Kuju Area

Last updated
Kuju Area
Location
India Jharkhand location map.svg
Schlaegel und Eisen nach DIN 21800.svg
Kuju Area
Location in Jharkhand
India location map.svg
Schlaegel und Eisen nach DIN 21800.svg
Kuju Area
Kuju Area (India)
Location West Bokaro Coalfield
Coordinates 23°43′13″N85°30′10″E / 23.7203°N 85.5028°E / 23.7203; 85.5028
Owner
Company Central Coalfields Limited
Website centralcoalfields.in/cmpny/hstry.php

Kuju Area is one of the operational areas of the Central Coalfields Limited located mainly in the Ramgarh district in the state of Jharkhand, India.

Contents

Projects and area office

The projects of the Kuju Area are: Saruberia underground, Saruberia opencast, Ara open cast, Kuju underground, Topa underground, Topa open cast, Pindra underground, Pindra open cast, Pundi open cast, Karma open cast. The area office is at Hesagarha, Kuju 825316. [1]

Mining activity

Kuju Area
Transparent.svg
Transparent.svg
4km
2.5miles
CT
Mandu
Transparent square.svg
Transparent square.svg
CT
Kuju
Transparent square.svg
Transparent square.svg
H
Damodar River
G
Bokaro River
A
CCL Kuju
Area Office
O
Saruberia colliery
O
Ara colliery
O
Karma colliery
M
Kuju colliery
O
Topa colliery
Collieries in the CCL Kuju Area (West Bokaro Coalfield)
U: Underground colliery, O: Open Cast colliery, M: Mixed colliery, W: Washery, S: Facility, A: Administrative headquarters, CT: census town
Owing to space constraints in the small map, the actual locations in a larger map may vary slightly

Mines and projects

Mourpa, Kuju, Hesagora and Banwar collieries were regrouped in 1973 after nationalisation of the coal industry in a single unit named Kuju colliery. Mining was carried out in a number of sections by underground and opencast systems. In 2016-17 the total production from the mine was 5,526 tonnes. As of 2017, all underground mines were closed. As of 31/3/2017, the total mineable reserve in 5 seams (XIII, XII, XI, XA, X) was 9.03 million tonnes. The Kuju opencast project has been planned for a nominal production capacity of 1.30 million tonnes per year of coal and peak production 1.50 million tonnes of coal. The project will sustain a quarry life of eight years. Feasibility of extracting coal up to 140 metres (460 ft) depth including developed area of underground workings by opencast method is studied and it is found technically feasible to convert the underground mine to opencast mine up to seam X. [2]

The Karma opencast project will have, as in 2010, a normal production of 1.0 million tonnes per year and a peak production of 1.2 million tonnes per year. The life of the project was estimated to be 26 years. The project is located on the bank of the Damodar River and a protective embankment was planned. [3]

Illegal mining activities

According to the Report on Prevention of Illegal Coal Mining and Theft, “The main source of illegal mining of coal and theft is abandoned mines. After economic extraction is over, the remaining coal in an abandoned mine is stolen by coal mafias, villagers leading to roof falling, water flooding, poisonous gas leaking, leading to the death of many labourers.” In the Kuju Area of CCL illegal mining activities are taking place in Pindra, Topa, Ara and Saruberia non-working mines, and Kuju-Morpa, Banwar, Pundri non-working quarries. Illegal mining also takes place in the fringe areas and outside the leasehold areas of CCL. [4]

Kuju Area
Transparent.svg
Transparent.svg
8km
5miles
f
Bhairavi
River
e
Damodar
River
d
Bokaro
River
0
CCL Rajrappa Area
Transparent square.svg
Transparent square.svg
0
CCL Kuju Area
0
CCL
Hazaribagh Area
Transparent square.svg
Transparent square.svg
0
CCL Argada Area
Transparent square.svg
Transparent square.svg
0
CCL Barka
Sayal Area
Transparent square.svg
Transparent square.svg
P
Patratu
Super TPP
Transparent square.svg
Transparent square.svg
T
Rajrappa
Transparent square.svg
Transparent square.svg
R
Gola
Transparent square.svg
Transparent square.svg
R
Ghatotand
Transparent square.svg
Transparent square.svg
R
Dulmi
Transparent square.svg
Transparent square.svg
R
Bhurkunda
Transparent square.svg
Transparent square.svg
R
Bhadani Nagar
Transparent square.svg
Transparent square.svg
M
Ramgarh Cantonment
Transparent square.svg
Transparent square.svg
CT
Topa
Transparent square.svg
Transparent square.svg
CT
Taping
Transparent square.svg
Transparent square.svg
CT
Sirka
Transparent square.svg
Transparent square.svg
CT
Sewai
Transparent square.svg
Transparent square.svg
CT
Seota
Transparent square.svg
Transparent square.svg
CT
Saunda
Transparent square.svg
Transparent square.svg
CT
Sanri
Transparent square.svg
Transparent square.svg
CT
Patratu
Transparent square.svg
Transparent square.svg
CT
Orla
Transparent square.svg
Transparent square.svg
CT
Marar
Transparent square.svg
Transparent square.svg
CT
Mandu
Transparent square.svg
Transparent square.svg
CT
Lapanga
Transparent square.svg
Transparent square.svg
CT
Kuju
Transparent square.svg
Transparent square.svg
CT
Kedla
Transparent square.svg
Transparent square.svg
CT
Jainagar
Transparent square.svg
Transparent square.svg
CT
Hesla
Transparent square.svg
Transparent square.svg
CT
Chitarpur
Transparent square.svg
Transparent square.svg
CT
Bongabar
Transparent square.svg
Transparent square.svg
CT
Barughutu
Transparent square.svg
Transparent square.svg
CT
Ara
Transparent square.svg
Transparent square.svg
CT
Barkakana
Transparent square.svg
Transparent square.svg
CT
Balkundra
Transparent square.svg
Transparent square.svg
Cities, towns and locations in Ramgarh district in North Chotanagpur Division
M: municipality, CT: census town, R: rural/ urban centre, T: tourist centre, P: power plant
Abbreviation used- TPP: thermal power project
Owing to space constraints in the small map, the actual locations in a larger map may vary slightly

Educational facilities for employees’ children

Central Coalfields Limited provides support for reputed institutions/ trusts for setting up 10+2 pattern CBSE schools for children of CCL employees. It provides 109 buses to employees' children to schools and back. Among the schools in the West Bokaro Coalfield that receive financial help or structural support are: DAV Ara, Kuju, DAV Kedla, DAV Taping, DAV Topa. [5]

Medical facilities

In the West Bokaro Coalfield, CCL has the following facilities:

S.C.Taping Regional Hospital at Premnagar, Taping with 20 beds, has 1 general duty medical officer. Among the facilities it has are: x-ray, laboratory. It has 1 ambulance. [6]

JRH Kedla Colliery Hospital at Kedla has 32 beds. [6]

There are central facilities in the Central Hospital, Gandhinagar at Kanke Road, Ranchi with 250 beds and in the Central Hospital, Naisarai at Ramgarh with 150 beds. [6]

There are dispensaries at GM unit, Topa, Saruberia composite and Kuju colliery in the Kuju Area, and GM Unit and Jharkhand in the Hazaribagh Area. [7]

Note: For Hazaribagh district map please see Hazaribagh Area

References

  1. "Central Coalfields Limited". Areas - Kuju. CCL. Retrieved 25 December 2020.
  2. "Mining Plan for Kuju OCP" (PDF). CMPDI. Retrieved 18 December 2020.
  3. "Minutes of 4th Expert Appraisal Committee (EAC) (Thermal & Coal Mining) Meeting Held on 39th-31st August 2010". Ministry of Coal. Retrieved 18 December 2020.
  4. "Report – Prevention of Illegal Coal Mining and Theft" (PDF). Pages 3, 39. Standing Committee on Coal & Steel, 2010. Retrieved 18 December 2020.
  5. "Educational facilities". CCL. Retrieved 12 February 2021.
  6. 1 2 3 "Status report of existing patient care facility in CCL" (PDF). CCL. Retrieved 12 February 2021.
  7. "Status of Dispensaries" (PDF). CCL. Retrieved 12 February 2021.