Niantic station

Last updated

East Lyme and Niantic
Niantic station postcard.jpg
Niantic station on an early-20th-century postcard
General information
Location Main Street at Pennsylvania Avenue
Niantic, Connecticut
Coordinates 41°19′23″N72°11′31″W / 41.3231°N 72.1920°W / 41.3231; -72.1920
Line(s) Northeast Corridor
Tracks2
History
Opened1850s; April 30, 1978
ClosedJanuary 28, 1972 [1] [2]
October 1, 1981 [3]
Rebuilt1899, 1954
Previous namesEast Lyme; East Lyme and Niantic
Proposed services
Preceding station Hartford Line logo.png CT Rail Following station
Old Saybrook
toward Stamford
Shore Line East New London
Terminus
Former services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Old Saybrook
toward New Haven
Beacon Hill New London
toward Boston South
Clamdigger New London
Terminus

Niantic (also known as East Lyme or East Lyme and Niantic) was a train station on the Northeast Corridor located in the Niantic village of East Lyme, Connecticut. Opened in the 1850s, it was rebuilt in 1899 and again in 1954 by the New Haven Railroad. It closed in 1972, then reopened from 1978 to 1981 for use by the Amtrak Beacon Hill . A new station has since been proposed to be built in Niantic to serve the Shore Line East commuter rail service.

Contents

History

Former stations

The New Haven & New London Railroad was charted in 1848, began construction in 1850, and opened for service in July 1852. [4] East Lyme station, located at the foot of Pennsylvania Avenue, may have opened slightly later than other stations on the line. [5] The line was owned by the New York, Providence and Boston Railroad (the "Stonington Road") from 1858 to 1862, and by the Shore Line Railway from 1864 until it was acquired by the New Haven Railroad in 1870. [4] As Niantic grew to exceed East Lyme proper in population - particularly after Camp Niantic opened in 1873 - the station was renamed East Lyme and Niantic. [5]

The 1899-built station shown on a postcard mailed in 1915 Niantic station 1915 postcard.jpg
The 1899-built station shown on a postcard mailed in 1915

The original station burned on September 23, 1898. It was replaced in early 1899 by a saltbox style station similar to others that the New Haven built that decade. [5] The station was heavily used by soldiers traveling to Camp Niantic for maneuvers, as well as by spectators. [5] The station was little-used by mid-century; it was divided into retail stores in 1954, and a 15-foot (4.6 m) by 30-foot (9.1 m) wooden shelter was constructed nearby. [5] The 1899-built station building was destroyed by fire on August 22, 1970, and demolished in early September. [5]

Most commuter service east of New Haven ceased on January 1, 1969, after the New Haven merged into Penn Central, though the Clamdigger continued operation under Penn Central and later Amtrak until January 28, 1972. [6] [7] :6 In 1975, the Connecticut Department of Transportation (CDOT) made plans to restore commuter rail service between New Haven and New London, with a twice-daily Clamdigger making the same stops as the pre-1972 train, including to the former Niantic station (now to be named simply East Lyme); although negotiations with Penn Central were successful, budgetary constraints prevented these plans from coming to fruition. [8]

A second version of the Clamdigger operated from September 9, 1976 to October 30, 1977, but it did not stop at Niantic. [9] [10] [11] The Clamdigger was reinstated on January 8, 1978, with commuter-based flag stops added at Groton, Clinton, Madison, Stony Creek, and Branford - but still not Niantic. [12] [13] :1

The Clamdigger was replaced by the Boston-New Haven Beacon Hill effective April 30, 1978. [12] [13] :11 The decaying wooden shelter had been torn down by the local Jaycees on February 18 of that year as a civic improvement project, so the Niantic 'station' consisted of "a strip of gravel dumped between two yellow two-by-fours". [5] [14] Ridership west of Providence on the Beacon Hill was light; the first passenger to use the Niantic flag stop was a New London Day reporter on the service's third day. [14] The Beacon Hill was discontinued on October 1, 1981, ending service to Niantic a second time. [15] [16] :65

Shore Line East

Shore Line East commuter service began between New Haven and Old Saybrook on May 29, 1990. [8] Beginning in 1996, some Shore Line East trips were extended eastward to New London; however, they did not make any stops between Old Saybrook and New London. [8] [17] In April 2012, a state report was released detailing four possible sites for an infill station in East Lyme. Two of the sites were near downtown Niantic (one at the Niantic River Bridge to the east, and the other at Hole in the Wall Beach to the west), while the other two were in Rocky Neck State Park. [2] A 2015 bonding proposal from Connecticut governor Dannel Malloy allocated $750,000 to the planning and construction of a new station and parking lot in Niantic (out of an estimated $30,000,000 required to bring the new station fully into service). [18]

Related Research Articles

<i>Metroliner</i> (train) Former express train between Washington, D.C., and New York City

The Metroliners were extra-fare high-speed trains between Washington, D.C., and New York City which operated from 1969 to 2006. They were briefly first operated by Penn Central Transportation, then by Amtrak for 35 years.

<i>Keystone Service</i> Amtrak service in Pennsylvania

The Keystone Service is a 195 mile regional passenger train service from Amtrak between the Harrisburg Transportation Center in Harrisburg, Pennsylvania, and 30th Street Station in Philadelphia, running along the Philadelphia to Harrisburg Main Line. Most trains continue along the Northeast Corridor (NEC) to Penn Station in New York City.

<span class="mw-page-title-main">Northeast Corridor Line</span> Commuter rail line in New Jersey and New York

The Northeast Corridor Line is a commuter rail service operated by NJ Transit between the Trenton Transit Center and New York Penn Station on Amtrak's Northeast Corridor in the United States. The service is the successor to Pennsylvania Railroad commuter trains between Trenton and New York, and is NJ Transit's busiest commuter rail service. After arrival at New York Penn Station, some trains load passengers and return to New Jersey, while others continue east to Sunnyside Yard for storage. Most servicing is done at the Morrisville Yard, at the west end of the line. The Northeast Corridor Line is colored red on NJ Transit system maps and its symbol is the State House. The Princeton Branch is a shuttle service connecting to the line. Connecting SEPTA Trenton Line service between Philadelphia and Trenton is listed in the timetable.

<span class="mw-page-title-main">Shore Line East</span> Commuter rail service in southern Connecticut, US

Shore Line East (SLE) is a commuter rail service which operates along the Northeast Corridor through southern Connecticut, United States. The rail service is a fully owned subsidiary of the Connecticut Department of Transportation (CTDOT) and is operated under the CT Rail brand. SLE provides service seven days a week along the Northeast Corridor between New London and New Haven; limited through service west of New Haven to Bridgeport and Stamford has been suspended since 2020. Cross-platform transfers to Metro-North Railroad New Haven Line trains are available at New Haven for service to southwestern Connecticut and New York City. Pre-COVID, around 2,200 riders used the service on weekdays.

<span class="mw-page-title-main">Suburban Station</span> Station on the SEPTA Regional Rail

Suburban Station is an art deco office building and underground commuter rail station in Penn Center in Philadelphia. Its official SEPTA address is 16th Street and JFK Boulevard. The station is owned and operated by SEPTA and is one of the three core Center City stations on the SEPTA Regional Rail and one of the busiest stations in the Regional Rail System.

<span class="mw-page-title-main">Lindenwold station</span> NJ Transit rail station

Lindenwold station is a train station in Lindenwold, New Jersey, United States, served by the NJ Transit Atlantic City Line regional rail service and the rapid transit PATCO Speedline. Lindenwold is the eastern terminus of PATCO; the system's headquarters and maintenance facility are located adjacent to the station in neighboring Voorhees.

<span class="mw-page-title-main">Trenton Line</span> SEPTA Regional Rail system line

The Trenton Line is a route of the SEPTA Regional Rail system. The route serves the northeastern suburbs of Philadelphia, Pennsylvania with service in Bucks County along the Delaware River to Trenton, New Jersey.

<span class="mw-page-title-main">Wickford Junction station</span> Railway station in North Kingstown, RI

Wickford Junction station is a commuter rail station located in North Kingstown, Rhode Island, United States. It is the southern terminus of the MBTA Commuter Rail Providence/Stoughton Line and serves as a park and ride location for commuters to Providence and Boston. The station consists of a single high-level side platform on a stub-end siding next to the Northeast Corridor mainline.

<span class="mw-page-title-main">Metuchen station</span> NJ Transit rail station

Metuchen station is an active commuter railroad train station in the borough of Metuchen, Middlesex County, New Jersey. Trains at Metuchen station are serviced by New Jersey Transit's Northeast Corridor Line between Trenton Transit Center or Jersey Avenue and New York Penn Station. The next station to the south is Edison while the next station to the north is Metropark. Amtrak services cross through the station without stopping. The station consists of two side platforms with a wooden station depot on the northbound tracks. Metuchen's station depot and the New York-bound platform are accessible from Woodbridge Avenue while the Trenton-bound platform comes from Main Street. There is no station agent at Metuchen station, however ticket vending machines are available.

<span class="mw-page-title-main">Kingston station (Rhode Island)</span> Railway station in Kingston, Rhode Island

Kingston is a historic railroad station located on the Northeast Corridor in the village of West Kingston, in the town of South Kingstown, Rhode Island. It was built at this location in 1875 by the New York, Providence and Boston Railroad, replacing earlier stations dating back to the opening of the line in 1837. Current rail services consist of Northeast Regional trains in each direction, most of which stop at the station. Historically Kingston provided commuter rail service to Providence and Boston via Amtrak's commuter rail services. The MBTA is looking at extending their commuter service on the Providence/Stoughton Line.

<span class="mw-page-title-main">Clinton station (Connecticut)</span> Railway station in Clinton, Connecticut, US

Clinton station is a regional rail station served by the CTrail Shore Line East service located near downtown Clinton, Connecticut. The station has two side platforms connected by a footbridge. Clinton is a commuter-only station; Amtrak's Acela Express and Northeast Regional services run through the station without stopping.

<span class="mw-page-title-main">Madison station (Connecticut)</span> Railway station in Madison, Connecticut

Madison is a passenger rail station along CTrail's Shore Line East commuter rail line, which runs on the Northeast Corridor between New Haven and New London. Madison station consists of a mid-sized parking lot and one high-level side platform on the southbound side of the tracks.

<span class="mw-page-title-main">Guilford station</span> Railway station in Guilford, Connecticut

Guilford is a regional rail station on the Northeast Corridor, located slightly south of the town center of Guilford, Connecticut. Owned by the Connecticut Department of Transportation, it is served by the CTrail Shore Line East service.

<span class="mw-page-title-main">Branford station</span> Railway station in Branford, Connecticut

Branford is a station along the CTrail Shore Line East commuter railroad between Stamford and New London, Connecticut. The station itself is located in Branford, Connecticut. Branford is also a station on the northern section Northeast Corridor. Amtrak does not stop at the station but Amtrak trains pass through it.

<i>Beacon Hill</i> (train) Amtrak commuter train between Boston and New Haven

The Beacon Hill was a daily 157-mile (253 km) commuter rail service operated by Amtrak between Boston, Massachusetts, and New Haven, Connecticut, from 1978 to 1981. The Beacon Hill was one of the last long-haul commuter services operated by Amtrak. Service consisted of a single rush-hour round trip, with service eastbound to Boston in the morning and westbound to New Haven in the evening.

<span class="mw-page-title-main">Bowie Railroad Buildings</span> Railway building and museum in Bowie, Maryland, US

The Bowie Railroad Buildings comprise three small frame structures at the former Bowie train station, located at the junction of what is now the Northeast Corridor and the Pope's Creek Subdivision in the town center of Bowie, Maryland. The complex includes a single-story freight depot, a two-story interlocking tower, and an open passenger shed. The station was served by passenger trains from 1872 until 1989, when it was replaced by Bowie State station nearby. The buildings were restored in 1992 as the Bowie Railroad Museum and added to the National Register of Historic Places in 1998.

<i>Chesapeake</i> (train) 1978–1983 Amtrak commuter train from Washington to Philadelphia

The Chesapeake was a daily passenger train operated by Amtrak along the Northeast Corridor between Washington, D.C., and Philadelphia, Pennsylvania, from 1978 to 1983. It was one of the few commuter trains operated by Amtrak.

The Clamdigger was a daily passenger train which ran along the Northeast Corridor during the 1970s. The train had two iterations: from 1898 to 1972 it was a local commuter service under the New Haven Railroad, Penn Central, and Amtrak between New London and New Haven, while from 1976 to 1978 it was a long-distance commuter service operated by Amtrak from Providence to New Haven. In 1978, it was canceled and replaced with the Beacon Hill.

<span class="mw-page-title-main">Groton station (Connecticut)</span>

Groton station was one of the shortest-lived Amtrak passenger rail stations, in service from January to April 1978 during the last incarnation of Amtrak's Clamdigger service. Previous stations at several locations in Groton were served from 1852 until the mid-20th century.

Lanham station was a regional rail station on the Northeast Corridor, located just outside the Capital Beltway off Route 450 in Lanham, Maryland. It was served by the predecessor of today's MARC Penn Line, until August 1982.

References

  1. "Last Run Made By 'Clamdigger'". Bridgeport Telegram . January 29, 1972. p. 32. Retrieved July 13, 2016 via Newspapers.com. Open Access logo PLoS transparent.svg
  2. 1 2 Reindl, JC (April 6, 2012). "Niantic could be stop for railroad". The New London Day. Retrieved July 13, 2016.
  3. Hebert, H. Josef (August 26, 1981). "New Amtrak Network Keeps Most of System Intact". Associated Press.
  4. 1 2 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 94–96. ISBN   0942147022.
  5. 1 2 3 4 5 6 7 Belletzkie, Bob. "CT Passenger Stations, E". Tyler City Station.
  6. "Last Run Made By 'Clamdigger'". Bridgeport Telegram . January 29, 1972. p. 32. Retrieved July 13, 2016 via Newspapers.com. Open Access logo PLoS transparent.svg
  7. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1972" (PDF). Pennsylvania Railroad Technical & Historical Society.
  8. 1 2 3 "Final Report of the Task Force on Rail Service". Connecticut General Assembly Office of Legislative Research. February 1996. Retrieved October 11, 2012.
  9. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1976" (PDF). Pennsylvania Railroad Technical & Historical Society. p. 34.
  10. "National Train Timetables". National Railroad Passenger Corporation (Amtrak). October 31, 1976. pp. 15, 22 via The Museum of Railway Timetables.
  11. Baer, Christopher T. (April 2015). "A General Chronology Of The Pennsylvania Railroad Company Its Predecessors And Successors And Its Historical Context: 1977" (PDF). Pennsylvania Railroad Technical & Historical Society. p. 32.
  12. 1 2 "National Train Timetables". Amtrak). April 30, 1978. p. 18 via The Museum of Railway Timetables.
  13. 1 2 Baer, Christopher T. (April 2015). "A General Chronology Of The Pennsylvania Railroad Company Its Predecessors And Successors And Its Historical Context: 1978" (PDF). Pennsylvania Railroad Technical & Historical Society.
  14. 1 2 "Niantic train stop not getting untracked". New London Day. May 3, 1978. p. 9.
  15. Hebert, H. Josef (August 26, 1981). "New Amtrak Network Keeps Most of System Intact". Associated Press.
  16. Baer, Christopher T. (April 2015). "A General Chronology Of The Pennsylvania Railroad Company Its Predecessors And Successors And Its Historical Context: 1980–1989" (PDF). Pennsylvania Railroad Technical & Historical Society.
  17. "Shore Line East". Trains . July 5, 2006. Retrieved July 15, 2016.
  18. Drelich, Kimberly (February 18, 2015). "$750,000 would go toward Niantic train station plan". The New London Day. Retrieved July 13, 2016.

Commons-logo.svg Media related to Niantic station at Wikimedia Commons