Kitka Wind Farm

Last updated
Kitka Wind Farm
Kitka1.jpg
Kitka Wind Farm
Official nameParku i Erës Kitkë
Country Kosovo
LocationKitkë, Kamenica
Coordinates 42°39′21″N21°39′59″E / 42.65583°N 21.66639°E / 42.65583; 21.66639
StatusOperational
Commission date 2018
Construction costEUR 73 million
Wind farm
Type Onshore
Hub height110 m
Rotor diameter137 m
Power generation
Units operational27 x 3.8 MW
Make and modelGeneral Electric Energy 3.6-137
Nameplate capacity 32.4  MW
Annual net output 95.6 GW·h

The Kitka Wind Farm is the first wind farm in Kosovo. [1] It has a nameplate capacity of 32.4 MW and it is estimated to have a total annual output of electricity of 95.6 GWh and supplies enough clean energy to power 10,000 households. [2] The project got commissioned in October 2018. [2]

The Kitka Wind Farm has 9 units of GE 3.6-137 turbines, each with 3.6 MW nameplate capacity from the supplier, GE Renewable Energy.

One of the wind turbines of the Kitka Wind Farm Kitka3.jpg
One of the wind turbines of the Kitka Wind Farm

Kosovo’s power transmission system operator KOSTT said it has signed a connection agreement for a 20 MW expansion of the Kitka wind farm. [3]

See also

Related Research Articles

<span class="mw-page-title-main">Iberdrola</span> Spanish multinational electric utility monopoly

Iberdrola is a Spanish multinational electric utility company based in Bilbao, Spain. Iberdrola has a workforce of around 34,000 employees serving around 30 million customers. Subsidiaries include Scottish Power and a significant part of Avangrid, amongst others. As of 2023, the largest shareholder of the company is the Qatar Investment Authority, with BlackRock and Norges Bank also holding significant interests.

<span class="mw-page-title-main">Capacity factor</span> Electrical production measure

The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is defined as that due to its continuous operation at full nameplate capacity over the relevant period. The capacity factor can be calculated for any electricity producing installation, such as a fuel consuming power plant or one using renewable energy, such as wind or the sun. The average capacity factor can also be defined for any class of such installations, and can be used to compare different types of electricity production.

<span class="mw-page-title-main">Fowler Ridge Wind Farm</span> Wind farm in Indiana, USA

The Fowler Ridge Wind Farm is a wind farm in Benton County, Indiana, near the city of Fowler, IN about 30 miles (48 km) northwest of Lafayette and 90 miles (140 km) northwest of Indianapolis. Fowler Ridge was originally developed in 2005 and 2006 by Orion Energy, LLC and Vision Energy, LLC and later sold in 2007 to BP and Dominion Resources. The project was constructed beginning in 2008 in two phases and has a nameplate capacity of 600 MW.

<span class="mw-page-title-main">Shiloh wind power plant</span>

The Shiloh wind power plant is a wind farm located in the Montezuma Hills of Solano County, California, USA, close to Bird's Landing and Collinsville, 40 miles (64 km) northeast of San Francisco. It has a nameplate capacity of 505 megawatts (MW) of power and was built in four stages between 2005 and 2012. Several additional projects are also located in the Montezuma.

<span class="mw-page-title-main">Fântânele-Cogealac Wind Farm</span>

The Fântânele-Cogealac Wind Farm is the largest onshore wind farm in Romania and in Europe, with installed nameplate capacity of 600 MW from 240 General Electric 2.5xl wind turbines. The wind farm has been built for the ČEZ Group.

New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.

The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 523.3 megawatts (MW).

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of November 2023, wind power in the Netherlands has an installed capacity of 11,602 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

GE Wind Energy is a branch of GE Renewable Energy, a subsidiary of General Electric. The company manufactures and sells wind turbines to the international market. In 2018, GE was the fourth largest wind turbine manufacturer in the world.

<span class="mw-page-title-main">Meadow Lake Wind Farm</span> Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

<span class="mw-page-title-main">Wind power in Japan</span>

In Japan's electricity sector, wind power generates a small proportion of the country's electricity. It has been estimated that Japan has the potential for 144 gigawatts (GW) for onshore wind and 608 GW of offshore wind capacity. As of 2020, the country had a total installed capacity of 4.2 GW.

As of the end of 2021, New Mexico had 4,001 megawatts (MW) of wind powered electricity generating capacity, responsible for 30% of electricity produced that year. Wind power in New Mexico has the potential to generate more than all of the electricity consumed in the state.

<span class="mw-page-title-main">Electrical energy in Kosovo</span> Overview of the electricity sector in Kosovo

The electricity sector of Kosovo relies on coal-fired power plants and is considered one of the sectors with the greatest potential of development. The inherited issues after the war in Kosovo and the transition period have had an immense effect on the progress of this sector.

<span class="mw-page-title-main">Murra Warra Wind Farm</span>

The Murra Warra Wind Farm is one of Australia's largest wind farms. Located on the plains of north-western Victoria, approximately 25 kilometres (16 mi) north of the city of Horsham, it consists of 99 wind turbines with a maximum tip height of 220m.

Empire Wind is a proposed utility-scale offshore wind farm on the Outer Continental Shelf Offshore New York. It will be located in Bureau of Ocean Energy Management (BOEM) lease area OCS-A 0512 in the New York Bight about 15 miles (24 km) south of Jones Beach, Long Island.

<span class="mw-page-title-main">Bajgora Wind Farm</span> Wind farm in Mitrovica, Kosovo

The Bajgora Wind Farm is the largest wind farm in Kosovo. It has a nameplate capacity of 102.6 MW and it is estimated to have a total annual output of 320 GWh, while the system is designed to be operated for at least 25 years.

References

  1. "KITKA Wind". www.ebrd.com. Retrieved 2023-06-06.
  2. 1 2 Carmen (2022-02-10). "Power plant profile: Kitka Wind Farm, Kosovo". Power Technology. Retrieved 2023-06-13.
  3. "Kosovo's KOSTT signs connection deal for Kitka wind farm expansion". Renewablesnow.com. Retrieved 2023-06-13.