing, refurbishing and recycling existing materials and products for as long as possible. CE aims to tackle global challenges such as climate change, biodiversity loss, waste, and pollution by emphasizing the design-based implementation of the three base principles of the model. The three principles required for the transformation to a circular economy are: designing out waste and pollution, keeping products and materials in use, and regenerating natural systems." CE is defined in contradistinction to the traditional linear economy. The idea and concepts of circular economy (CE) have been studied extensively in academia, business, and government over the past ten years. CE has been gaining popularity because it helps to minimize emissions and consumption of raw materials, open up new market prospects and, principally, increase the sustainability of consumption and improve resource efficiency.

Opportunity management (OM) has been defined as "a process to identify business and community development opportunities that could be implemented to sustain or improve the local economy".

Raphael H. Cohen is a Swiss professor, lecturer, author, serial entrepreneur, former business angel and academic director at MBA programs. He has a PhD in economics from University of Geneva, Switzerland.

References

  1. 1 2 3 4 5 6 Cohen, Raphaël (2016). Concevoir et lancer un projet : de l'idée au succès. Groupe Eyrolles. ISBN   978-2-212-56294-1. OCLC   944125278 . Retrieved 2022-01-30.
  2. 1 2 Clement, Michel (2010-12-01). The Unmarked Path. Dog Ear Publishing. ISBN   978-1-60844-874-6 . Retrieved 2022-01-30.
  3. "U mbajt konferenca biznesore me Dr. Raphael Cohen". Telegrafi (in Albanian). 2012-09-24. Retrieved 2022-01-30.
  4. 1 2 3 "IEDP Open-enrollment: Acquiring Competitive Advantages through Effective Innovation". Tongji University School of Economics and Management (SEM). 2013-08-20. Archived from the original on 2019-08-15. Retrieved 2022-01-30.
  5. 1 2 Hannedouche, Patrick. "Business Case ou Business Plan? L'interview de Raphaël Cohen". Patrick-hannedouche.fr/ (in French). Retrieved 2022-01-30.
  6. 1 2 Elsa Floret (2018-08-07). "Comment booster la performance grâce à des collaborateurs engagés". Agefi.com (in French). Retrieved 2022-01-30.
  7. 1 2 Malec, Małgorzata; Stańczak, Lilianna; Ricketts, Brian (2020-12-01). "Integrated Commercialization Model of Research and Development Project Results". Management Systems in Production Engineering. 28 (4): 228–239. Bibcode:2020MSPE...28..228M. doi: 10.2478/mspe-2020-0033 . S2CID   221257554.
  8. "Les stratégies d'un " business angel " pour trouver la formule gagnante". Geneva Business News | Actualités: Emploi, RH, économie, entreprises, Genève, Suisse. (in French). 2015-03-25. Retrieved 2022-01-30.
  9. "IpOp Seminar held in Osijek » ICES" . Retrieved 2022-01-30.
  10. "Koolitus: Ideest eduka ärini 12.-13.mail". www.tallinn.ee (in Estonian). Archived from the original on 2022-01-30. Retrieved 2022-01-30.
  11. Lebret, Hervé. "Proven Tools for Converting Your Projects into Success (without a Business Plan)" . Retrieved 2022-01-30.
  12. 1 2 3 "The Ipop Model". www.getratex.ch. Retrieved 2022-01-30.
  13. 1 2 3 Cohen, Raphael H. (2012-04-01). Winning Opportunities: Proven Tools for Converting Your Projects Into Success (without a Business Plan). Dog Ear Publishing. ISBN   978-1-4575-0450-1 . Retrieved 2022-01-30.
  14. "Raphael H.Cohen". Create my Business (in French). Retrieved 2022-01-30.
  15. 1 2 "Management by Opportunity". www.getratex.ch. Retrieved 2022-01-30.
  16. 1 2 3 4 5 6 7 Raphael H Cohen (April 2015). "Pour réduire les échecs en matière d'innovation et le gaspillage de ressources qui en résulte". Journal des sociétés (in French) (129): 34.
  17. Chiara Spagnoli Gabardi. "Voyage to the centre of innovation". Swiss Style Magazine (in French). Archived from the original on 2019-05-29.
  18. "Uncertainty in innovation". World Encyclopedia of Entrepreneurship, Second Edition. 2. Dalhousie University, Canada, Montpellier Business School, France: Léo-Paul Dana, Professor. 2021. ISBN   978-1-83910-413-8.
  19. 1 2 3 4 5 6 Moses, Mark (May 2014). "Investigating how decision-makers select new projects: Comparison between management practice and the literature's view of how it should be". School of Business, Management and Economics University of Sussex.
  20. 1 2 Hisrich, Robert D; Al-Dabbagh, Amr (2013). Governpreneurship: establishing a thriving entrepreneurial spirit in government. Edward Elgar. ISBN   978-1-78195-162-0. OCLC   808499089 . Retrieved 2022-01-30.
  21. 1 2 3 4 "Introduction To The IpOp Model As Presented at USASBE 2011" (in French). Retrieved 2022-01-30.
  22. 1 2 3 Raphael Cohen; Heribert Watzke; Jerome Katz. IpOp – Discovering Europe's Innovative Alternative To The Corporate Business Plan And How It Boosts Corporate Entrepreneurship. Hiltonhead, Florida.
  23. 1 2 3 4 Ouriel Ohayon (2007-05-16). "Le Business Plan est (presque) mort. Vive son remplaçant !" (in French). Archived from the original on 2007-05-18. Retrieved 2022-01-30.
  24. 1 2 "L'alternative au business plan ! Le dossier d'opportunités". Dynamique-Mag.com (in French). 2017-11-19. Retrieved 2022-01-30.
  25. Raphaël Cohen (January 2008). "Faut-il brûler les plans d'affaires ?". L'Expansion Management Review (in French). L'Express - Roularta. 128: 22–30.
  26. Nadina Muller; Mark Moses; Raphaël H. Cohen (2020). "The Effectiveness of the IpOp Model Decision Tree to Calibrate Projects at the Pre-Project Stage". International Journal of Business and Globalisation. 1: 1. doi:10.1504/IJBG.2020.10038787. S2CID   226653611 . Retrieved 2022-01-30.
  27. "Management by Opportunity Implementation". www.getratex.ch. Retrieved 2022-01-30.
  28. Bernard Gruson (2011-12-01). "L'art de surfer sur les effets secondaires". Gestions Hospitalières (in French) (511): 622–624.