Desalination plant | |
---|---|
Location | Moyo Town, Moyo District |
Coordinates | 03°37′33″N31°43′54″E / 3.62583°N 31.73167°E |
Cost | US$1.825 million (UGX:6.4 billion) |
Technology | Sedimentation, Chlorination |
Percent of water supply | 100% of Moyo Municipality Metropolitan Area |
Operation date | 3 September 2021 |
Moyo Water Supply and Sanitation System (MWSS), also Moyo Water Supply and Sewerage System is a water intake, purification, distribution and waste water collection and disposal system in Moyo Town and surrounding metropolis in Moyo District, Uganda. [1] [2]
The water treatment facility is located in Moyo Municipality, in Moyo District, in the West Nile sub-region, in Uganda's Northern Region. The raw water is sourced from two boreholes (Pamoju 1 and Pamoju 2), located in town's neighborhood known as Pamoju. [2]
Prior to 2020, Moyo Municipality was supplied with water from a small antiquated system with a capacity to supply no more than 500 customers. The water scarcity in the town adversely affected businesses, families, schools and refugee centres. [2]
In 2020, the government of Uganda, through the Uganda Ministry of Water and Environment and with joint funding from KfW of Germany, designed the Moyo Water Supply and Sanitation System. [2]
The water supply system comprises two boreholes; Pamoju 1 and Pamoju 2. Water is pumped from these water sources to two overhead storage reservoirs of 300 cubic meters (300,000 L) and 164 cubic meters (164,000 L) for a total 464 cubic meters (464,000 L) of water storage. Distribution pipes then convey the potable water to end-users. [2]
In 2020, the Uganda Ministry of Water and Environment, which is the implementing agency, awarded the engineering, procurement and construction (EPC) contract to Reddy's Borehole and Technical Services, a Ugandan company. Bright Technical Services, another Ugandan company, was the engineering supervisor. [2] The construction cost is reported as USh6.4 billion (approx.US$1.855 million). [1]
The sanitation component of the system comprises (a) "two blocks of six-station drainable latrines" constructed at one of the primary schools and (b) "a 13-stall toilet", connected to a septic tank. [2] Construction lasted approximately one year. [1] [2]
The system as configured in September 2021 benefits an estimated 28,500 people in 39 villages in Moyo Municipality and environs. [1] [2] [3]
Water supply is the provision of water by public utilities, commercial organisations, community endeavors or by individuals, usually via a system of pumps and pipes. Public water supply systems are crucial to properly functioning societies. These systems are what supply drinking water to populations around the globe. Aspects of service quality include continuity of supply, water quality and water pressure. The institutional responsibility for water supply is arranged differently in different countries and regions. It usually includes issues surrounding policy and regulation, service provision and standardization.
Water supply and sanitation in Rwanda is characterized by a clear government policy and significant donor support. In response to poor sustainability of rural water systems and poor service quality, in 2002 local government in the Northern Byumba Province contracted out service provision to the local private sector in a form of public–private partnership. Support for public-private partnerships became a government policy in 2004 and locally initiated public-private partnerships spread rapidly, covering 25% of rural water systems as of 2007.
The Ugandan water supply and sanitation sector made substantial progress in urban areas from the mid-1990s until at least 2006, with substantial increases in coverage as well as in operational and commercial performance. Sector reforms from 1998 to 2003 included the commercialization and modernization of the National Water and Sewerage Corporation (NWSC) operating in cities and larger towns, as well as decentralization and private sector participation in small towns.
Water supply and sanitation in Iran has witnessed some important improvements, especially in terms of increased access to urban water supply, while important challenges remain, particularly concerning sanitation and service provision in rural areas. Institutionally, the Ministry of Energy is in charge of policy and provincial companies are in charge of service provision.
Water supply and sanitation in Israel are intricately linked to the historical development of Israel. Because rain falls only in the winter, and largely in the northern part of the country, irrigation and water engineering are considered vital to the country's economic survival and growth. Large scale projects to desalinate seawater, direct water from rivers and reservoirs in the north, make optimal use of groundwater, and reclaim flood overflow and sewage have been undertaken. Among them is the National Water Carrier, carrying water from the country's biggest freshwater lake, the Sea of Galilee, to the northern part of the Negev desert through channels, pipes and tunnels. Israel's water demand today outstrips available conventional water resources. Thus, in an average year, Israel relies for about half of its water supply on unconventional water resources, including reclaimed water and desalination. A particularly long drought in 1998–2002 had prompted the government to promote large-scale seawater desalination. In 2022, 85% of the country's drinkable water was produced through desalination of saltwater and brackish water.
Tunisia has achieved the highest access rates to water supply and sanitation services among the Middle East and North Africa. As of 2011, access to safe drinking water became close to universal approaching 100% in urban areas and 90% in rural areas. Tunisia provides good quality drinking water throughout the year.
The National Water and Sewerage Corporation (NWSC) is a water supply and sanitation company in Uganda. It is wholly owned by the government of Uganda.
Water supply and sanitation in Morocco is provided by a wide array of utilities. They range from private companies in the largest city, Casablanca, the capital, Rabat, Tangier, and Tetouan, to public municipal utilities in 13 other cities, as well as a national electricity and water company (ONEE). The latter is in charge of bulk water supply to the aforementioned utilities, water distribution in about 500 small towns, as well as sewerage and wastewater treatment in 60 of these towns.
The three cities of Abu Dhabi Emirate within the United Arab Emirates – the coastal city Abu Dhabi itself as well as the inland oases Al Ain and Liwa – receive their drinking water supply entirely from desalinated seawater.
Water supply and sanitation in Lebanon is characterized by a number of achievements and challenges. The achievements include the reconstruction of infrastructure after the 1975–90 Civil War and the 2006 war with Israel, as well as the reform of the water and sanitation sector through a water law passed in 2000. The law created four Regional Water Establishments to consolidate numerous smaller utilities.
Katosi is a town in the Mukono District of the Central Region of Uganda. The town is an urban center under Mukono District Administration.
Parombo is a town in the West Nile sub-region of the Northern Region of Uganda.
National Policy Dialogues on Integrated Water Resources Management in Azerbaijan for managing water resources are aimed at developing a state strategy based on "Convention on the Protection and Use of Transboundary Watercourses and International Lakes" of United Nations Economic Commission for Europe and European Union Water Framework Directive and the "Water and Health" Protocol of that convention as well as other principles of the United Nations and the EU.
Katosi Water Works (KWW), also Katosi Water Treatment Plant is a water purification and distribution project in Uganda.
Busia Water Supply and Sanitation Project (BWSSP), also Busia Water Supply and Sewerage System is a water intake, purification, distribution and waste water collection and disposal system in Busia District, Uganda.
Gulu Water Supply and Sanitation Project (GWSSP), also Gulu Water Supply and Sewerage System, is a water intake, purification, distribution and waste water collection and disposal system in the city of Gulu, the largest urban centre in the Northern Region of Uganda. In October 2020, the Uganda government concluded Phase 1 of the improvement of water supply and sanitation in the city, with funding from the World Bank, KfW and the Government of Uganda. Phase 2 improvements are expected to start in 2021, with funding from the World Bank, KfW and the Commonwealth Development Corporation.
Isingiro Water Supply and Sanitation Project (IWSSP), also Isingiro Water Supply and Sewerage System is a water intake, purification, distribution and waste water collection and disposal system in Isingiro District, in the Western Region of Uganda. The project is intended to meet the water supply and sanitation needs of 340,000 people of the 550,000 inhabitants of the district. The beneficiaries include the 100,000 occupants of Nakivale Refugee Settlement and the 32,000 occupants of Oruchinga Refugee Settlement. The work is to be carried out by the Uganda Ministry of Water and Environment through the parastatal utility company, National Water and Sewerage Corporation (NWSC). Funding, have been provided by the French Development Agency and the European Union.
Masaka–Mbarara Water Supply and Sanitation Project (MMWSSP), is a water intake, purification, distribution and waste water collection and disposal system in the cities of Masaka and Mbarara in the Central Region and the Western Region of Uganda. The project is intended to meet the water supply and sanitation needs of approximately 1,055,000 by 2030. The work is to be carried out by the Uganda Ministry of Water and Environment through the parastatal utility company, National Water and Sewerage Corporation (NWSC). Funding, have been provided by the French Development Agency and the European Union.
Rukungiri Water Supply and Sanitation Project (RWSSP), also Rukungiri Water Supply and Sewerage System, is a water intake, purification, distribution and waste water collection and disposal system in the town of Rukungiri, in the Western Region of Uganda. When completed, the system is expected to supply 9,600 cubic meters (9,600,000 L) of water daily, to about 120,000 people in the town of Rukungiri and neighboring communities in Rukungiri District and to parts of Ntungamo District. The infrastructure development project is being jointly funded by the World Bank and the Government of Uganda.
Karago was a municipality in the Western Region of Uganda. In 2019, Karago was annexed by the city of Fort Portal, as part of the award of Tourism City status. It became a neighborhood in the Northern Division of Fort Portal City.