Madushan Dam | |
---|---|
Official name | 红河马堵山水电站 (Honghe Madushan shuidianzhan) |
Country | China |
Location | Gejiu City and Jinping County, Honghe Prefecture, Yunnan Province |
Coordinates | 23°2′45.52″N103°17′4.79″E / 23.0459778°N 103.2846639°E Coordinates: 23°2′45.52″N103°17′4.79″E / 23.0459778°N 103.2846639°E |
Purpose | Power |
Status | Operational |
Construction began | 2007 |
Opening date | 2011 |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Honghe (Red) River |
Height | 105.5 m (346 ft) |
Reservoir | |
Total capacity | 551,000,000 m3 (446,703 acre⋅ft) |
Surface area | 19.2 km2 (7.4 sq mi) |
Madushan Hydropower Plant | |
Commission date | 2011 |
Type | Conventional |
Turbines | 3 x 100 MW Francis-type |
Installed capacity | 300 MW |
The Madushan Dam is a gravity dam on the Honghe (Red) River in Honghe Hani and Yi Autonomous Prefecture of Yunnan Province.
The name of the dam comes from the nearby village of Madushan, located on the left bank of the river upstream from the dam. Madushan village is administratively under Manhao Town (which itself located a few kilometers downstream of the dam) of Gejiu City of Honghe Prefecture; the opposite, right bank of the river is in Jinping Miao, Yao, and Dai Autonomous County of the same Honghe Prefecture.
The primary purpose of the dam is hydroelectric power production and it supports a 300 MW power station. [1] Construction on the dam began in 2007 and its generators were commissioned in 2011. [2] [3]
The Black River, also known upstream as the Lixian River in China, is a river located in China and northwestern Vietnam.
The Xiluodu Dam is an arch dam on the Jinsha River, i.e. the upper course of the Yangtze in China. It is located near the town of Xiluodu in Yongshan County of Yunnan Province but the dam straddles into Leibo County of Sichuan Province on the opposite side of the river. The primary purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 13,860 MW. Additionally, the dam provides for flood control, silt control and its regulated water releases are intended to improve navigation downstream. Construction on the dam and power station began in 2005 and the first generator was commissioned in 2013, the last in 2014. It is operated by China Yangtze Power and is currently the third-largest power station with the fourth-tallest dam in the world.
The Ahai Dam (阿海水电站) is a gravity dam on the Jinsha River in Yulong County, Lijiang Prefecture, Yunnan and in the river reach at about 5 km in the lower reaches of Cuiyu River mouth. Preliminary construction began in 2008 and construction on the dam superstructure and power station began in 2010. The dams first generator was operational in December 2012, the third by May 2013. The fifth and final generator was commissioned on 9 June 2014.
The Jinghong Dam is a gravity dam composed of roller-compacted concrete on the Lancang (Mekong) River near Jinghong in Yunnan Province, China. The main purpose of the dam is hydroelectric power production and it has an associated 1,750 MW power station. Part of the power generated is sold to Thailand under an agreement with China.
The Liyuan Dam is a concrete-face rock-fill dam on the Jinsha River on the border of Yulong County and Shangri-La County, Yunnan Province, China. The dam has an associated hydroelectric power station with a 2,400 MW power station containing 4 x 600 MW generators. Construction on the river diversion for the dam began in 2008. It began to impound its reservoir in November 2014 and on December 28, 2014 the first generator was commissioned. The second generator was commissioned in July 2015.
The Jinping-I Dam also known as the Jinping-I Hydropower Station or Jinping 1st Cascade, is a tall arch dam on the Jinping Bend of the Yalong River in Liangshan, Sichuan, China. Construction on the project began in 2005 and was completed in 2014. Its power station has a 3,600 MW capacity to produce between 16 and 18 TW·h annually. Supplying the power station is a reservoir created by the 305-meter-tall arch dam, the tallest in the world. The project's objective is to supply energy for expanding industrialization and urbanization, improve flood protection, and prevent erosion.
The Gelantan Dam (戈兰滩大坝) is a gravity dam on the Lixian River, bordering the counties of Honghe and Jiangcheng in Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation and it supports a 390 MW power station. Construction began in 2003, the river was diverted in 2006 and the first generator was commissioned in 2007, the last two in 2008. It is the sixth dam in the Lixian River cascade.
The Huangdeng Dam is a gravity dam recently completed on the Lancang (Mekong) River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. The fact that work on the dam was begun without formal approval from the central government was a subject of some controversy.
The Miaowei Dam is a rock-filled embankment dam on the Lancang (Mekong) River in Yunlong County of Yunnan Province, China. Construction on the dam began in 2010. The four turbines of 1,400 MW hydroelectric power station were commissioned in 2017 and 2018.
The Lizhou Dam is a run-of-the-river hydroelectric arch dam on the Muli River in Muli Tibetan Autonomous County, Sichuan Province, China.
The Wunonglong Dam is a gravity dam currently under construction on the Lancang (Mekong) River in Weixi Lisu Autonomous County, Yunnan of Yunnan Province, China. The primary purpose of the dam is hydroelectric power production. Construction on the dam began in 2010 and the river was diverted around the foundation in November 2014. Its 990 MW hydroelectric power station is expected to be operational in 2018 with the entire project complete in 2019.
The Dahuaqiao Dam is a gravity dam on the Lancang River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction began in 2010 and its 900 MW hydroelectric power station was fully operational as of 2019.
The Gongguoqiao Dam is a gravity dam on the Lancang (Mekong) River in Yunlong County of Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction began in 2008 and the river was diverted around the dam site in 2009. The next year concrete placement began and in 2011 the first generator was commissioned. The 900 MW power station was fully operational on 21 June 2012.
The Sinanjiang Dam is a concrete-face rock-fill dam on the Sinan River, a tributary of the Lixian River, in Mojiang Hani Autonomous County of Yunnan Province, China. The primary purpose of the dam is hydroelectric power production and it supports a 201 MW power station. Construction began in October 2003 and the river was diverted around the dam site on 5 February 2005. All three generators were commissioned in 2008. To produce power, water from the reservoir is diverted around a bend in the river through a 10.3 km (6.4 mi) long headrace tunnel which connects to the power station via a penstock. The power station contains three 67 MW Francis turbine-generators.
The Longjiang Dam is an arch dam on the Long River near Mangshi in Dehong Prefecture of Yunnan Province, China. It is a multiple-purpose project aimed at flood control, irrigation and hydroelectric power generation. Its reservoir has a storage capacity of 1,217,000,000 m3 (986,638 acre⋅ft), of which 679,000,000 m3 (550,474 acre⋅ft) is reserved for river these purposes. The dam's power station is located on its left bank and contains three 80 MW Francis turbine-generators for a total installed capacity if 240 MW. Construction on the project began on 28 November 2006 and all generators were commissioned in 2010.
The Tianhuaban Dam is an arch dam on the Niulan River, a tributary of the Jinsha River. It straddles the border of Ludian and Qiaojia Counties in Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation and it supports a 180 MW power station. In September 2006, construction on the dam's river diversion tunnels commenced. The first two of 90 MW Francis turbine-generator sets was commissioned in February 2011, the second in March of the same year. Water from the reservoir is diverted to a power station about 2.5 km (1.6 mi) downstream on the right bank of the river.
Hydroelectricity is currently China's largest renewable energy source and the second overall after coal. China's installed hydroelectric capacity in 2015 was 319 GW, up from 172 GW in 2009, including 23 GW of pumped storage hydroelectricity capacity. In 2015, hydropower generated 1,126 TWh of power, accounting for roughly 20% of China's total electricity generation.