Navigation season

Last updated

In the water transport, the navigation season (or shipping season [1] ) is a period of the year during which a waterway is open for navigation. The opening and closing dates of the season are determined annually by the waterway administration to accommodate the weather, water flow and ice [2] conditions as well as the transportation demands. [3] The term is also frequently used to designate number of days per year with easy navigation. [1]

Contents

Terminology

In a general sense, in different contexts the term has slightly different meanings, multiple expressions are used [1] (for the Northern Hemisphere):

A traditional navigation season naturally varies from оne year to another, a fixed navigation season alternative sets firm dates for opening and closing (that can be changed based on conditions, but only to shorten the period), an extended navigation season utilizes technical means to continue navigation under adverse conditions (e.g., ice). [4]

A navigation window is created by a short controlled release of water from an upstream reservoir to temporarily create a higher river stage for the purpose of navigation. [5]

History

Antiquity

In Ancient Greece, the navigation period on the Mediterranean Sea lasted while the Pleiades star cluster was visible [6] (May to November). Some interpretations of the Story of Wenamun (Ancient Egypt, circa 1000 BC) and texts from Ugarit (2nd millennium BC) suggest the existence of navigation seasons even earlier. [7]

Europe

Navigation periods in Europe have a long history. Maritime law of Hanseatic League already in the 13th century stated that the ships must remain in the winter ports after St. Martin's Day (November 11). By the 15th century more detailed laws allowed sailing on the Baltic Sea from Cathedra Petri (February 22) to St. Martin's Day. [8] The season in the North Sea was even shorter, from one Feast of the Cross (Invention of the Cross on May 3) to another (Exaltation of the Cross on September 14). [9]

USA

Multiple Rivers and Harbors Acts left the administration of navigation on the major US waterways, including the commencement and closing of the navigation season, to the U.S. Army Corps of Engineers (USACE).[ citation needed ] [10]

Related Research Articles

<span class="mw-page-title-main">St. Lawrence Seaway</span> Locks and canals in the US and Canada

The St. Lawrence Seaway is a system of locks, canals, and channels in Canada and the United States that permits oceangoing vessels to travel from the Atlantic Ocean to the Great Lakes of North America, as far inland as Duluth, Minnesota, at the western end of Lake Superior. The seaway is named for the St. Lawrence River, which flows from Lake Ontario to the Atlantic Ocean. Legally, the seaway extends from Montreal, Quebec, to Lake Erie, and includes the Welland Canal. Ships from the Atlantic Ocean are able to reach ports in all five of the Great Lakes, via the Great Lakes Waterway.

<span class="mw-page-title-main">United States Army Corps of Engineers</span> United States federal military agency

The United States Army Corps of Engineers (USACE) is an engineer formation of the United States Army that has three primary mission areas: Engineer Regiment, military construction, and civil works. The day-to-day activities of the three mission areas are administered by a lieutenant general known as the commanding general/chief of engineers. The chief of engineers commands the Engineer Regiment, comprising combat engineer, rescue, construction, dive, and other specialty units, and answers directly to the Chief of Staff of the Army. Combat engineers, sometimes called sappers, form an integral part of the Army's combined arms team and are found in all Army service components: Regular Army, National Guard, and Army Reserve. Their duties are to breach obstacles; construct fighting positions, fixed/floating bridges, and obstacles and defensive positions; place and detonate explosives; conduct route clearance operations; emplace and detect landmines; and fight as provisional infantry when required. For the military construction mission, the commanding general is directed and supervised by the Assistant Secretary of the Army for installations, environment, and energy, whom the President appoints and the Senate confirms. Military construction relates to construction on military bases and worldwide installations.

<span class="mw-page-title-main">Tennessee River</span> River in the southeastern United States

The Tennessee River is the largest tributary of the Ohio River. It is approximately 652 miles (1,049 km) long and is located in the southeastern United States in the Tennessee Valley. The river was once popularly known as the Cherokee River, among other names, as the Cherokee people had their homelands along its banks, especially in what are now East Tennessee and northern Alabama. Additionally, its tributary, the Little Tennessee River, flows into it from Western North Carolina and northeastern Georgia, where the river also was bordered by numerous Cherokee towns. Its current name is derived from the Cherokee town, Tanasi, which was located on the Tennessee side of the Appalachian Mountains.

<span class="mw-page-title-main">Intracoastal Waterway</span> Inland waterway along the Atlantic and Gulf coasts of the United States

The Intracoastal Waterway (ICW) is a 3,000-mile (4,800 km) inland waterway along the Atlantic and Gulf of Mexico coasts of the United States, running from Massachusetts southward along the Atlantic Seaboard and around the southern tip of Florida, then following the Gulf Coast to Brownsville, Texas. Some sections of the waterway consist of natural inlets, saltwater rivers, bays, and sounds, while others are artificial canals. It provides a navigable route along its length without many of the hazards of travel on the open sea.

<span class="mw-page-title-main">Lake Strom Thurmond</span> Man-made lake in Georgia and South Carolina, United States

Lake Strom Thurmond, officially designated J. Strom Thurmond Reservoir at the federal level, and Clarks Hill Lake by the state of Georgia, is a man-made reservoir at the border between Georgia and South Carolina in the Savannah River Basin.

<span class="mw-page-title-main">Channel (geography)</span> Type of landform in which part of a body of water is confined to a relatively narrow but long region

In physical geography, a channel is a type of landform consisting of the outline of a path of relatively shallow and narrow body of water or of other fluids, most commonly the confine of a river, river delta or strait. The word often refers to a natural body of water, while the cognate term canal denotes a similar artificial structure.

The Mississippi River–Gulf Outlet Canal is a 76 mi (122 km) channel constructed by the United States Army Corps of Engineers at the direction of Congress in the mid-20th century that provided a shorter route between the Gulf of Mexico and New Orleans' inner harbor Industrial Canal via the Intracoastal Waterway. In 2005, the MRGO channeled Hurricane Katrina's storm surge into the heart of Greater New Orleans, contributing significantly to the subsequent multiple engineering failures experienced by the region's hurricane protection network. In the aftermath the channel was closed. A permanent storm surge barrier was constructed in the MRGO in 2009, and the channel has been closed to maritime shipping.

<span class="mw-page-title-main">Navigability</span> Capacity of a body of water to allow the passage of vessels at a given time

A body of water, such as a river, canal or lake, is navigable if it is deep, wide and calm enough for a water vessel to pass safely. Such a navigable water is called a waterway, and is preferably with few obstructions against direct traverse that need avoiding, such as rocks, reefs or trees. Bridges built over waterways must have sufficient clearance. High flow speed may make a channel unnavigable due to risk of ship collisions. Waters may be unnavigable because of ice, particularly in winter or high-latitude regions. Navigability also depends on context: a small river may be navigable by smaller craft such as a motorboat or a kayak, but unnavigable by a larger freighter or cruise ship. Shallow rivers may be made navigable by the installation of locks that regulate flow and increase upstream water level, or by dredging that deepens parts of the stream bed.

<span class="mw-page-title-main">Inland waterways of the United States</span>

The inland waterways of the United States include more than 25,000 mi (40,000 km) of navigable waters. Much of the commercially important waterways of the United States consist of the Mississippi River System—the Mississippi River and connecting waterways.

<span class="mw-page-title-main">Illinois Waterway</span> Canal system in Illinois

The Illinois Waterway system consists of 336 miles (541 km) of navigable water from the mouth of the Calumet River at Chicago to the mouth of the Illinois River at Grafton, Illinois. Based primarily on the Illinois River, it is a system of rivers, lakes, and canals that provide a shipping connection from the Great Lakes to the Gulf of Mexico via the Illinois and Mississippi rivers.

<span class="mw-page-title-main">Inland navigation</span>

Inland navigation, inland barge transport or inland waterway transport (IWT) is a transport system allowing ships and barges to use inland waterways (such as canals, rivers and lakes). These waterways have inland ports, marinas, quays, and wharfs.

<span class="mw-page-title-main">McClellan–Kerr Arkansas River Navigation System</span> Part of the United States inland waterway system

The McClellan–Kerr Arkansas River Navigation System (MKARNS) is part of the United States inland waterway system originating at the Tulsa Port of Catoosa and running southeast through Oklahoma and Arkansas to the Mississippi River. The total length of the system is 445 miles (716 km). It was named for two senators, Robert S. Kerr (D-OK) and John L. McClellan (D-AR), who pushed its authorizing legislation through Congress. The system officially opened on June 5, 1971. President Richard M. Nixon attended the opening ceremony. It is operated by the Army Corps of Engineers (USACE).

The Subcommittee on Water Resources and Environment is a subcommittee within the House Transportation and Infrastructure Committee.

<span class="mw-page-title-main">History of turnpikes and canals in the United States</span> Development of transportation links in the USA.

The history of turnpikes and canals in the United States began with work attempted and accomplished in the original thirteen colonies, predicated on European technology. After gaining independence, the United States grew westward, crossing the Appalachian Mountains with the admission of new states and then doubling in size with the Louisiana Purchase in 1803. The only means of transportation at the time between the coastal states and interior lands remained on water, by canoe, boat and ship, or over land on foot and by pack animal. Recognizing the success of Roman roads in unifying that empire, political and business leaders in the United States began to construct roads and canals to connect the disparate parts of the nation.

The Water Resources Development Act of 1986 is part of Pub. L. 99–662, a series of acts enacted by Congress of the United States on November 17, 1986.

Rivers and Harbors Act may refer to one of many pieces of legislation and appropriations passed by the United States Congress since the first such legislation in 1824. At that time Congress appropriated $75,000 to improve navigation on the Ohio and Mississippi rivers by removing sandbars, snags, and other obstacles. Like when first passed, the legislation was to be administered by the United States Army Corps of Engineers (USACE), under its Chief Engineer and the Secretary of War.

The General Survey Act was a law passed by the United States Congress in April 1824, which authorized the president to have surveys made of routes for transport roads and canals "of national importance, in a commercial or military point of view, or necessary for the transportation of public mail." While such infrastructure of national scope had been discussed and shown wanting for years, its passage shortly followed the landmark US Supreme Court ruling, Gibbons v. Ogden, which first established federal authority over interstate commerce, including navigation by river. The US president assigned responsibility for the surveys to the Corps of Engineers (USACE).

The Jefferson Seaway was a proposed deep-draft ship channel to be created in Jefferson Parish, Louisiana, that would establish a route between the Mississippi River at Westwego and the Gulf of Mexico near Grand Isle. The Mississippi River provided the only deep-water access to New Orleans and its neighboring ports. In the mid-20th century, the creation of alternate routes was considered, including the Mississippi River-Gulf Outlet (MR-GO), which was ultimately selected, funded and constructed. The Jefferson Seaway, sometimes referred to as the Arrow to the Americas, the Mississippi Valley Seaway Canal, the Tidewater Ship Canal and the Barataria Canal, was also under consideration but ultimately was never constructed as a deep-draft channel.

<span class="mw-page-title-main">West Point Lake</span> Lake in Georgia, U.S.

West Point Lake is a man-made reservoir located mostly in west-central Georgia on the Chattahoochee River and maintained by the U.S. Army Corps of Engineers (USACE). The Chattahoochee river flows in from the north, before flowing through the West Point Dam, which impounds the lake, and continuing to Columbus, Georgia. Of the four major USACE lakes in the ACF River Basin, West Point Lake is the smallest by area containing 25,864 acres (10,467 ha) of water, and has the second shortest shoreline at 604 mi (972 km). The purposes of the reservoir are to provide flood control, hydroelectric power, and water storage to aid the navigation of the lower Chattahoochee.

Fairway is a part of a water body containing the navigable channel, a route suitable for ships of the larger size.

References

  1. 1 2 3 Pastusiak 2016, p. 6.
  2. Transportation Research Board 2004, p. 30.
  3. Joint practices and procedures respecting the transit of ships on the St. Lawrence Seaway, p. 4
  4. USACE 1979, pp. 44–46.
  5. Jones 1995, p. 11.
  6. "Pleiad" . Oxford English Dictionary (Online ed.). Oxford University Press . Retrieved 2022-02-15.(Subscription or participating institution membership required.)
  7. Sauvage 2008, p. 210.
  8. Kreem 2011, p. 122.
  9. Benedictow 2016, p. 118.
  10. U.S. Government Printing Office 1994, p. 959. "Corps of Engineers determines what the season length is [for Great Lakes]"

Sources