Centre d'essais ferroviaires – Near Alstom Valenciennes factory site in Raismes, includes 2.75km for testing at 100km/h, a 1.85km loop for endurance testing at 80km/h, and a loop for testing driverless trains.
Construction for Indian Railways' first test track is underway in Jodhpur division, Rajasthan. The 60 km track is being built to conduct tests for Semi-high-speed rail and high-speed rail (200-250 km/h) and to test the axle loads of up to 32.5 tonnes.[1]
This page is based on this Wikipedia article Text is available under the CC BY-SA 4.0 license; additional terms may apply. Images, videos and audio are available under their respective licenses.