Mackenzie Valley Pipeline

Last updated
Mackenzie Valley Pipeline
Location
Country Canada
General directionnorth–south
From Mackenzie Valley
Passes through Fort Simpson, Northwest Territories
To Alberta
General information
Typenatural gas
Partners Imperial Oil, The Aboriginal Pipeline Group, ConocoPhillips, Shell Canada, ExxonMobil
Construction started2010
Expected2014
Technical information
Length758 mi (1,220 km)
Maximum discharge18.5 billion cubic meters per year

The Mackenzie Valley Pipeline, also called the Mackenzie River Pipeline, was a proposed project to transport natural gas from the Beaufort Sea through Canada's Northwest Territories to tie into gas pipelines in northern Alberta. The project was first proposed in the early 1970s but was scrapped following an inquiry conducted by Justice Thomas Berger. The project was resurrected in 2004 with a new proposal to transport gas through the sensitive arctic tundra. Probabilistic estimates of hydrocarbons in the Mackenzie Delta and Beaufort Sea regions project that there are natural gas reserves of 1.9 trillion cubic metres (67×10^12 cu ft). [1] After many delays, the project was officially abandoned in 2017 by the main investment partners citing natural gas prices and the long regulatory process. [2]

Contents

History

The prospect of a pipeline bringing the natural gas to North American energy markets was originally analyzed in the 1970s with the Mackenzie Valley Pipeline Inquiry. During that inquiry, Justice Berger heard testimony from diverse groups with an interest in the pipeline. The inquiry was notable for the voice it gave to the First Peoples whose traditional territory the pipeline would traverse. Berger stated that a pipeline should be postponed for 10 years, estimating that it would take this long for land claims to be settled and for First Peoples to be ready for the impact of such a project. [3] Before the Trudeau government could act on Berger's report, it was defeated at the polls in 1979. The short-lived government of Joe Clark also failed to act on the report. When the Liberal government was re-elected in 1980, it approved construction of an oil pipeline from Norman Wells to Zama, Alberta, through Dehcho territory where land claims have yet to be settled.

Exploration continued at a steady pace and by 1995 there were over 1,900 wells above the 60th parallel. In addition, aboriginal groups settled numerous land claims. The Inuvialuit settled the first land claim in 1984, followed by the Sahtu and Gwichʼin. By the late 1990s, companies once again seriously considered a pipeline. The Canadian government sold mineral claim rights, leading to C$400 million in bids and over C$1 billion in work commitments.

With the first wave of land claims settled, negotiations began between oil and gas companies and local aboriginal groups. These negotiations proved successful in October 2001, when ConocoPhillips, Shell, ExxonMobil, and Imperial Oil signed a Memorandum of Understanding with the Aboriginal Pipeline Group. The APG was formed to represent the Inuvialuit, Sahtu, and Gwichʼin. The Memorandum of Understanding offered the APG a financial stake in the pipeline. [4]

On June 19, 2003, the Aboriginal Pipeline Group, and TransCanada Corp. signed an agreement giving the aboriginal groups of the Northwest Territories one-third ownership of the pipeline project. [5]

On 11 March 2011, the Mackenzie Valley pipeline was granted federal cabinet approval. The National Energy Board granted a Certificate of Public Convenience and Necessity. [6]

By 2016, the projected cost of the pipeline had grown to almost $16 billion. [2] Despite the fact that a consortium of companies had permits that allowed them to build until 2022, [7] due to a combination of factors such as the growing extraction of cheaper natural gas sources in North America and the regulatory approval far outpacing the expected timeline, the joint-venture partnership led by Imperial Oil announced the abandonment of the project in 2017. [2]

Technical description

The capacity of the pipeline is predicted to be 18.5 billion cubic metres per annum (650×10^9 cu ft/a). [8] It will be 758 miles (1,220 km) long and the cost of the project is estimated at C$16.2 billion. [9] [10] As of mid-March 2007, revised cost and schedule information included C$3.5 billion for the gas-gathering system, C$7.8 billion for the pipeline, and C$4.9 billion to other economic growth projects planned for three gas field sites in the Mackenzie River delta. [11] 2010, and also 2014 at the earliest, are current production and start-up milestones published for printed newsletters and on-line webpage articles of the pipeline project. [12]

Route

The pipeline would go south through the Mackenzie Valley to Fort Simpson and then continue south to Alberta. Once in Alberta, the pipeline would feed into the existing pipeline infrastructure.

Pipeline consortium

The pipeline consortium consists of Imperial Oil (34.4%), The Aboriginal Pipeline Group (33.3%), ConocoPhillips Canada (North) Limited (15.7%), Shell Canada Limited (11.4%) and ExxonMobil Canada Properties (5.2%). [10] A notable feature of the current proposal is the participation of First Nations through the Aboriginal Pipeline Group. The APG has the opportunity to acquire a one third interest in the pipeline. Four oil companies: Imperial Oil of Canada, ConocoPhillips Canada (North) Limited, Shell Canada Limited and ExxonMobil Canada Properties, hold the interest in the oil fields, a gathering plant at Inuvik, a liquids pipeline from the facility near Inuvik, to Norman Wells and a two-thirds interest in the pipeline.

TransCanada Corp. does not have a direct stake in the project but is earning a share in the line through financial support for the Aboriginal Pipeline Group. There are speculations that the company was poised to take control of the project. [13]

Environmental concerns

The pipeline project has raised concerns by environmental groups. The Boreal Forest Conservation Framework calls for protection of fifty percent of the 6,000,000 square kilometres (2,300,000 sq mi) of boreal forest (of which the Mackenzie Valley is a part) in Canada's north. [14] Groups such as the World Wildlife Fund of Canada are pointing out that in the Northwest Territories' Mackenzie Valley, only five of the 16 ecoregions that are directly intersected by the proposed major gas pipeline or adjacent hydrocarbon development areas are reasonably represented by protected areas. [15]

The Sierra Club of Canada opposed the pipeline due to its perceived environmental impacts such as fragment intact of boreal forests along the Mackenzie River and damage of habitat for species such as Woodland Caribou and Grizzly bear. Sierra Club also argues that Mackenzie gas is slated to fuel further development of Alberta's Oil sands, which they claim produces the most damaging type of oil for the global atmosphere, through another pipeline to Fort McMurray. [16] The Pembina Institute argues that carbon dioxide from the Mackenzie gas project and the fuel's end use would push Canada's greenhouse gas emissions 10% further away from its Kyoto Protocol commitment. [17]

Relation to other projects

Although some[ who? ] consider[ clarification needed ] the Mackenzie Valley Pipeline to be in competition with the Alaskan Natural Gas Pipeline, the two projects will access different natural gas fields.[ citation needed ] While the Alaska pipeline will access gas fields in Alaska's North Slope, the Mackenzie Gas Project will provide North America with access to Canadian Arctic gas from the Beaufort Sea and Mackenzie Delta. Construction of the Mackenzie Gas Project will also create a major trunk line through NWT which will make it feasible to tap into additional natural gas fields on the NWT mainland, which are currently stranded. Mackenzie will connect with Alberta's existing and extensive pipeline infrastructure, which will allow distribution across Canada and to most major U.S. markets.

In light of Canadian and U.S. policies aimed at shifting to cleaner fuel sources and reducing reliance on oil imported from overseas, it is anticipated that North American natural gas demand will steadily grow in the future. It is therefore expected that both the Mackenzie Gas Project and the Alaska Gas Pipeline will be required in order to meet continental energy demands.[ neutrality is disputed ]

Economics

When the pipeline project was revived, North American gas prices were high, peaking at $15.38 per million British thermal units ($52.5/ MWh ) in December 2005, but by the time it had been approved prices had dropped to $4.57 per million British thermal units ($15.6/MWh), [18] as a result of a gas glut in the United States because of increased shale gas production. That puts the economics of the project in doubt.

Related Research Articles

<span class="mw-page-title-main">Mackenzie River</span> Largest river system in Canada

The Mackenzie River is a river in the Canadian boreal forest. It forms, along with the Slave, Peace, and Finlay, the longest river system in Canada, and includes the second largest drainage basin of any North American river after the Mississippi.

<span class="mw-page-title-main">Athabasca oil sands</span> Oil and bitumen deposits in Alberta, Canada

The Athabasca oil sands, also known as the Athabasca tar sands, are large deposits of bitumen, a heavy and viscous form of petroleum, located in northeastern Alberta, Canada. These reserves are one of the largest sources of unconventional oil in the world, making Canada a significant player in the global energy market.

The Shtokman field, one of the world's largest natural gas fields, lies in the northwestern part of the South Barents Basin in the Russian sector of the Barents Sea, 600 kilometres (370 mi) north of Kola Peninsula. Its reserves are estimated at 3.8 trillion cubic metres of natural gas and more than 37 million tons of gas condensate.

The Mackenzie Valley Pipeline Inquiry, also known as the Berger Inquiry after its head Justice Thomas Berger, was commissioned by the Government of Canada on March 21, 1974, to investigate the social, environmental, and economic impact of a proposed gas pipeline that would run through the Yukon and the Mackenzie River Valley of the Northwest Territories. This proposed pipeline became known as the Mackenzie Valley Pipeline.

Kashagan Field is an offshore oil field in Kazakhstan's zone of the Caspian Sea. The field, discovered in 2000, is located in the northern part of the Caspian Sea close to Atyrau and is considered the world's largest discovery in the last 30 years, combined with the Tengiz Field. When discovered, it was the second largest oil field in the world.

The Alaska gas pipeline is a joint project of TransCanada Corp. and ExxonMobil Corp. to develop a natural gas pipeline under the AGIA, a.k.a. the Alaska Gas Inducement Act, adopted by Alaska Legislature in 2007. The project originally proposed two options during its open season offering over a three-month period from April 30 to July 30, 2010. An 'open season' in layman's terms is when a company conducts a non-binding show of interest or poll in the marketplace, they ask potential customers "if we build it, will you come?".

<span class="mw-page-title-main">South Caucasus Pipeline</span>

The South Caucasus Pipeline is a natural gas pipeline from the Shah Deniz gas field in the Azerbaijan sector of the Caspian Sea to Turkey. It runs parallel to the Baku–Tbilisi–Ceyhan pipeline (oil).

<span class="mw-page-title-main">Gasunie</span> Dutch natural gas company

N.V. Nederlandse Gasunie is a Dutch natural gas infrastructure and transportation company operating in the Netherlands and Germany. Gasunie owns the Netherlands gas transmission network with a total length of over 12,000 kilometres (7,500 mi) and 3,100 kilometres (1,900 mi) long network in Germany.

<span class="mw-page-title-main">Petroleum exploration in the Arctic</span> Industry in the Arctic

Exploration for petroleum in the Arctic is expensive and challenging both technically and logistically. In the offshore, sea ice can be a major factor. There have been many discoveries of oil and gas in the several Arctic basins that have seen extensive exploration over past decades but distance from existing infrastructure has often deterred development. Development and production operations in the Arctic offshore as a result of exploration have been limited, with the exception of the Barents and Norwegian seas. In Alaska, exploration subsequent to the discovery of the Prudhoe Bay oilfield has focussed on the onshore and shallow coastal waters.

<span class="mw-page-title-main">Kearl Oil Sands Project</span>

The Kearl Oil Sands Project is an oil sands mine in the Athabasca Oil Sands region at the Kearl Lake area, about 70 kilometres (43 mi) north of Fort McMurray in Alberta, Canada that is operated by the 143-year old Calgary, Alberta-headquartered Imperial Oil Limited—one of the largest integrated oil companies in Canada. Kearl is owned by Imperial Oil and is controlled by Imperial's parent company, ExxonMobil—an American multinational that is one of the largest in the world.

The national holding company Uzbekneftegaz is a state-owned holding company of Uzbekistan's oil and gas industry.

<span class="mw-page-title-main">History of the petroleum industry in Canada (frontier exploration and development)</span>

Canada's early petroleum discoveries took place near population centres or along lines of penetration into the frontier.

Angola LNG is a liquid natural gas (LNG) facility in Soyo, Angola.

Liquid Niugini LNG is a natural gas liquefaction project in Papua New Guinea. It is developed by Liquid Niugini Gas Ltd, and owned by PNG LNG Inc., a Bahamas-based parent holding company.

This page summarizes projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market, with the first production of fuel beginning in 2013. This is part of the Wikipedia summary of oil megaprojects.

The Shell Scotford Upgrader is an oilsand upgrader, a facility which processes crude bitumen from oil sands into a wide range of synthetic crude oils. The upgrader is owned by Athabasca Oil Sands Project (AOSP), a joint venture of Shell Canada Energy (60%), Marathon Oil Sands L.P. (20%) and Chevron Canada Limited (20%). The facility is located in the industrial development of Scotford, just to the northeast of Fort Saskatchewan, Alberta in the Edmonton Capital Region.

The Rockies Express Pipeline is a 1,679-mile (2,702 km) long high-pressure natural gas pipeline system from the Rocky Mountains of Colorado to eastern Ohio. The pipeline system consists of three sections running through eight states. It is one of the largest natural gas pipelines ever built in North America.

Pembina Pipeline is a Canadian corporation that operates transportation and storage infrastructure delivering oil and natural gas to and from parts of Western Canada. Since 2003, storage has also included ethylene at one location. Western Canada is the source of all products transported by Pembina pipeline systems which include the Syncrude pipeline, Horizon pipeline, and Cheecham oilsands pipelines.

<span class="mw-page-title-main">East-Prinovozemelsky field</span> Oil and gas field in the Kara Sea

The East-Prinovozemelsky field is a gigantic undeveloped Arctic oil and gas field located in the South Kara basin of the continental shelf of Russia, in the South Kara Sea between the Yamal Peninsula and Novaya Zemlya island. It is the continuation of the continental West Siberian hydrocarbon province.

<span class="mw-page-title-main">Gulf Canada</span> Canadian subsidiary of Gulf Oil

Gulf Canada was a Canadian integrated petroleum company that existed between 1944 and 2001. Gulf Oil Corporation began operating in Canada in 1942, and two years later formed a Canadian subsidiary called the Canadian Gulf Oil Company. In 1956 Canadian Gulf Oil merged with the British American Oil Company and until 1969 operated under the British American name. In 1969, British American amalgamated with its subsidiaries into a new company called Gulf Oil Canada Limited.

References

  1. Probabilistic Estimates of Hydrocarbon Volumes in the Mackenzie Delta and Beaufort Sea Discoveries (PDF). National Energy Board. 1998. ISBN   0-662-27455-5 . Retrieved 2008-06-14.
  2. 1 2 3 Strong, Walter (Dec 28, 2017). "Mackenzie Valley pipeline project officially one for the history books". CBC.
  3. Berger, Thomas (1977). Northern Frontier, Northern Homeland: The Report of the Mackenzie Valley Pipeline Inquiry: Volume One. Canada: Minister of Supply and Services Canada. p. 196. ISBN   0-660-00775-4. In my opinion a period of ten years will be required to in the Mackenzie Valley and Western Arctic to settle native claims, and to establish the new institutions and new programs that a settlement will entail. No pipeline should be built until these things have been achieved.... [T]he pipeline should be postponed for 10 years.
  4. "Aboriginal Pipeline Group". Aboriginal Pipeline Group. Archived from the original on 2006-08-31. Retrieved 2008-06-14.
  5. Lloyd Dolha. "Mackenzie Valley Pipeline Moves Forward". First Nations Drum. Archived from the original on 2003-08-12. Retrieved 2008-06-14.
  6. Zelinsky, Tonya (2011-03-11). "Mackenzie Valley pipeline approved" . Upstream Online . NHST Media Group. Retrieved 2011-03-13.
  7. "The $20 Billion Arctic Pipeline That Will Haunt Canada Forever". www.vice.com. Retrieved 2020-10-29.
  8. "MGM books Mackenzie pipe berth" . Upstream Online . NHST Media Group. 2007-10-15. Retrieved 2008-06-14.
  9. "The Mackenzie Valley pipeline". CBC News. 2007-03-12. Retrieved 2008-06-14.
  10. 1 2 "Delays for Canadian Arctic gas pipeline" . Upstream Online . NHST Media Group. 2008-05-16. Retrieved 2008-06-14.
  11. "Mackenzie Gas Update" (PDF). In Touch. 5 (1). Imperial Oil: 6. 2007. Archived from the original (PDF) on 2007-09-28. Retrieved 2008-06-14.
  12. "Project Phases and Scheduling" (PDF). January 2004. Retrieved 2008-06-14.
  13. "TransCanada chief coy on pipeline reports" . Upstream Online . NHST Media Group. 2007-12-13. Retrieved 2008-06-14.
  14. Nick Jans (2005-12-07). "Where conservation and development coexist". USA Today. Retrieved 2008-06-14.
  15. "Mackenzie Valley". WWF Canada. Archived from the original on 2008-05-23. Retrieved 2008-06-14.
  16. "Mackenzie Valley Pipeline and Alberta Tar Sands". Sierra Club of Canada National Office. Retrieved 2008-06-14.
  17. "Green group seeks Arctic pipeline ban" . Upstream Online . NHST Media Group. 2007-08-30. Retrieved 2008-06-14.
  18. "Why it's now or maybe never for Canada's proposed pipeline projects | Canada's top source for Alberta's business news – Alberta Venture". Archived from the original on 2012-10-11. Retrieved 2012-10-11.