Lake Greenwood (South Carolina)

Last updated
Lake Greenwood
USA South Carolina location map.svg
Red pog.svg
Lake Greenwood
Location within South Carolina
Location Greenwood / Laurens / Newberry counties, South Carolina, United States
Coordinates 34°13′44″N81°58′40″W / 34.228835°N 81.977835°W / 34.228835; -81.977835 Coordinates: 34°13′44″N81°58′40″W / 34.228835°N 81.977835°W / 34.228835; -81.977835
Type reservoir
Primary inflows Saluda River
Primary outflows Saluda River
Basin  countriesUnited States
Surface area11,400 acres (46 km2)
Average depth21.8 ft (6.6 m) [1]
Max. depth69.3 ft (21.1 m) [1]
Surface elevation439 ft (134 m)

Lake Greenwood was formed by a hydroelectric dam built across the Saluda River near Chappells SC. The impoundment was licensed by the Federal Power Commission, predecessor to the current Federal Energy Regulatory Commission (FERC), as the Buzzards Roost Project. The project was re-licensed by FERC in 1995. The FERC Project No is P-1267. The lake has 212 miles (341 km) of shoreline and 11,400 acres (46 km2). While the waters of Lake Greenwood extend into three counties (Greenwood, Laurens and Newberry counties), Greenwood County actually owns the entire lake bed, having purchased all properties comprising the bed of the lake from farmers along both sides of the rivers in the late 1930s. Funding was provided by loans from the Public Works Administration during the Great Depression. All loans were later repaid in full. The Saluda River, the Reedy River and Rabon Creek come together to feed Lake Greenwood. There is also a local watershed surrounding the basin from which local rain also drains into the reservoir. Water released from Lake Greenwood feeds into the Saluda River at Chappells, which ultimately feeds into Lake Murray.

Because the Buzzards Roost Project was formed to provide hydroelectric power to the local area, in direct competition with Duke Power Company, and at significantly lower rates, Duke Power vigorously challenged the project on various legal grounds. However, a ruling by the United States Supreme Court ultimately cleared the way for the project to be built using the federal loans.

Greenwood County, via the Greenwood County Electric Power Commission, a special purpose directed created by Act of the S.C. General Assembly, operated the Buzzards Roost Project until the mid-1960s. At that time, Duke Power made an offer to purchase the county's electric distribution network and customer base for $10,000,000, as well as to lease the hydroelectric facility from Greenwood County, for a period of 40 years, at an annual rental of $250,000 per year. Some local residents favored the sale. Others opposed the sale. Articles published in the local Greenwood newspaper, the Index Journal, present a wealth of information about different views of the proposed sale. The S.C. General Assembly ultimately decided to put the matter to a referendum before the voters in Greenwood County. Greenwood state Senator Frances B. Nicholson opposed the sale, and Greenwood state Representative John W. Drummond supported the sale. Drummond simultaneously challenged Nicholson in his bid for re-election to the senate seat. The referendum was passed by the voters, and Drummond defeated Nicholson in the race for the Greenwood senate seat. However, Senator Nicholson, fearing that local officials might spend the purchase money unwisely, had caused a provision to be inserted into the South Carolina Constitution stating that the proceeds from the sale could never be spent, but instead, had to be invested so that Greenwood County could only receive the interest. Section 13 of Article XVII of the S.C. Constitution is unique to the state constitution, and it can only be amended by a statewide vote, among other requirements. In addition, Senator Nicholson added the requirement that Duke Power pay all costs of repairs during the lease as well as pay all costs of re-licensing with FERC in 1985. An additional provision, suggested by an employee of Duke Power, was that all customers of Greenwood County at the time of the sale would continue to keep their existing county power rates forever, unless one of a couple of triggers occurred, at which point the customers would be switched to the Duke power rates. It has been estimated that about 9,000 properties fell under those provisions at the time of the sale. For a period of time, Duke power rates fell below the county power rate, and many owners elected to give up their grandfathered status. However, after the inflationary increases in the cost of electricity in the early 1970s, all customers who were still receiving the old county rate at that time effectively had their rates locked in forever (still subject to a few possible triggers). Duke Power attempted to avoid having to honor that provision of its agreement, but the S.C. Supreme Court rejected all of Duke's arguments. In the early 2000s, it was estimated that approximately 3,000 properties in Greenwood County still had the old county rate for electricity and that the net cost to Duke was approximately $1,000,000 a year in lost profits for those customers.

Residential and commercial uses adjoining Lake Greenwood have contributed tremendously to the economic development of this rural area. Lake Greenwood is also used for recreational boating and fishing, and Greenwood County regularly stocks the lake with fish in consultation with the S.C. Department of Natural Resources and the U.S. Fish and Wildlife Service.

See also

Related Research Articles

Greenwood County, South Carolina U.S. county in South Carolina

Greenwood County is a county located in the U.S. state of South Carolina. As of the 2010 census, its population was 69,661. Its county seat is Greenwood.

Greenwood, South Carolina City in South Carolina, United States

Greenwood is a city in and the county seat of Greenwood County, South Carolina, United States. The population was 23,222 at the 2010 census. The city is home to Lander University.

Public Utility Regulatory Policies Act

The Public Utility Regulatory Policies Act is a United States Act passed as part of the National Energy Act. It was meant to promote energy conservation and promote greater use of domestic energy and renewable energy. The law was created in response to the 1973 energy crisis, and one year in advance of a second energy crisis.

Duke Energy company

Duke Energy Corporation headquartered in Charlotte, North Carolina, is an American electric power holding company in the United States, with assets in Canada.

Western Area Power Administration

As one of the four power marketing administrations within the U.S. Department of Energy, the Western Area Power Administration (WAPA)'s role is to market wholesale hydropower generated at 56 hydroelectric federal dams operated by the Bureau of Reclamation, United States Army Corps of Engineers and the International Boundary and Water Commission. WAPA delivers this power through a more than 17,000-circuit-mile, high-voltage power transmission system to more than 700 preference power customers across the West. Those customers, in turn, provide retail electric service to more than 40 million consumers. WAPA is headquartered in the Denver, Colorado suburb of Lakewood, Colorado.

Lake of the Ozarks Reservoir in Missouri, United States

Lake of the Ozarks is a reservoir created by impounding the Osage River in the northern part of the Ozarks in central Missouri. Parts of three smaller tributaries to the Osage are included in the impoundment: the Niangua River, Grandglaize Creek, and Gravois Creek. The lake has a surface area of 54,000 acres (220 km2) and 1,150 miles (1,850 km) of shoreline. The main channel of the Osage Arm stretches 92 miles (148 km) from end to end. The total drainage area is over 14,000 square miles (36,000 km2). The lake's serpentine shape has earned it the nickname "Puff The Magic Dragon", which has in turn inspired the names of local institutions such as The Magic Dragon Street Meet.

Jennings Randolph Lake reservoir spanning the border between Maryland and West Virginia, United States

Jennings Randolph Lake is a reservoir of 952 acres (3.85 km2) located on the North Branch Potomac River in Garrett County, Maryland and Mineral County, West Virginia. It is approximately eight miles upstream of Bloomington, Maryland, and approximately five miles north of Elk Garden, West Virginia.

Bull Run Hydroelectric Project Dam in Oregon

The Bull Run Hydroelectric Project was a Portland General Electric (PGE) development in the Sandy River basin in the U.S. state of Oregon. Originally built between 1908 and 1912 near the town of Bull Run, it supplied hydroelectric power for the Portland area for nearly a century, until it was removed in 2007 and 2008. The project used a system of canals, tunnels, wood box flumes and diversion dams to feed a remote storage reservoir and powerhouse. The entire project was removed because of rising environmental costs. Marmot Dam on the Sandy River was demolished in 2007, and the Little Sandy Dam on the Little Sandy River was taken down in 2008.

Lake Murray (South Carolina)

Lake Murray is a reservoir in the U.S. state of South Carolina. It is approximately 50,000 acres (200 km2) in size, and has roughly 650 miles (1,050 km) of shoreline. It was impounded in the late 1920s to provide hydroelectric power to the state of South Carolina. Lake Murray is fed by the Saluda River, which flows from upstate South Carolina near the North Carolina state line. The Saluda Dam was an engineering feat at the time of its construction. The dam, using the native red clay soil and bedrock, was the largest earthen dam in the world when it was completed in 1930. Lake Murray itself is named after the project's chief engineer, William S. Murray. The Saluda Dam is approximately 1.5 miles (2.4 km) long and 220 feet (67 m) high. Lake Murray is 41 miles (66 km) long, and 14 miles (23 km) wide at its widest point. At the time when the lake was finished, it was the world's largest man-made reservoir.

Saluda Dam Dam in Lexington County, near Lexington, South Carolina

The Saluda Dam or Saluda River Dam, officially the Dreher Shoals Dam, commonly referred to as the Lake Murray Dam, is an earthen embankment dam located approximately 10 miles (15 km) west of Columbia, South Carolina on the Saluda River. Construction on the dam began in 1927 and was completed in 1930. The purpose of the dam is flood control, hydroelectricity, recreation and water supply. At the time of its completion, the Saluda Dam was the world's largest earthen dam, creating the world's largest man-made lake, Lake Murray. In 2005, construction on a 213 ft (65 m). tall roller-compacted concrete (RCC) dam was completed at the toe of the original dam in order to mitigate an earthquake-caused dam failure.

Seattle City Light public electric utility, Seattle, Washington, U.S.

Seattle City Light is the public utility providing electrical power to Seattle, Washington, in the United States, and parts of its metropolitan area, including all of Shoreline and Lake Forest Park and parts of unincorporated King County, Burien, Normandy Park, SeaTac, Renton, and Tukwila. Seattle City Light is the 10th largest public utility in the United States and the first municipal utility in the US to own and operate a hydroelectric facility. In 2005, it became the first electric utility in the United States to fully offset all its carbon emissions and has remained carbon neutral every year since.

Saluda River river in the United States of America

The Saluda River is a principal tributary of the Congaree River, about 200 mi (320 km) long, in northern and western South Carolina in the United States. Via the Congaree River, it is part of the watershed of the Santee River, which flows to the Atlantic Ocean.

SCANA Corporation was a regulated electric and natural gas public utility. The company was based in Cayce, South Carolina, a suburb of Columbia, South Carolina.

Condit Hydroelectric Project Former dam in Washington, United States

Condit Hydroelectric Project was a development on the White Salmon River in the U.S. state of Washington. It was completed in 1913 to provide electrical power for local industry and is listed in the National Register of Historic Places as an engineering and architecture landmark.

The Piedmont & Northern Railway was a heavy electric interurban company operating over two disconnected divisions in North and South Carolina. Tracks spanned 128 miles (206 km) total between the two segments, with the northern division running 24 miles (39 km) from Charlotte, to Gastonia, North Carolina, including a three-mile (5 km) spur to Belmont. The southern division main line ran 89 miles (143 km) from Greenwood to Spartanburg, South Carolina, with a 12 mi (19 km) spur to Anderson. Initially the railroad was electrified at 1500 volts DC, however, much of the electrification was abandoned when dieselisation was completed in 1954.

Alcoa Power Generating, Inc. is a subsidiary of Alcoa Inc., headquartered in Pittsburgh, Pennsylvania. Its three divisions were independent subsidiaries before being consolidated into Alcoa Power Generating, Inc. (APGI). These three projects have produced hydroelectric power and manage impoundments which also provide flood control; recreation, residential and business opportunities; and wildlife habitat.

Pensacola Dam Dam in Mayes County, near Disney and Langley, Oklahoma

The Pensacola Dam, also known as the Grand River Dam, is a multiple-arch buttress dam on the Grand River in-between Disney and Langley in the U.S. state of Oklahoma. The dam is operated by the Grand River Dam Authority and creates Grand Lake o' the Cherokees. After decades of vision and planning, it was constructed between 1938 and 1940 for the purposes of hydroelectric power generation, flood control and recreation. It is Oklahoma's first hydroelectric power plant and is referred to as the longest multiple-arch dam in the world.

Natural Gas Act of 1938

The Natural Gas Act of 1938 was the first occurrence of the United States federal government regulating the natural gas industry. It was focused on regulating the rates charged by interstate natural gas transmission companies. In the years prior to the passage of the Act, concern arose about the monopolistic tendencies of the transmission companies and the fact that they were charging higher than competitive prices. The passage of the Act gave the Federal Power Commission (FPC) control over the regulation of interstate natural gas sales. Later on, the FPC was dissolved and became the Federal Energy Regulatory Commission (FERC). FERC continues to regulate the natural gas industry to this day.

Yuba–Bear Hydroelectric Project

The Yuba–Bear Hydroelectric Project is a complex hydroelectric scheme in the northern Sierra Nevada in California, tapping the upper Yuba River and Bear River drainage basins. The project area encompasses approximately 400 square miles (1,000 km2) in Nevada, Placer, and Sierra Counties. Owned by the Nevada Irrigation District, it consists of 16 storage dams plus numerous diversion and regulating dams, and four generating stations producing 425 million kilowatt hours of electricity each year. The Yuba–Bear Hydroelectric Project consists of the Bowman development, Dutch Flat No. 2 development, Chicago Park development, and Rollins development.

Klamath River (Hydroelectric Project)

The Klamath river begins below Upper Klamath Lake in Southern Oregon and flows about 300 miles through Northern California until draining into the Pacific ocean. Upper Klamath Lake is the largest freshwater lake in Oregon and was established by the late Pliocene period. The lake fills a graben that is thousands of meters deep. The Klamath Basin lies on the edge of the Basin and Range province and is adjacent to the High Cascades of Southern Oregon.