Mi Tren

Last updated

Metropolitan Train of Cochabamba
Fotografia Mi Tren.jpg
Overview
Area served Cochabamba Department
Locale Cochabamba, Bolivia
Transit type Light Rail/Interurban
Number of lines3
Number of stations37
Operation
Began operation13 September 2022 [1]
Number of vehicles12
Technical
System length42 km (26.1 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

Mi Tren is a light rail network operating in the Bolivian city of Cochabamba, linking the city with Suticollo, El Castillo and San Simon University. The system opened on 13 September 2022, with service beginning on the Red Line and the first phase of the Green Line. [1]

Contents

Background

Construction began on the $504 million [2] project in 2017 and it was aimed to be finished in 2020. [3] However, construction work was halted in late 2019 with reports of delayed payments between project promoters and key contractors. As of December 2020, new funding from the state has allowed construction to restart. The first phase of the system comprising the Red Line between Estación Central and UMSS and the Green Line between Estación Central and Quillacollo finally opened on September 13, 2022. [1]

Extensions to both lines opened one year later, on 14 September 2023: A new section of the Red Line between Estación Central and Estación Antiga de Cochabamba, and a new section of the Green Line between Quillacollo and Estación Municipal Vinto. [4] The remainder of the Green Line is still under construction, while local opposition delayed the Yellow Line until its opening on 17 September 2025. [5]

Lines

Mi Tren

Lines [6]
LineColorRouteLengthTravel timeNumber of
stations
Line 1GreenEstación Central San Antonio-Colcapirhua-Quillacollo-Vinto-Suticollo27,37 km53 minutes23
Line 2YellowEstación Central San Antonio-Terrapuerto Albarrancho5,8 km20 minutes5
Line 3RedEstación Central San Antonio-Kiñiloma7,5 km25 minutes9

Rolling stock

Stadler was contracted to supply 12 vehicles LRV Metelitsa B85601M for the network, with delivery expected in August 2019, and Stadler is to provide three years' warranty. Metelitsa model provided are the three-section vehicles having capacity for 200 passengers and a maximum speed of 80 km/h. [7] The trams are 33 m long, 2.5 m wide and 3.6 m high (excluding pantograph). [8]

References

  1. 1 2 3 "Cochabamba's Mi Tren light rail launched". Metro Report International . 15 September 2022. Retrieved 15 September 2022.
  2. "Construction set to start on Bolivia's Cochabamba LRT". La Razón . 8 February 2017.
  3. Melgarejo, Angélica (4 September 2017). "Empresa ejecutora del tren metropolitano en Cochabamba prevé quitar 18 t de rieles". La Razón . Archived from the original on 8 September 2017. Retrieved 13 October 2025.
  4. "Worldwide Review [regular news section]". Tramways & Urban Transit . UK: Mainspring Enterprises Ltd. November 2023. p. 439. ISSN   1460-8324.
  5. Carrasco, Mauricio (16 September 2025). "Cochabamba: Línea Amarilla de Mi Tren inicia operaciones el miércoles". Agencia Boliviana de Información (in European Spanish). Retrieved 13 October 2025.
  6. Gobernación Departamental de Cochabamba. "En marcha importante plan de transporte para Cochabamba: Tren metropolitano se ejecutará en tres años". Archived from the original on 8 April 2018. Retrieved 8 April 2018.
  7. "Stadler to supply light rail vehicles to Cochabamba" . Metro Report International . 2 March 2018. Retrieved 29 April 2018.
  8. "Stadler to deliver 12 Metelitsa trams Cochabamba – Bolivia". Rail Color News. 8 March 2018. Archived from the original on 15 June 2018.