Kashimbila Hydroelectric Power Station

Last updated

Kashimbila Power Station
Nigeria location map.svg
Red pog.svg
Location of Kashimbila Power Station
Placement on map is approximate
Africa location map.svg
Red pog.svg
Kashimbila Hydroelectric Power Station (Africa)
World location map (equirectangular 180).svg
Red pog.svg
Kashimbila Hydroelectric Power Station (Earth)
LocationKashimbila, Wukari Federation, Taraba State, Nigeria
Coordinates 06°52′27″N09°45′43″E / 6.87417°N 9.76194°E / 6.87417; 9.76194
Construction began2014
Opening date2019
Owner(s) Federal Government of Nigeria
Dam and spillways
Type of dam Gravity dam
Impounds Katsina-Ala River
Reservoir
CreatesN/A
Power Station
Commission date2019
Turbines Francis type, Gamesa Electric Company: 4 x 10 MW
Installed capacity 40 MW (54,000 hp)

The Kashimbila Hydroelectric Power Station, also Kashimbilla Hydroelectric Power Station is a 40 MW hydroelectric power station across the Katsina-Ala River in Nigeria. Originally intended to be an 18 megawatt installation, the dam and power station were re-configured to a 40 MW power station and the dam reservoir expanded from 200Mm3 to 500Mm3. The energy generated here is distributed within Taraba State, helping to meet an estimated 80 percent of households and businesses, as of 2020. [1] [2]

Contents

Design

The hydroelectric plant was intended to resolve ecological issues and increase local power supply. [3] Zutari Engineering of South Arica was hired to carry out "a technical feasibility study" of the dam's spillway in 2011. Later, Zutari was hired to perform the "detailed design of the dam, a technical feasibility study of the hydropower station, and, eventually the detailed design of the hydropower station". Zutari also provided engineering services for the laying of an estimated 240 kilometres (149 mi) of 132kV double circuit high voltage transmission evacuation lines and 40 kilometres (25 mi) of 33kV double-circuit transmission lines and five new substations. Commercial commissioning was effected in December 2019. [4]

Location

The power station lies across the Katsina River, near the town of Kashimbila,a Kambove Territory, town under Takum LGAWukari Federation, Taraba State, in North-eastern Nigeria, close to the international border with Cameroon. Kashimbila is located approximately 143 kilometres (89 mi) south of Wukari Town, the nearest large town. [5] This is approximately 354 kilometres (220 mi) southwest of Jalingo, the capital of Taraba State. [6] The geographical coordinates of Kashimbila Hydroelectric Power Station are: 06°52'27.0"N, 9°45'43.0"E (Latitude:6.874167; Longitude:9.761944). [7]

Overview

The Kashimbila Dam was conceived during the 2011 to 2015 time frame. Its objective is multipurpose. The first goal is to mitigate flooding which used to affect an estimated six million people in Taraba State, Benue State, Cross River State, Kogi State and Delta State. The second goal is to provide drinking water to neighboring communities, with an estimated population of 400,000 people. The third goal is to provide clean electricity for use, primarily in Taraba State. The fourth objective is to provide water for irrigation to an estimated 3,000 hectares (12 sq mi). [8]

The energy generated at this power station is evacuated via a number of 33kV and 132kV high voltage transmission lines to locations where the electricity is integrated into the Nigerian electricity grid. The evacuation power lines and associated substations were built new, as part of this development project. [8]

See also

Related Research Articles

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

Bugoye Power Station is a 13 MW (17,000 hp) mini hydroelectric power station in Uganda. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station.

The Muzizi Power Station is a proposed 45 megawatts (60,000 hp) hydroelectric power project in Uganda. The project, which has been planned for several years, has received a funding commitment from KfW and the French Development Agency.

Kikagati Hydroelectric Power Station, also referred to as Kikagati Power Station, is a 15.57 MW (20,880 hp) hydroelectric power station, in Uganda.

The Rusumo Hydroelectric Power Station, also known as the Rusumo Power Station, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with run of river design. A more expensive 90 megawatts (120,000 hp) reservoir design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$300 million compared to US$400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$340 million towards the US$468.60 million needed for the project. In November 2013, the African Development Bank approved a loan of US$113 million towards completion of the project.

The Mambilla Hydroelectric Power Station is a 3,050 MW hydroelectric power project under development in Nigeria. When completed, it will be the largest power-generating installation in the country, and one of the largest hydroelectric power stations in Africa.

Nyamwamba I Hydroelectric Power Station, also referred to as Nyamwamba I Power Station, is a 9.2 megawatts mini-hydroelectric power station in Uganda.

Muvumbe Hydroelectric Power Station is a 6.5 megawatts (8,700 hp) hydroelectric power station in the Western Region of Uganda.

Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.

Zungeru Hydroelectric Power Station is a 700 megawatts (940,000 hp) hydroelectric power plant under construction in Niger State, Nigeria. When completed, as expected, it will be the second-largest hydroelectric power station in the country, behind the 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.

Kafue Gorge Lower Power Station (KGL), is a 750 megawatts (1,010,000 hp) hydroelectric power station in Zambia.

The Mirama–Kabale High Voltage Power Line is a high voltage electricity power line, connecting the high voltage substation in the town of Mirama Hills, in the Western Region to another high voltage substation in te city of Kabale, also in the Western Region of Uganda.

The Mirama–Kikagati–Nsongezi High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Mirama Hills, in the Western Region of Uganda, to another high voltage substation at Kikagati Hydroelectric Power Station and continues to end at Nshungyezi Hydropower Station.

Grand Katende hydroelectric power station is a hydropower plant under construction in the Democratic Republic of the Congo, with installed capacity of 64 megawatts (86,000 hp). When completed, it will be operated by the Congolese electricity utility company, Société Nationale d'Électricité (SNEL).

Koukoutamba Hydroelectric Power Station is a planned 294 megawatts (394,000 hp) hydroelectric power station, across the Bafing River, a tributary of the Senegal River, in Guinea. The power station is under development by the Organisation pour la mise en valeur du fleuve Sénégal (OMVS),. OMVS will sell the electricity to the four member electricity utility companies of the organization. Sinohydro, a hydropower engineering and construction company, owned by the Chinese state, was awarded the engineering, procurement and construction (EPC) contract. The US$812 million project is funded by the Exim Bank of China.

Rumakali Hydroelectric Power Station is a 222 megawatts hydroelectric power station under construction in Tanzania. The power station is under development by a consortium comprising Tanzania Electric Supply Company Limited (TANESCO), the government-owned electricity utility company and the China Gezhouba Group. The power generated at this power station will be sold to TANESCO, for integration into the national electric grid.

<span class="mw-page-title-main">Soubré Hydroelectric Power Station</span> Hydroelectric power station in Ivory Coast

The Soubré Power Station is a 275 megawatts hydroelectric power station across the Sassandra River, in the Ivory Coast. The station was commissioned on 2 November 2017, after four years of construction. This renewable energy infrastructure is owned and operated by CI Energies, the Ivorian electric utility parastatal company. The dam and power station were funded 85 percent by Exim Bank of China, though a loan and by the Government of Ivory Coast, through 15 percent equity investment. The power station's 1,200 GWh in annual energy production contributed an estimated 10 percent to national generation capacity in 2017. The station was the largest hydroelectric energy source in Ivory Coast, at the time it was commissioned.

The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company.

Chishimba Hydroelectric Power Station is a 15 megawatts (20,000 hp) hydroelectric power station that sits across the Luombe River in Zambia. The power station, first commissioned in 1959, was rehabilitated and expanded in 1971 and again expanded and modernized in the 2020s. This power station is owned by the Government of Zambia and is operated and maintained by Zambia Electricity Supply Corporation Limited (ZESCO), the national electricity utility company. The energy generated here is distributed to the city of Kasama and other parts of Kasama District.

Kakono Hydroelectric Power Station, also referred to as Kakono Power Station, is a 87.8 MW (117,700 hp) hydroelectric power station, under construction in Tanzania.

References

  1. Femi Bolaji (18 April 2022). "Nigeria: 40MW Kashimbilla Hydro-Power Plant Lights Up Taraba Community" (via AllAfrica.com). Vanguard (Nigeria) . Lagos, Nigeria. Retrieved 18 April 2022.
  2. Gamesa Electric (2020). "Commissioning of Kashimbila Hydropower Station (40 MW) in Nigeria". Gamesaelectric.com. Zamudio, Vizcaya, Spain. Retrieved 18 April 2022.
  3. "Kashimbila power project ready for commissioning – minister". The Guardian. News Agency of Nigeria. 30 August 2019. Retrieved 18 April 2022.
  4. Zutari Engineering (2020). "Generation of 40 MW from the Kashimbila hydropower station". Zutari.com. South Africa. Retrieved 18 April 2022.
  5. Google (18 April 2022). "Road Distance Between Kashimbila, Nigeria And Wuhari, Nigeria" (Map). Google Maps . Google. Retrieved 18 April 2022.
  6. Google (18 April 2022). "Road Distance Between Kashimbila, Nigeria And Jalingo, Nigeria" (Map). Google Maps . Google. Retrieved 18 April 2022.
  7. Google (18 April 2022). "Geographical Location of Kashimbila Hydroelectric Power Station" (Map). Google Maps . Google. Retrieved 18 April 2022.
  8. 1 2 Ayodele Samuel (1 September 2019). "What you should know about Kashimbila 40MW Hydro-Power Plant". Vanguard (Nigeria) . Lagos, Nigeria. Retrieved 18 April 2022.