The Regional Municipality of Waterloo is the 10th largest urban area in Canada and among the fastest growing in the country. It's comprises the cities of Kitchener, Waterloo, Cambridge which collectively grew by over 100,000 people between July 1 2019 and July 1 2024. The Region is among the largest in Southern Ontario only being surpassed by Hamilton, Mississauga, Brampton, Ottawa and Toronto. The Region is also home to 4 rural townships which are home to numerous towns and villages, such as Elmira and New Hamburg. The three cities have a combined population of 627,729 as of July 1 2024, while the CMA (Cities and surrounding townships) has a population approaching 700,000.
In Waterloo Region, As of June 2020 [update] , the region contains 61 highrises over 50 m (164 ft) and 110 high-rise buildings that exceed 35 m (115 ft) in height. [1] [2] [3] The tallest buildings built and proposed within the Region are in Kitchener's downtown core which will be home to the Region's first skyscrapers (150m+). The tallest building completed in the Region is in Kitchener with the 130.7 m (429 ft) DTK Condos at the corner of Duke and Frederick St, this can be seen in the center of the image to the right. The majority of the high-rises in the area are in Kitchener, however Waterloo has a significant amount in the Northdale area.
The tallest building under construction in Waterloo Region is TEK Tower located in Kitchener, at 146 m (479ft) and 45 floors. It structurally topped out in the summer of 2025. As of July 2023 [update] , there are at least 184 high-rises under construction, approved for construction, and proposed for construction in the Waterloo Regional Municipality, of which 91 are within Kitchener. The tallest approved building within the Region is the 50 floor (185m) Station Park E building which will complete the 5 tower Station Park development. If approved and constructed, the currently proposed 50 Borden Ave S will overtake Station Park E to become the tallest building in the Region standing at an astounding 57 floors (187.8m) over downtown Kitchener.
The vast majority of the development occurring within the Region is along the LRT line which was completed and opened in June of 2019. Since then the area along the LRT has seen remarkable growth and continues to see this growth today.
Each city in the Region, as well as the townships have the power to determine the zoning and thus the built form of the city/towns. This greatly influences the amount of development and the type that can occur, in the coming sections this will become more prevalent.
The city of Kitchener recently updated the zoning within the downtown core as well as all areas along the LRT. This includes every major transit station area (MTSA) for the ION as well as the future Sportsworld MTSA which is part of phase 2 of the ION. This process to update the zoning was called Growing Together, through the process all existing zoning within the MTSAs, which included zoning dating back to 1985 was removed and replaced with 4 new zones. These zones are called strategic growth areas (SGA), these SGAs are split into SGA-1, SGA-2, SGA-3 and SGA-4. Each zone covers approximately 25% of the MTSAs within the city. The most restrictive zone is SGA-1 which allows for a maximum height of 4 floors and a minimum floor space ratio (FSR) of 1. The SGA-2 zone allows for a maximum height of 8 floors and a minimum FSR of 1, this zone is generally seen as the transition zone between the SGA-1 and higher density SGA-3 and SGA-4 zones. The SGA-3 zone allows for a maximum height of 28 floors with the same density restriction as SGA-1 and SGA-2. Lastly the SGA-4 zone allows for unlimited height. Within each of these zones there is no parking required regardless of how many units are in place. The city has provided minimum amenity space requirements for all of these zones, likewise the city has developed a concept called priority streets in these zones where a certain amount of the road frontage must be community facing on the first two floors of the building, this could be a school, community centre or commercial space among other uses. Through the Growing Together project the city of Kitchener won numerous awards, for example it won a Smart50 Award in 2023 where it was announced as one of the top-3 projects overall.
The areas outside of the MTSAs still have relatively restrictive zoning with single family housing being the primary built form, however there are various nodes and corridors in the city that are experiencing densification. Much of this is occurring in far reaching areas of the city (new subdivisions). This will be changing in the coming years however as the city is looking to expand the existing SGA zones to larger areas of the city as part of the Kitchener 2051 Official Plan update. This will make corridors in the city such as Ottawa Street, as well as Nodes such as Highland/Fischer Hallman and Strasburg and Block Line have the same SGA zoning as the MTSAs.
The city of Waterloo has updated their zoning bylaw recently along the LRT much like Kitchener however this was restricted to areas north of Columbia St. These areas have a new zone called station area mixed use (SAMU). The SAMU zone has the largest heights in the city and likewise the highest densities. The SAMU zone allows for a maximum height of 30 floors/105 meters. In the rest of the city there are various other zones but much like Kitchener the heights are concentrated along the LRT line. The one notable exception to this is in the Northdale area as the area is home to the primary student residences for both the University of Waterloo and Laurier. This area is also home to some significant height.
The Northdale area is home to the RN zones of Waterloo, in these zones the maximum building height corresponds to the zone, RN-6, RN-12 and RN-25 each is representative of the maximum number of floors allowed and likewise has some of the taller buildings in Waterloo. Along major corridors such as Weber and King there is existing height and the zoning is generally permissive of the height through the C1, RMU and C5 zones which all allow for varying heights and densities, namely each one of these zones have maximum heights similar to the RN zones however these correspond to the building height in meters instead of floors. For example C1-20, C1-30, C1-40, C1-60, and C1-81.
Cambridge has the most antiquated zoning within the Region, however they are currently going through a process to update their bylaw. The update will allow for residential zones throughout Cambridge to have a maximum height of 15 floors, still well below KWs height limits. Within the downtowns (Galt, Hespeler and Preston) there will be densification possible but not on the magnitudes occurring in Kitchener and Waterloo. The core areas of Preston and Hespeler will allow for a maximum of 5 floors. Meanwhile Galt will allow for similar heights to what is presently allowed (0-34m). Cambridge however doesn't have the LRT yet so the bylaw will likely be updated in coming years once construction has started.
This list ranks buildings in Waterloo that stand at least 35 m (115 ft) tall, based on CTBUH height measurement standards. This includes spires and architectural details but does not include antenna masts.
Rank | Building | Height | Floors | Completed | City |
---|---|---|---|---|---|
1 | DTK Condos | 131 m (430 ft) | 39 | 2021 | Kitchener |
2 | Charlie West | 106 m (348 ft) | 31 | 2020 | Kitchener |
3 | Station Park Union Towers T2 | 94m | 29 | 2022 | Kitchener |
4 | Garment St Condo [4] | 89 m (292 ft) | 28 | 2021 | Kitchener |
5 | Young Condos T2 | 85m | 26 | 2023 | Kitchener |
6 | Sage II Condos [5] | 84 m (276 ft) | 23 | 2017 | Waterloo |
7 | K2 Condos [5] | 83 m (272 ft) | 23 | 2015 | Waterloo |
8 | Caroline Street Private Residences [5] | 82 m (269 ft) | 23 | 2019 | Waterloo |
9 | 100 Victoria Tower 2 | 23 | 2021 | Kitchener | |
10 | ICON North Tower [5] | 81 m (266 ft) | 25 | 2016 | Waterloo |
ICON South Tower [5] | 81 m (266 ft) | 25 | 2016 | Waterloo | |
205 Albert | 81 m (266 ft) | 25 | 2023 | Waterloo | |
13 | Barrel Yards - The Onyx North Tower [5] | 80 m (262 ft) | 25 | 2017 | Waterloo |
Barrel Yards - The Onyx South Tower [5] | 80 m (262 ft) | 25 | 2015 | Waterloo | |
15 | Sun Life Building [5] | 78 m (256 ft) | 18 | 1987 | Waterloo |
16 | The Cooperage North Tower [5] | 73 m (240 ft) | 20 | 2017 | Waterloo |
The Cooperage South Tower [5] | 73 m (240 ft) | 20 | 2015 | Waterloo | |
18 | CIRCA1877 | 70m | 20 | Waterloo | |
19 | Gaslight Condos T1 | 20 | Cambridge | ||
Gaslight Condos T2 | 20 | Cambridge | |||
21 | 1 Columbia Street West | 68 m (223 ft) | 22 | 2014 | Waterloo |
144 Park [6] | 68 m (223 ft) | 19 | Waterloo | ||
OneFiftyFive [7] | 68 m (223 ft) | 19 | Waterloo | ||
24 | Waterpark Place East [8] | 66 m (217 ft) | 23 | - | Waterloo |
Canada Trust Centre [9] | 66 m (217 ft) | 18 | - | Kitchener | |
26 | Luxe II [10] | 63 m (207 ft) | 21 | 2013 | Waterloo |
1 Victoria [11] | 63 m (207 ft) | 19 | 2016 | Kitchener | |
28 | High Point [12] | 62 m (203 ft) | 19 | - | Kitchener |
29 | Wellington Place [13] | 61 m (200 ft) | 19 | - | Kitchener |
30 | 100 Victoria Tower 1 | 18 | 2019 | Kitchener | |
31 | Conestoga Towers [14] | 59 m (194 ft) | 17 | 1968 | Kitchener |
32 | Marsland Centre [15] | 58 m (190 ft) | 13 | 1974 | Waterloo |
33 | Phillip Square T1 | 67 m | 20 | - | Waterloo |
Phillip Square T2 | 67 m | 20 | - | Waterloo | |
Phillip Square T3 | 67 m | 21 | - | Waterloo | |
Phillip Square T4 | 67 m | 21 | |||
37 | Cedarwoods Tower [16] | 58 m (190 ft) | 19 | 1980 | Kitchener |
Gresham Place II [17] | 58 m (190 ft) | 17 | - | Kitchener | |
39 | Bauer Lofts [18] | 57 m (187 ft) | 15 | 2009 | Waterloo |
Canada Trust Building [19] | 57 m (187 ft) | 11 | - | Kitchener | |
The Regency [20] | 57 m (187 ft) | 18 | 2004 | Kitchener | |
The Bow | 57 m (187 ft) | 16 | 2021 | Kitchener | |
43 | City Centre I [21] | 56 m (184 ft) | 15 | 2016 | Kitchener |
44 | Park Place Towers [22] | 55 m (180 ft) | 17 | - | Kitchener |
45 | Bridgeport House [23] | 54 m (177 ft) | 18 | 2012 | Waterloo |
Luxe [24] | 54 m (177 ft) | 17 | 2012 | Waterloo | |
47 | Kitchener City Hall [25] | 53 m (174 ft) | 10 | 1993 | Kitchener |
The Galleria [26] | 53 m (174 ft) | 11 | - | Kitchener | |
260 Regina Street North [27] | 53 m (174 ft) | 17 | - | Kitchener | |
50 | 128 King St N | 52 m | 16 | Waterloo | |
51 | Preston House [28] | 51 m (167 ft) | 17 | 2012 | Waterloo |
Black Forest Condominium [29] | 51 m (167 ft) | 18 | - | Cambridge | |
Richmond Square South [30] | 51 m (167 ft) | 18 | - | Waterloo | |
Richmond Square North [31] | 51 m (167 ft) | 18 | - | Waterloo | |
203 Lester Street [32] | 51 m (167 ft) | 18 | - | Waterloo | |
56 | Queen Margaret Place I [33] | 50 m (164 ft) | 18 | - | Kitchener |
Queen Margaret Place II [34] | 50 m (164 ft) | 18 | - | Kitchener | |
58 | The Westview | 18 | 1994 | Kitchener | |
Green Valley Place | 18 | - | Kitchener | ||
Wilson Place I [35] | - | 18 | 2003 | Kitchener | |
Station Park Union Towers T1 | 18 | 2022 | Kitchener | ||
62 | Wilson Place II [35] | 61 m (200 ft)(estimate) | 18 | 2004 | Kitchener |
The Westmount [36] | 61 m (200 ft)(estimate) | 18 | - | Kitchener | |
64 | 171-191 Lester Street [37] | 53 m (174 ft) | 17 | 2014 | Waterloo |
65 | Waterpark Place West [38] | 51 m (167 ft) | 16 | 1988 | Waterloo |
66 | Laurentian Park Towers [39] | 50 m (164 ft) | 16 | - | Kitchener |
67 | Alexandrian Apartments [40] | 46 m (151 ft) (estimate) | 16 | - | Kitchener |
200 Old Carriage Drive - Building A [41] | 46 m (151 ft) | 16 | - | Kitchener | |
200 Old Carriage Drive - Building B [41] | 46 m (151 ft) | 16 | - | Kitchener | |
345 King Street North [42] | 46 m (151 ft) | 15 | 2010 | Waterloo | |
71 | Westmount Grand [43] | 44 m (144 ft) | 12 | 2012 | Waterloo |
72 | Dana Porter Arts Library | 43 m (141 ft) | 10 | 1964 (Renov. 1970) | Waterloo |
73 | Oxlea Tower [44] | 40 m (131 ft)(estimate) | 12 | - | Kitchener |
74 | Waterscape on the Grand River [45] | 38 m (125 ft) | 12 | 2011 | Cambridge |
75 | Sage Condos VI [46] | - | 12 | Waterloo | |
76 | Commerce House [47] | 37 m (121 ft)(estimate) | 11 | - | Kitchener |
77 | Ophelia | 11 | 2023 | Kitchener | |
78 | Breithaupt Block Phase 3 | 11 | 2023 | Kitchener |
The following lists are split up by city due to the vast number of projects that have been proposed and are under construction.
Kitchener has two lists one for projects that are official (OPA/ZBA/SPA) and another that is for publicly rumored projects, for example developer lobbying from Growing Together, or renders from a developers website.
Building | Notes | Height | Floors | Render |
---|---|---|---|---|
The Inclusive on Courtland Tower 1 | Spotlight Developments was behind this project, Spotlight went into receivership and had to sell the land. Vive ended up picking up the property for 22.75 million dollars. The total unit count has now changed significantly with Litt (CEO) has stated 5 towers around 35 floors. | 35 | ||
The Inclusive on Courtland Tower 2 | See Tower 1 | 35 | ||
The Inclusive on Courtland Tower 3 | See Tower 1 | 35 | ||
The Inclusive on Courtland Tower 4 | See Tower 1 | 35 | ||
The Inclusive on Courtland Tower 5 | See Tower 1 | 35 | ||
300-400 King St W Tower 1 | These properties are lobbied through Growing Together for Hallman Construction and an unnamed partner company. | 55 | ||
300-400 King St W Tower 2 | See Tower 1 | 50 | ||
864 King St W Tower B | This property is owned by Vive, During Growing Together they lobbied to get SPA 4 zoning on this property which displayed a site plan with 4 buildings, the first building has a publicly facing application so it can be found in the Official Projects section. | 55 | ||
864 King St W Tower C | See 864 King St W Tower B | 38 | ||
864 King St W Tower D | See 864 King St W Tower B | 16 | ||
659-667 King St W Tower 1 | This property is owned by HIP developments, HIP lobbied this project through Growing Together, the property extends to include the properties along Walter St via Purchase of Sale agreements and representation agreements | 30 | ||
659-667 King St W Tower 2 | See Tower 1 | 26 | ||
46-56 College St | Vive made a submission for this property during Growing Together, presumably Vive will redevelop it at some point but there are existing units on site already so it's years out if anything does happen. | 32 | ||
698-710 Charles St | Vive made a submission for this property during Growing Together | 36 | ||
58-64 Weber St W | Vive made a submission for this property during Growing Together, the analysis provided is for SGA 4 compliance up to 36 floors | 32 | ||
85 Weber St & 60-66 College St | A 32 floor building was contemplated during pre submission conversations with the city and Growing Together, there are two unnamed companies pursuing the redevelopment | 32 | ||
924-944 King St W | 1000100206 Ontario and 1000187534 Ontario lobbied these properties during Growing Together for a 30 floor building | 30 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 1 | This is a large project proposed via Growing Together containing 7 towers ranging in heights from 25 to 46 floors. The developer is "Rockway Holdings" which appears to be related to Momentum Developments and E&E Seegmiller. The concept is expected to include Residential, LTC/Assisted Living, Commercial, Hotel and institutional | 25 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 2 | See Tower 1 | 34 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 3 | See Tower 1 | 40 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 4 | See Tower 1 | 46 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 5 | See Tower 1 | 46 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 6 | See Tower 1 | 32 | ||
669-705 Charles St & 48 Preston St & 63-69 Sydney St Tower 7 | See Tower 1 | 36 | ||
115 Benton St | A 25 floor building contemplated by 1001235 Ontario LTD through Growing Together | 25 | ||
King/Ontario/Duke/City Center block | A 37 floor development is contemplated here via Growing Together, the first phase of the project (45 Duke St) already has SPA, the developer is Tony Di Batista | 37 | ||
51 Benton | A 16 floor development proposed through Growing Together, unnamed developer | 16 | ||
1122 King St E | MG Urban Developments was working through the confidential side of the ZBA/OPA process when Growing Together started, with the new Growing Together bylaws the property is conformant so there is no need for a ZBA/OPA anymore so that has been retracted and will only require SPA | 25 | ||
178-202 Queen St S | This is a development that Zehr Group was lobbying for in Growing Together, its 52 floors with 495 units. | 170 | 52 | |
Vic Station | Vic Station is a development concept proposed by Valour Group at 751 Victoria St S, it still has to go through ZBA, OPA and SPA. | 23 |
Area of Kitchener | Building | Notes | Height | Floors | Construction Photo/Renders |
---|---|---|---|---|---|
Borden Station MTSA | 50 Borden Tower 1 | Units: 1224 (Tower 1 and 2) Year Started: Developer: Vive and Woodhouse Group Status: Proposed, currently at ZBA/OPA | 187m | 57 | |
Borden Station MTSA | 50 Borden Tower 2 | Units: 1224 (Tower 1 and 2) Year Started: Developer: Vive and Woodhouse Group Status: Proposed, currently at ZBA/OPA | 168m | 51 | |
Central Station MTSA | Station Park Tower E | Units: 535 Year Started: Developer: VanMar Status: Site Plan Approved | 185m | 50 | |
Central Station MTSA | Station Park Tower D | Units: 534 Year Started: Developer: VanMar Status: Site Plan Approved, Permits applied | 136m | 43 | |
Central Station MTSA | Station Park Tower C | Units: 443 Year Started: Developer: VanMar Status: Under Construction | 115m | 36 | |
Central Station MTSA | 417 King St W | Units: 622 Year Started: Developer: VanMar Status: Site Plan Approved | 180m | 55 | |
Grand River Hospital MTSA | 864 King West Tower A | Units: 455 Year Started: Developer: Vive Status: Under Construction (Shoring Permit issued) | 45 | ||
Central Station MTSA | 200 Victoria St S | Units: 466 Year Started: Developer: Rome Logistics Status:OPA/ZBA Approved | 152m | 45 | |
10 Duke St W | Units: Year Started: Developer: VanMar Status: Site Plan Approved | 147m | 45 | ||
Central Station MTSA | TEK Tower | Units: 532 Year Started: 2022 Developer: IN8 Status: Under Construction | 146m | 45 | |
26 Charles St W | Units: Year Started: Developer: IN8 Status: Site Plan Approved | 146m | 44 | ||
88 Queen St S | Units: Year Started: Developer: IN8 Status: Site Plan Approved | 143m | 44 | ||
Mill Station MTSA | 459 Mill St Tower B | Units: 1500 (Towers A-E) Year Started: Developer: Polocorp Status: Site Plan Approved | 144m | 44 | |
Mill Station MTSA | 459 Mill St Tower C | Units: 1500 (Towers A-E) Year Started: Developer: Polocorp Status: Site Plan Approved | 131m | 40 | |
Central Station MTSA | Victoria and Park Tower A | Units: 1124 (Towers A-C) Year Started: Developer: Dov Capital Status: Site Plan Approved | 129m | 38 | |
Victoria and Park Tower B | Units: 1124 (Towers A-C) Year Started: Developer: Dov Capital Status: Site Plan Approved | 125m | 36 | ||
787 King St E Tower A | Units: 932 (Towers A and B) Year Started: Developer: Lindvest Status: Site Plan Approved | 37 | |||
Q Condos | Units: 238 Year Started: Developer: Momentum Status: Site Plan Approved | 114m | 34 | ||
459 Mill St Tower A | Units: 1500 (Towers A-E) Year Started: Developer: Polocorp Status: Site Plan Approved | 105m | 32 | ||
Lower Kitchener | Units: 514 Year Started: 2024 Developer: Vive Status: Under Construction | 100m | 30 | ||
459 Mill St Tower D | Units: 1500 (Towers A-E) Year Started: Developer: Polocorp Status: Site Plan Approved | 51m | 15 | ||
459 Mill St Tower E | Units: 1500 (Towers A-E) Year Started: Developer: Polocorp Status: Site Plan Approved | 70m | 21 | ||
Victoria and Park Tower C | Units: 1124 (Tower A-C) Year Started: Developer: Dov Capital Status: Site Plan Approved | 90m | 25 | ||
East Gate (20 Ottawa St N) | Units: Year Started: Developer: Zehr Status: Site Plan Approved | 85m | 26 | ||
332 Charles St E | Units: 279 Year Started: Developer: Vive Status: Site Plan Approved | 27 | |||
10 College St | Units: 223 Year Started: Developer: Status: Site Plan Approved | 24 | |||
149 Ontario St | Units: 230 Year Started: Developer: Status: Site Plan Approved | 27 | |||
22 Weber St E | Units: Year Started: Developer: Status: Proposed (OLT) | 19 | |||
3241 King St E Tower A | Units: 982 (Towers A-C) Year Started: 2023 Developer: Vive Status: Under Construction | 24 | |||
3241 King St E Tower B | Units: 982 (Towers A-C) Year Started: Developer: Vive Status: Site Plan Approved | 23 | |||
3241 King St E Tower C | Units: 982 (Towers A-C) Year Started: Developer: Vive Status: Site Plan Approved | 19 | |||
787 King St E Tower B | Units: 932 (Towers A and B) Year Started: Developer: Lindvest Status: Site Plan Approved | 33 | |||
4396 King St E Tower A | Units: 597 (Towers A-C) Year Started: Developer: Status: OPA/ZBA Approved | 30 | |||
4396 King St E Tower B | Units: 597 (Towers A-C) Year Started: Developer: Status: OPA/ZBA Approved | 18 | |||
4396 King St E Tower C | Units: 597 (Towers A-C) Year Started: Developer: Status: OPA/ZBA Approved | 8 | |||
4220 King St E Tower A | Units: 526 (Towers A-C) Year Started: Developer: Tricar Status: Site Plan Approved | 14 | |||
4220 King St E Tower B | Units: 526 (Towers A-C) Year Started: 2023 Developer: Tricar Status: Under Construction | 18 | |||
4220 King St E Tower C | Units: 526 (Towers A-C) Year Started: Developer: Tricar Status: Site Plan Approved | 15 | |||
495 Huron Rd | Units: 148 Year Started: Developer: Activa Status: Site Plan Approved | 10 | |||
Woodside Terraces Tower 3 | Units: 211 Year Started: Developer: Vive Status: OPA/ZBA Approved | 17 | |||
1770 King St E | Units: 503 Year Started: Developer: Vive Status: OPA/ZBA Approved | 27 | |||
660 Belmont Avenue | Units: 121 Year Started: Developer: Zehr Status: Site Plan Approved | 11 | |||
2934 King St E | Units: 77 Year Started: Developer: Status: OPA/ZBA Approved | 36m | 11 | ||
528 Lancaster Tower B | Units: 1154 (Towers B-E) Year Started: Developer: Vive/Corley Status: OPA/ZBA Approved | 12 | |||
528 Lancaster Tower C | Units: 1154 (Towers B-E) Year Started: Developer: Vive/Corley Status: OPA/ZBA Approved | 34 | |||
528 Lancaster Tower D | Units: 1154 (Towers B-E) Year Started: Developer: Vive/Corley Status: OPA/ZBA Approved | 26 | |||
528 Lancaster Tower E | Units: 1154 (Towers B-E) Year Started: Developer: Vive/Corley Status: OPA/ZBA Approved | 18 | |||
15 Dellroy | Units: 231 Year Started: 2024 Developer: Savic Homes Status: Under Construction | 18 | |||
1200 Fischer-Hallman Rd | Units: 313 Year Started: Developer: Zimmer Status: Approved | 105m | 34 | ||
490 Huron Road Tower 1 | This project has changed significantly since these heights were in place, needs to be updated | 17 | |||
490 Huron Road Tower 2 | 13 | ||||
490 Huron Road Tower 3 | 13 | ||||
1668 King St E Tower 1 | Units: 616 (Towers 1 and 2) Year Started: Developer: Vive Status: Proposed | 25 | |||
1668 King St E Tower 2 | Units: 616 (Towers 1 and 2) Year Started: Developer: Vive Status: Proposed | 24 | |||
1295 Bleams Rd | Units: 202 Year Started: 2024 Developer: Grandview Homes Status: Under Construction | 13 | |||
1198 Fischer-Hallman Rd T1 | Units: 373 (Tower 1 and 2) Year Started: Developer: Activa Status: OPA/ZBA Approved | 14 | |||
1198 Fischer-Hallman Rd T2 | Units: 373 (Tower 1 and 2) Year Started: Developer: Activa Status: OPA/ZBA Approved | 22 | |||
1314 Fischer-Hallman Rd T1 | Units: Year Started: Developer: Starlight Investments Status: OPA/ZBA Approved | 11 | |||
1314 Fischer-Hallman Rd T2 | Units: Year Started: Developer: Starlight Investments Status: OPA/ZBA Approved | 11 | |||
1314 Fischer-Hallman Rd T3 | Units: Year Started: Developer: Starlight Investments Status: OPA/ZBA Approved | 12 | |||
1157 Weber St E Tower 1 | Units: 378 (Towers 1 and 2) Year Started: Developer: Zehr Status: OPA/ZBA Approved | 19 | |||
1157 Weber St E Tower 2 | Units: 378 (Towers 1 and 2) Year Started: Developer: Zehr Status: OPA/ZBA Approved | 17 | |||
130 Victoria St S | Units: 249 Year Started: Developer: Status: OPA/ZBA Approved | 80m | 25 | ||
1593 Highland Rd W T1 | Units: 403 Year Started: Developer: Status: OPA/ZBA Approved | 16 | |||
1593 Highland Rd W T2 | Units: 403 Year Started: Developer: Status: OPA/ZBA Approved | 13 | |||
1438 Highland Rd W | Units: 127 Year Started: Developer: Savic Homes Status: Complete | 12 | |||
1442 Highland Rd W | Units: 215 Year Started: 2023 Developer: Savic Homes Status: Under Construction | 17 | |||
Borden Station MTSA | 1253 King St E Tower A | Units: 408 (Towers A and B) Year Started: Developer: Vive Status: OPA/ZBA Approved | 27 | ||
Borden Station MTSA | 1253 King St E Tower B | Units: 408 (Towers A and B) Year Started: Developer: Vive Status: OPA/ZBA Approved | 8 | ||
Five Point (197 Frederick) | Units: 134 Year Started: Developer: Rome Logistics Status: Site Plan Approved | 36m | 10 | ||
45 Duke St W | Units: 127 Year Started: Developer: Tony Di Batista Status: Site Plan Approved | 21 | |||
Market Station MTSA | Vertikal Tower 1 | Units: 488 (Tower 1 and 2) Year Started: 2019 Developer: Drewlo Status: Under Construction | 18 | ||
Market Station MTSA | Vertikal Tower 2 | Units: 488 (Tower 1 and 2) Year Started: 2019 Developer: Drewlo Status: Under Construction | 22 | ||
Grand River Hospital MTSA | 900 King St W | Units: 231 Year Started: 2023 Developer: Cantiro Status: Under Construction | 79.5m | 25 | |
Grand River Hospital MTSA | Bright Building | Units: 228 Year Started: 2021 Developer: HIP Status: Complete | 18 | ||
Mill Station MTSA | The Metz Tower D | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 72m | 20* | |
Mill Station MTSA | The Metz Tower E | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 66m | 18* | |
Mill Station MTSA | The Metz Tower F | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 78m | 22* | |
Mill Station MTSA | The Metz Tower G | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 87m | 25* | |
Mill Station MTSA | The Metz Tower H | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 130m | 38 | |
Mill Station MTSA | The Metz Tower I | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 65m | 18 | |
Mill Station MTSA | The Metz Tower J | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 72m | 20 | |
Mill Station MTSA | The Metz Tower M | Units: 3985 (Towers A-M) Year Started: Developer: Auburn Status: Site Plan Approved, Towers A-C are U/C but are too short for this list | 58m | 16 | |
93-99 Benton | Units: 99 Year Started: Developer: Ideal Capital Status: Site Plan Approved (Via OLT) | 45m | 13 | ||
83 Weber St E | Units: 336 Year Started: Developer: Vive Status: Site Plan Approved but at OLT for Growing Together | 76.5m | 25 |
*The heights of "The Metz" buildings have increased but the information on how tall is not yet public, what is known is that the buildings will not be taller than 38 floors. [48] Within the City Council meeting the developer stated buildings D-G will be getting the height increases (combined to be 40 stories of increase).
Building | Height | Floors | Units | Year Started | Status | Photo | Developer |
---|---|---|---|---|---|---|---|
36 Erb St E | 22 | 234 | Approved | ||||
115 Erb St E | 40m | 12 | 89 | Approved/Cancelled | |||
Isabella Residence | 11 | 59 | Approved | ||||
109 Bridgeport Rd E Tower A | 25 | Proposed | |||||
109 Bridgeport Rd E Tower B | 24 | Proposed | |||||
109 Bridgeport Rd E Tower C | 22 | Proposed | |||||
Society 145 Tower 1 | 23 | Under Construction | |||||
Society 145 Tower 2 | 23 | Under Construction | |||||
414 Westhaven Tower A | 13 | Proposed | |||||
414 Westhaven Tower B | 13 | Proposed | |||||
20 University Avenue E | 25 | 260 | Proposed | ||||
308 King St N | 25 | 340 | Under Construction | Prica | |||
316 King St N (addition) | 14 | 99 | Approved | ||||
87 Regina St S | 25 | 216 | Proposed (In active application) | ||||
6 Dietz Avenue N | 13 | 135 | Proposed | Copper Bay Homes | |||
6 Regina and 24 Erb St E | 18 | 218 | Proposed | Vanmar & Urban Legend | |||
Strata | 25 | Approved | |||||
King and John | 26 | 338 | Proposed | ||||
Sunlife T1 | 22 | Approved | |||||
Sunlife T2 | 22 | Approved | |||||
143 Columbia T1 | 25 | Proposed | |||||
143 Columbia T2 | 25 | Proposed | |||||
143 Columbia T3 | 25 | Proposed | |||||
Drewlo Waterloo T1 | 28 | Proposed | Drewlo | ||||
Drewlo Waterloo T2 | 24 | Proposed | Drewlo | ||||
Drewlo Waterloo T3 | 25 | Proposed | Drewlo | ||||
Drewlo Waterloo T4 | 21 | Proposed | Drewlo | ||||
Drewlo Waterloo T5 | 16 | Proposed | Drewlo | ||||
Drewlo Waterloo T6 | 22 | Proposed | Drewlo | ||||
Drewlo Waterloo T7 | 16 | Proposed | Drewlo | ||||
Drewlo Waterloo T8 | 16 | Proposed | Drewlo | ||||
435 King St N T1 | 35 | Proposed | |||||
435 King St N T2 | 28 | Proposed | |||||
435 King St N T3 | 23 | Proposed | |||||
435 King St N T4 | 25 | Proposed | |||||
435 King St N T5 | 31 | Proposed | |||||
435 King St N T6 | 23 | Proposed | |||||
435 King St N T7 | 25 | Proposed | |||||
435 King St N T8 | 20 | Proposed | |||||
435 King St N T9 | 23 | Proposed | |||||
435 King St N T10 | 12 | Proposed | |||||
435 King St N T11 | 20 | Proposed | |||||
435 King St N T12 | 18 | Proposed | |||||
435 King St N T13 | 25 | Proposed | |||||
525 Conestogo Rd T1 | 24 | Approved | |||||
525 Conestogo Rd T4 | 35 | Approved | |||||
525 Conestogo Rd T5 | 19 | Approved | |||||
525 Conestogo Rd T7 | 15 | Approved | |||||
525 Conestogo Rd T8 | 15 | Approved | |||||
525 Conestogo Rd T9 | 19 | Approved | |||||
525 Conestogo Rd T11 | 22 | Approved | |||||
525 Conestogo Rd T12 | 22 | Approved | |||||
525 Conestogo Rd T15 | 20 | Approved | |||||
Westmount Place T1 | 11 | Proposed | |||||
Westmount Place T2 | 11 | Under Construction | |||||
Westmount Place T3 | 18 | Proposed | |||||
Westmount Place T4 | 18 | Proposed | |||||
Westmount Place T5 | 16 | Proposed | |||||
Westmount Place T6 | 25 | Proposed | |||||
Barrel Yards -The Staves | 73m | 22 | Completed [49] | Auburn | |||
Barrel Yards T6 | 18 | Under Construction | Auburn | ||||
31 Alexandra Ave | 14 | Proposed | Auburn |
Building | Height | Floors | Units | Year Started | Status | Photo | Developer |
---|---|---|---|---|---|---|---|
193 Water St Tower 1 | 15 | Approved | LJM | ||||
193 Water St Tower 2 | 15 | Approved | LJM | ||||
193 Water St Tower 3 | 15 | Approved | LJM | ||||
193 Water St Tower 4 | 15 | Approved | LJM | ||||
193 Water St Tower 5 | 15 | Approved | LJM | ||||
61 Ainsle Tower A | 20 | Proposed | |||||
61 Ainsle Tower B | 16 | Proposed | |||||
55 Kerr Tower A | 18 | Approved | |||||
55 Kerr Tower B | 18 | Approved | |||||
725 Main St | 12 | 254 | Proposed | ||||
217 Hespeler Rd Tower A | 17 | Proposed | |||||
217 Hespeler Rd Tower B | 13 | Proposed | |||||
506 Hespeler Rd Tower 1 | 20 | Proposed | |||||
506 Hespeler Rd Tower 2 | 20 | Proposed | |||||
506 Hespeler Rd Tower 3 | 20 | Proposed | |||||
506 Hespeler Rd Tower 4 | 20 | Proposed | |||||
506 Hespeler Rd Tower 5 | 20 | Proposed | |||||
255 King St W Tower 1 | 17 | Approved | |||||
255 King St W Tower 2 | 18 | Approved | |||||
255 King St W Tower 3 | 15 | Approved | |||||
410 Queen St W Tower 1 | 12 | Proposed | |||||
410 Queen St W Tower 2 | 12 | Proposed | |||||
410 Queen St W Tower 3 | 12 | Proposed | |||||
410 Queen St W Tower 4 | 12 | Proposed | |||||
410 Queen St W Tower 5 | 12 | Proposed | |||||
410 Queen St W Tower 6 | 16 | Proposed | |||||
410 Queen St W Tower 7 | 28 | Proposed | |||||
410 Queen St W Tower 8 | 27 | Proposed | |||||
410 Queen St W Tower 9 | 28 | Proposed | |||||
410 Queen St W Tower 10 | 30 | Proposed | |||||
Cambridge Mill Tower 1 (Hotel) | 143m | 37 | Approved | ||||
Cambridge Mill Tower 2 (Condo) | 112m | 28 | Approved | ||||
0 Main St Building A | 12 | Proposed | |||||
0 Main St Building B | 10 | Proposed |