Mambilla Hydroelectric Power Station

Last updated

Mambilla Hydroelectric Power Station
Nigeria location map.svg
Red pog.svg
Map of Nigeria showing the location of Mambilla Hydro Power Station
Official nameMambilla Hydro Power Station
CountryNigeria
LocationKakara village, Taraba State
Coordinates 06°49′23″N11°07′06″E / 6.82306°N 11.11833°E / 6.82306; 11.11833
StatusProposed
Construction costUS$5.8 billion
Owner(s) Federal Government of Nigeria
Dam and spillways
Type of dam Mass concrete
Impounds Donga River
Commission date2030 (expected)
Type Run of the river
Turbines 12
Installed capacity (planned) 3050 MW

The Mambilla Hydroelectric Power Station is a 3,050 MW hydroelectric power project under development in Nigeria. When completed, it will be the largest power-generating installation in the country, and one of the largest hydroelectric power stations in Africa. [1]

Contents

Location

The power station is located in Kakara village, in Taraba State, Nigeria. This is near the town of Gembu, close to the border with Cameroon. The power station sits across the Donga River, and consists of four dams and two underground power houses. [1] Gembu is approximately 413 kilometres (257 mi), by road, southeast of Wukari, the nearest large town, all in Taraba State. [2]

Overview

Mambilla Plateau Mambilla Plateau, Nigeria 02.jpg
Mambilla Plateau

Constructed in 1982, the main Mambilla Dam is a large roller-compacted concrete dam and reservoir at 1,300 metres (4,300 ft) above sea level. From this dam, water is diverted off the reservoir towards the western side of the plateau through four hydraulic tunnels totaling 33 kilometres (21 mi), intercepted by four smaller dams: Nya, Sum Sum, Nghu, and Api Weir. [1]

Beyond these dams, the tunnels lead into a 1,000 metres (3,300 ft) drop shaft tunneled down through the rock to a massive underground power station with a generating capacity of 3,050 megawatts (4,090,000 hp). Passing through a short tunnel, the water then exits the base of the plateau and flows into a tributary river that rejoins the Donga River downstream of the plateau. [1]

Mambilla Plateau Mambilla Plateau, Nigeria 03.jpg
Mambilla Plateau

Development

On 30 August 2017, the Federal Executive Council (FEC) approved the award of the construction contract to a consortium of Gezhouba Group, Sinohydro, and CGCOC Group. [3]

The Mambilla Hydropower Plant Project has been planned for over 40 years. It is expected to connect to four dams across the Donga River. The first preliminary feasibility study for the Mambilla Hydropower Plant was reportedly carried out by Moto Columbus in 1972, but attempts to construct the power station up to now have been unsuccessful. [3]

Funding

The total cost of the project is budgeted at US$5.8 billion. The Exim Bank of China has agreed to lend 85 percent (US$4.93 billion) towards the construction. The funds will be paid directly to the construction consortium in tranches, as the work progresses. The Federal Government of Nigeria has committed to contribute 15 percent (US$870 million) of the construction costs. [3]

Construction

In November 2017, there were attempts to start construction of this power station. [4] However, due to various constraints, including landslides, [4] and a lawsuit at the International Court of Arbitration, the project stalled again. In February 2020, following the resolution of the lawsuit, there were fresh attempts to resume construction. [5]

Construction is expected to take at least seven years from start to finish, due to the technical complexity of the project. [3] A more realistic completion date is 2030. [1]

Other considerations

Construction of this power station is expected to generate 50,000 temporary and permanent jobs. [1] The power generated will be sold to the Transmission Company of Nigeria, which will transmit it to two locations, where it will be integrated into the Nigerian electricity grid; one 330kV high voltage transmission line will connect to Jalingo and two to Makurdi. The entire new planned high voltage transmission system measures over 700 kilometres (435 mi). [6]

See also

Related Research Articles

<span class="mw-page-title-main">Taraba State</span> State of Nigeria

Taraba State is a state in north-eastern Nigeria, named after the Taraba River, which traverses the Southern part of the state. Taraba State capital is Jalingo. Its slogan is Nature's Gift to the Nation. The main ethnic groups are the Mumuye, Mambilla, Jukun, Kuteb, Wurkun, Yandang, Ndola, Ichen, Jenjo, Tiv, Fulani, Tigun, and Jibu. The northern part is mainly dominated by the Fulani, and Mumuye. The southern parts are dominated by the Jukun, Chamba, Tiv, Kuteb and Ichen. The central region is mainly occupied by the Fulani, Mambilla, Ndola, Tigun, Jibu, Wurbo, and Daka people. There are 77 distinct ethnic groups, and their languages in the State.

<span class="mw-page-title-main">Run-of-the-river hydroelectricity</span> Hydroelectric power station

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

Kabalega Hydroelectric Power Station, also known as Kabalega Power Station is a 9 MW (12,000 hp) mini hydroelectric power project located across River Wambabya, in Buseruka Sub County, Hoima District, in Western Uganda. At the beginning of planning and during construction, the power station was referred to as Buseruka Power Station, but was renamed after completion.

Mpanga Power Station is an 18 megawatts (24,000 hp) mini hydroelectric power project located across River Mpanga, in Kitagwenda County, Kitagwenda District in Western Uganda.

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

<span class="mw-page-title-main">Mambilla Plateau</span> Geological formation in Nigeria

The Mambilla Plateau is a plateau in the Taraba State of Nigeria. The Mambilla Plateau has an average elevation of about 1,600 metres (5,249 ft) above sea level, making it the highest plateau in Nigeria. Some of its villages are situated on hills that are at least 1,828 metres (5,997 ft) above sea level. Some mountains on the plateau and around it are over 2,000 metres (6,562 ft) high, like Gang or Chappal Waddi which has a height of 2,419 metres (7,936 ft) above sea level. It is the highest mountain in Nigeria and in West Africa. The Mambilla Plateau measures about 96 km (60 mi) along its curved length; it is 40 km (25 mi) wide and is bounded by an escarpment that is about 900 m (2,953 ft) high in some places. The plateau covers an area of over 9,389 square kilometres (3,625 sq mi).

<span class="mw-page-title-main">Gembu, Nigeria</span> City in Taraba State, Nigeria

Gembu is a town on the Mambilla Plateau in Taraba State of Nigeria. It is the headquarters of Sardauna Local Government Area in Taraba State.

Bugoye Power Station is a 13 MW (17,000 hp) mini hydroelectric power station in Uganda. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station.

The Rusumo Hydroelectric Power Station, also known as the Rusumo Power Station, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with run of river design. A more expensive 90 megawatts (120,000 hp) reservoir design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$300 million compared to US$400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$340 million towards the US$468.60 million needed for the project. In November 2013, the African Development Bank approved a loan of US$113 million towards completion of the project.

Muvumbe Hydroelectric Power Station is a 6.5 megawatts (8,700 hp) hydroelectric power station in the Western Region of Uganda.

The Sondu Miriu Hydroelectric Power Station is a hydroelectric power station on the Sondu River in Kenya.

Kikonge Hydroelectric Power Station project is a proposed 300 MW (400,000 hp) hydroelectric dam in Ruvuma Region, Tanzania.

Achwa 2 Hydroelectric Power Station is a 41 megawatts (55,000 hp) hydroelectric power plant, in Uganda.

Sindila Hydroelectric Power Station, also Sindila Power Station, is an operational 5.25 MW (7,040 hp) mini-hydropower station in the Western Region of Uganda.

The Mpatamanga Hydro Power Project, is a 361MW hydroelectric generating project under developpement at Mpatamanga on the Shire River, in Malawi

Kholombidzo Dam, also Kholombidzo Hydroelectric Power Station is a planned 200 megawatts (270,000 hp) hydroelectric dam in Malawi.

Rumakali Hydroelectric Power Station is a 222 megawatts hydroelectric power station under construction in Tanzania. The power station is under development by a consortium comprising Tanzania Electric Supply Company Limited (TANESCO), the government-owned electricity utility company and the China Gezhouba Group. The power generated at this power station will be sold to TANESCO, for integration into the national electric grid.

The Kashimbila Hydroelectric Power Station, also Kashimbilla Hydroelectric Power Station is a 40 MW hydroelectric power station across the Katsina-Ala River in Nigeria. Originally intended to be an 18 megawatt installation, the dam and power station were re-configured to a 40 MW power station and the dam reservoir expanded from 200Mm3 to 500Mm3. The energy generated here is distributed within Taraba State, helping to meet an estimated 80 percent of households and businesses, as of 2020.

The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company.

Kakono Hydroelectric Power Station, also referred to as Kakono Power Station, is a 87.8 MW (117,700 hp) hydroelectric power station, under construction in Tanzania.

References

  1. 1 2 3 4 5 6 NS Energy (2018). "Mambilla Hydropower Project". United Kingdom: NS Energy. Retrieved 20 February 2020.
  2. Globefeed.com (20 February 2020). "Distance between Wukari, Taraba State, Nigeria and Gembu, Taraba State, Nigeria". Globefeed.com. Retrieved 20 February 2020.
  3. 1 2 3 4 Teresia Njoroge (28 August 2019). "Nigeria seeks US $5bn loan for construction of Mambilla Hydropower Project". Nairobi: Construction Review Online. Retrieved 20 February 2020.
  4. 1 2 Michael Harris (7 November 2017). "Construction begins on Nigeria's 3,050-MW Mambilla hydropower plant". Hydroreview.com. Retrieved 20 February 2020.
  5. Chineme Okafor (18 February 2020). "Federal Government Secures Legal Approval for 3050MW Mambilla Power Plant". This Day . Lagos. Retrieved 20 February 2020.
  6. Ayodeji Adegboyega (26 August 2020). "What we're doing to improve Nigeria's electricity supply – Minister". Nigeria: Premium Times Services Limited. Retrieved 14 September 2020.