Nam Ou river cascade dams

Last updated

The Nam Ou cascade hydropower project is a series of seven hydroelectric dams along the Nam Ou river which are located in the provinces of Phongsaly and Luang Prabang in northern Laos. [1] The project is managed by the Power Construction Corporation of China (PowerChina) and the Lao government. The project is the series of dams include seven levels of reservoirs in an attempt to mitigate ecological deterioration. The construction of the hydropower project is being completed in two phases. Phase I of the dams, including Nam Ou 2, Nam Ou 5, and Nam Ou 6 began operating on May 12, 2016. [2] Phase II of the dams, including Nam Ou 1, 3, 4, and 7 is expected to be completed in 2020. [3]

Contents

Nam Ou 3 station part of phase II of the Nam Ou cascade hydropower project Nam Ou 3 Dam.jpg
Nam Ou 3 station part of phase II of the Nam Ou cascade hydropower project

Background of the project

The Lao government and Sinohydro, a Chinese based project contractor, signed a $2.733 billion deal of investment in April 2011 [4] with the aim of financing the construction of a series of hydropower dams on the Nam Ou river. The contract of the project is to Build-Operate-Transfer. [5] This type of contract incorporates both private and public resources to complete the project. While Sinohydro is responsible for all the aspects of constructing the project, the company will also have the operation rights for a 29-year period [6] upon completion of the project. The complete capacity of all seven dams will total 1.272 million kilowatts. [2] The installed capacity of both phases of the project will be greater than the total capacity of the Nam Theun 2 and less than the total capacity of the Xayaburi Dam. While this trend of large hydropower projects in Laos is believed by some to demonstrate a modernizing nation, other scholars worry about the environmental and social consequences of this proliferation of projects. Sinohydro began operations in Laos more than 20 years ago while overseeing contracts of over 30 projects such as bridges, railways, roads, construction of water conservancy, and municipal engineering construction. [2]

The Nam Ou cascade dams mark the first time that a Chinese company has held development rights of a foreign project. [2] It is also the first project executed by PowerChina (merged with Sinohydro and now both operate under the title of PowerChina) with a global strategy within the CCP’s Belt and Road Initiative. [7] The Nam Ou cascade dams were developed to become the main power sources for Northern Laos and provide energy to other development projects in the region including the China-Laos Railway IV and V segments. [2] The project also fits under Lao government objectives to become the “Battery of Southeast Asia”, with electricity as a commodity serving to boost the national economy. [8] In the two months following its opening in 2017, the first phase of the project has generated 4 billion kWh. The second phase of the project is expected to provide 12% of total electricity in Laos. [9]

Chinese companies' role in the project

The hydropower sector has been prioritized by the Chinese government since the announcement of the 1999 Go Out policy. [5] Under this initiative, Chinese companies have become the largest portion of hydropower project financiers and builders globally. Power China Resources’ (Sinohydro's parent company) share of international hydropower development market comprised half of the entire industry. [5]

This project is being constructed following a BOT model. This model is also being incorporated in projects involving Chinese construction firms in Nepal, Macedonia, Cambodia, Burma, and Pakistan. [5] The disadvantage of this approach includes the difficulty of mitigating the social and environmental impacts of these massive projects. While there are other countries with high -potential hydropower, Southeast Asia has been the focal region for the development of these projects, representing 41% of all foreign hydropower projects with Chinese involvement in 2017. [5] After merging with PowerChina, Sinohydro has become a project contractor primarily. In the past decade, Sinohydro has been the leading Chinese company in terms of most projects constructed totaling 118 and most hydropower capacity totaling 42,828 MW. PowerChina is a BOT developer that works with contractors like Sinohydro to develop hydropower projects. [5]

Lao government's role in the project

The Lao government is responsible for the oversight of Sinohydro’s and PowerChina’s projects including the effects these projects have on the surrounding communities. PowerChina claims that the company has incorporated local development into its projects including training and employing up to 13,600 Lao workers in the projects and resettlement village construction. [2] PowerChina also attempts to collaborate with local construction and development companies to boost relevant Laos industries. PowerChina was awarded the “Commendation of Taxation Work” by the Lao Department of the Ministry of Finance in 2017. The Lao government also awarded Power China with the “Outstanding SME Development Award” and “Special Contribution Award” in 2016 for the Nam Ngum 5 Hydropower station. [2] The Nam Ou cascade dam project has also sponsored Lao students’ education in China; six Lao students were selected to study at Wuhan University starting in 2017. PowerChina also states that it complies with the Lao government’s environmental regulations. [2] The Lao government also awarded the company the “Special Social and Environmental Contribution Award” in 2016 for their investments in a local campaign to protect forests and rivers. [2]

Response to Xe Pian-Xe Namnoy collapse

The Xe Pian-Xe Namnoy hydropower complex collapsed on July 23, 2018 causing damage to homes and agriculture 80 kilometers from the site and killing at least 71 people. The project had South Korean, Thai, American, and Lao stakeholders including SK E&C and Korea Western Power. The Xe Pian-Xe Namnoy project also followed a BOT model. 5000 villagers displaced by the collapse are still living in displacement camps. The Lao Law on Resettlement and Vocation detailed that these survivors cannot gain new housing until permanent replacement housing in a new area is constructed in 4-5 years. According to International Rivers, villagers expressed their dismay and confusion that they would not be able to return to the location of their former village. [10]

PowerChina was proactive and immediate in their response to the Lao government during this catastrophe. This response included sending the Lao Ministry of Energy and Mines a message of condolence and two subsidiaries of PowerChina (Chengdu Engineering Corporation Ltd. and Kunming Engineering Corporation Ltd.) joined the World Bank and Lao Ministry of Energy and Mines in the subsequent safety investigations of the site. [11] [ third-party source needed ] All built or in-construction hydropower projects were investigated for potential errors following the collapse. The Lao government also halted all hydropower project construction and planning in order to have a national review of development strategy. [12] PowerChina offered the Lao government technical assistance and support as well as engaged in rescue work in the affected areas. [11] [ third-party source needed ]

Environmental and social impacts

The entire series of dams in the project will spread across 80% of the Nam Ou river. [13] International Rivers conducted an Environmental and Social Impact Assessment of Nam Ou 6 and Nam Ou 2. In the assessments, the research team was hosted by PowerChina and were only able to interview company chosen members of the local community. Company staff was also present during the interviews. [13]

Biodiversity and food

The Nam Ou 6 dam is expected to cause the loss of 2,234 hectares of land because of construction site land use and river inundation. The entire cascade hydropower project is expected to result in a loss of 66% of fish biodiversity of the river. This biodiversity loss is partly caused by the pressure caused by the dams on fish traversing the river as well as by the loss of 70% of sediment that flows into the Mekong River. [13] 70% of fish caught in the river are sold while 30% are consumed locally. This sediment loss will also have a detrimental effect on riverside agriculture and rice cultivation in the Mekong River Basin. [14] The environmental impact of the project on the Phou Den Din National Protected Area near Nam Ou 6 will most likely be detrimental. This area is home to some populations of endangered species including Indochinese tigers and Asiatic elephants. The area was previously undisturbed by human activities and uninhabited. [15] The effect that the Nam Ou 6 project will have on the 265 species found in and surrounding the river is unknown. [13]

There have been attempts to mitigate the impact of these types of hydropower projects by companies by including features in the dam that are meant to allow for the safe passage of fish. Some scholars are skeptical of the viability of these solutions, but even if successful, the dams still cause stagnant waters that could destroy fish breeding grounds. [16] Food security and food safety is a concern for the future. The degradation of riverside agriculture as a result of lack of sediment and decreasing fishing yields could have a major effect on the nutrition of people dependent on the river as a major food source. Climate change may also restrict the industry of farmed fishing as another food source. [17]

Resettlement

Thousands of Laos villagers from hundreds of villages have been relocated to resettlement villages as a result of the construction of the Nam Ou cascade hydropower project. [13] Villagers are granted compensation that is determined by the Lao government and PowerChina. [3] The level of compensation is based on the number of people living in the initial village home. This has led to complaints from certain villagers with less populated homes that had many amenities. If only a few members lived in the previous home, then they will receive a smaller home in the resettlement village. [3] This system doesn’t account from the loss of high value properties that were inhabited by only a few family members. The homes and improvements of surrounding land may have generations of history, but the number of inhabitants was measured at the times of the project was the sole determinant factor to the size of their resettlement home and compensation. Other villagers report a lack of accountability and transparency among district authorities responsible for relocation. [3]

Complaints filed by villagers may not receive any response. Many villagers also lament losing access to the sites where their ancestors are buried. Some villagers also report that resettlement villages are not to the standard reported by the Lao government and PowerChina. Some report that they only received a fraction of the land that they were initially promised while others claim the new relocation villages are already damaged by insects. [3] PowerChina has invested $1.86 million into the construction of and repairs of bridges, roads, schools, and health centers in neighboring villages to projects and resettlement villages. [2] Another frustration in the relocation process involves the lack of public participation. Large scale hydropower projects have also been criticized by academics like Richard Frankel for creating high greenhouse gas emissions and underwhelming economic returns. [17]

See also

Related Research Articles

<span class="mw-page-title-main">Mekong</span> Major river in Southeast Asia

The Mekong or Mekong River is a trans-boundary river in East Asia and Southeast Asia. It is the world's twelfth-longest river and the third-longest in Asia with an estimated length of 4,909 km (3,050 mi) and a drainage area of 795,000 km2 (307,000 sq mi), discharging 475 km3 (114 cu mi) of water annually. From its headwaters in the Tibetan Plateau, the river runs through Southwest China, Myanmar, Laos, Thailand, Cambodia, and southern Vietnam. The extreme seasonal variations in flow and the presence of rapids and waterfalls in the Mekong make navigation difficult. Even so, the river is a major trade route between Tibet and Southeast Asia. The construction of hydroelectric dams along the Mekong in the 2000s through the 2020s has caused serious problems for the river's ecosystem, including the exacerbation of drought.

<span class="mw-page-title-main">Dams and reservoirs in Laos</span>

Dams and reservoirs in Laos are the cornerstone of the Lao government's goal of becoming the "battery of Asia".

<span class="mw-page-title-main">Nam Theun 2 Dam</span> Dam in Bolikhamsai and Khammouane Provinces, Laos

The Nam Theun 2 Hydropower Project, or simply NT2, is a hydroelectric dam on the Nam Theun River in Laos. Commercial operation of the plant began in April 2010. The scheme diverts water from the Nam Theun, a tributary of the Mekong River, to the Xe Bang Fai River, enabling a generation capacity of 1,075 MW, from a 350 m (1,148 ft) difference in elevation between the reservoir and the power station.

The Nam Ngum Dam is a hydroelectric dam on the Nam Ngum River, a major tributary of the Mekong River in Laos. It was the first hydropower dam built in the Lao PDR.

The Nam Ou is one of the most important rivers of Laos. It runs 448 km from Phongsaly Province to Luang Prabang Province. The river rises in Muang Ou Nua near the Lao-Chinese border, and traverses the northern Laos mountains and gorges until meeting the Mekong River in Ban Pak Ou. Along with the Mekong, the Nam Ou is the only natural channel suitable for large-draft boat transportation. The Nam Ou is one of the 12 principal tributaries of the Mekong River. The river has a total area of nearly 26,000 km2. Near its confluence with the Mekong are the Pak Ou Caves, famous for their Buddha statues. The river is also surrounded by limestone karts, forests, and valleys. The river supports Lao rice cultivation. The Nam Ou placed in the top 80th percentile for river health according to the Mekong River Commission's aquatic health index.

<span class="mw-page-title-main">Sinohydro</span> Chinese state-owned hydropower engineering and construction company

Sinohydro is a Chinese state-owned hydropower engineering and construction company. In the 2012 Engineering News-Record Top 225 Global Contractors, a ranking by annual revenue, the company is 14th by overall position, and 6th among Chinese construction companies.

<span class="mw-page-title-main">Hydropower dams in Myanmar</span>

There are almost 200 large dams in Myanmar. Myanmar (Burma) has a large hydroelectric power potential of 39,000 megawatts (52,000,000 hp), although the economical exploitable potential is about 37,000 megawatts (50,000,000 hp). Between 1990 and 2002, the country tripled its installed capacity of hydro plants, increasing from 253 megawatts (339,000 hp) to 745 megawatts (999,000 hp). Total installed capacity in 2010 is at least 2,449 megawatts (3,284,000 hp) MW, 6% of potential. Several large dams are planned to increase future hydro utilization.

<span class="mw-page-title-main">Hydropower in the Mekong River Basin</span>

The estimated hydropower potential of Mekong River Basin about 58,930 Megawatts (MW). As of February 2024, there are an estimated 167 Hydropower Plants (HPPs) in the Mekong, with a combined installed capacity of some 36,376.3 MW. An additional 20 HPPs are currently under construction and at various stages of completion. These have a combined installed capacity of an additional 4,535.5 MW.

<span class="mw-page-title-main">Sirindhorn Dam</span> Dam in Sirindhorn, Ubon Ratchathani

The Sirindhorn Dam is in Sirindhorn District, Ubon Ratchatani, Thailand. It impounds the Lam Dom Noi River, and its reservoir is the province's largest water resource. The dam was commissioned in 1971 to serve as a hydropower facility as well as to supply irrigation water. The dam was named after Princess Royal Sirindhorn. All of the electricity generated by the dam is destined for domestic markets. The dam was constructed and is owned and operated by the Electricity Generating Authority of Thailand and is located in the Mekong River Basin, just upstream from the controversial Pak Mun Dam.

The Sambor Dam is a proposed dam and hydroelectric power station on the Mekong River south of Sambor village in Prek Kampi District, Kratie Province, Cambodia. If built, it would be the lowest dam of the Mekong's mainstream dams, and largest in Cambodia.

The Lower Se San 2 Dam is a hydroelectric dam under development on the Se San River in Stung Treng Province, northeastern Cambodia. The Se San River is a major tributary of the Mekong River. The dam site is located 25 kilometres (16 mi) east of the provincial capital, also named Stung Treng. The first turbine began producing electricity in November 2017. The dam was officially opened on December 18, 2018.

The Stung Treng Dam is a proposed hydroelectric dam on the Mekong River in Stung Treng Province, Cambodia. It would be located on the mainstream of the Lower Mekong River. The project is controversial for several reasons, including its possible impact on the fisheries, as well as other ecological and environmental factors.

<span class="mw-page-title-main">Xayaburi Dam</span> Dam in Xayaburi

The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of the town of Sainyabuli (Xayaburi) in northern Laos. Commercial operation of the dam started in October 2019. The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT). The project is surrounded in controversy due to complaints from downstream riparians and environmentalists. Preliminary construction began in early-2012, but work on the dam itself was suspended shortly thereafter due to complaints from Cambodia and Vietnam downstream. After making modifications to the dam's design, Laos started construction with a ceremony on 7 November 2012. The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.

The Don Sahong is a hydroelectric dam commissioned in 2020 on the Mekong River in Siphandone area of Champasak Province, Laos, less than two kilometers upstream of the Laos–Cambodia border.

The Houay Ho is a dam located in Samakkhixay District of Attapeu Province, Laos, 160 km (99 mi) east of Pakse and 30 km (19 mi) northwest of Attapeu. The project is considered the first privately financed joint venture 'build-operate-transfer' (BOT) hydropower project in Laos. It has installed capacity of 152.1 megawatts (204,000 hp), almost all of which is exported to Thailand.

This page describes energy and electricity production, consumption and import in Laos.

<span class="mw-page-title-main">Phongsaly province</span> Province of Laos

Phongsaly province, also spelled Phôngsali, is a province of Laos in the extreme north of the country. The capital of the province is the city of Phôngsali. Phongsaly is between Yunnan (China), and Điện Biên province in Vietnam. Its culture has thus been historically heavily influenced by China.

The Panel of Environmental and Social Experts (POE) is an advisory body made up of western academics which reports on the social and environmental costs of the Nam Theun 2 Dam, a hydroelectric project on the Nam Theun River in Laos. In its yearly to biyearly reports, the panel makes recommendations to minimize the project's negative impacts and maximize the positive effect. The panel also provided the initial social and environmental justification for the dam's creation. Despite its stated aims, the body has received numerous criticisms from scholars and NGOs regarding its efficacy. Allegations involve a neocolonial mindset and the suppression of negative findings for financial gain.

The 2018 Laos dam collapse was the collapse of Saddle Dam D, part of a larger hydroelectric dam system under construction in southeast Laos's Champasak Province, on 23 July 2018. The dam collapse lead to widespread destruction and homelessness among the local population in neighbouring Attapeu Province. As of 25 September, 40 people were confirmed dead, at least 98 more were missing, and 6,600 others were displaced.

<span class="mw-page-title-main">Power Construction Corporation of China</span>

Power Construction Corporation of China, branded as PowerChina, is a wholly State-owned company administered by the State-owned Assets Supervision and Administration Commission and part of the heavy and civil engineering construction industry. PowerChina consists of 779 companies. In 2020, PowerChina ranked 157 among Fortune Global 500 companies and 41 among Top 500 Enterprises of China.

References

  1. Ingram, Elizabeth (2016-05-04). "Second phase of 1,156-MW Nam Ou hydro project kicks off in Laos". Hydro Review.
  2. 1 2 3 4 5 6 7 8 9 10 "Power Construction Corporation of China: Laos Sustainability Report" (PDF). PowerChina.
  3. 1 2 3 4 5 Saimok. "The Loss of the Ou River" (PDF). Focus on the Global South.
  4. "China Development Bank loan for construction of Laos hydropower project phase 2 (Nam Ou 1, 3, 4, 7". AidData. College of William and Mary.
  5. 1 2 3 4 5 6 Jensen-Cormier, Stephanie (2017-12-14). "Reflections on Chinese Companies' Global Investments in the Hydropower Sector Between 2006-2017". International Rivers.
  6. Ingram, Elizabeth (2016-05-04). "Second phase of 1,156-MW Nam Ou hydro project kicks off in Laos". Hydro Review.
  7. "Power Construction Corporation of China: Laos Sustainability Report" (PDF). PowerChina.
  8. Board, Jack (2020-01-12). "'The colour is blue': Strange changes to Mekong River as hydropower dams and climate change make their mark". Channel News Asia.
  9. Yang, Han (2019-04-01). "Belt, Road project improves lives in Laos". China Daily.
  10. "Reckless Endagerment: Assessing Responsibility for the Xe Pian-Xe Namnoy Dam Collapse" (PDF). International Rivers. Inclusive Development Internation.
  11. 1 2 "POWERCHINA offers help to collapsed dam in Laos". Power China.
  12. Harris, Maureen (2018-08-17). "All eyes on Lao dam tragedy probe". Bangkok Post.
  13. 1 2 3 4 5 "Watered Down: How do big hydropower companies adhere to social and environmental policies and best practices?" (PDF). International Rivers.
  14. "Nam Ou River Basin Profile: Summary Document" (PDF). World Bank. International Finance Corporation.
  15. "Nam Ou River". International Rivers. 16 October 2023.
  16. Stone, Richard (2016-12-02). "Dam-Building Threatens Mekong Fisheries". American Association for the Advancement of Science. 354 (6316): 1084–1085. Bibcode:2016Sci...354.1084S. doi:10.1126/science.354.6316.1084. PMID   27934711.
  17. 1 2 Kemp, Melody (2017-01-13). "The Dammed Don: Lao hydropower project pushes ahead despite alarm from scientists". Mongabay.