Rhine Bridge

Last updated
The Rhine Bridge at Kehl

Pont ferroviaire de Kehl
Rheinbrücke Kehl
Neubau Eisenbahnbrucke Kehl3.JPG
The bridges of 1956 and 2010
Coordinates 48°34′32″N7°48′3″E / 48.57556°N 7.80083°E / 48.57556; 7.80083
CarriesRail traffic
Crosses Rhine
Locale Strasbourg, France and Kehl, Germany
Characteristics
Design Truss bridge
Total length238.4 metres (782 ft)
Width6.66 metres (21.9 ft) (1956–2010)
13 metres (43 ft) (from 2010)
Height8 metres (26 ft) (1956–2010)
12.2 metres (40 ft) (from 2010)
History
OpenedMay 1861 (first railway bridge)
December 2010 (most recent bridge)
Location
Rhine Bridge

The first railway bridge at Kehl across the Rhine was opened in May 1861. Since then the bridge has been partially or fully destroyed more than once.

Contents

The Kehl railway bridge constructed in 1956, was a single track railway bridge between Strasbourg and Kehl, crossing in the process both the Rhine and the frontier between Germany and France.

A replacement double track railway bridge was first used on 10 October 2010 and formally opened in December 2010 in order to permit trains to cross the river more rapidly. The speed limit on the new bridge is 160 km/h (100 mph).

The 1861 bridge

Under the terms of an international convention dated 2 July 1857 between Baden and the French government it was agreed that a railway bridge should be constructed across the Rhine between Kehl and Strasbourg. This would be the first permanent bridge across the Upper Rhine.

The completed bridge seen in 1920. Strasbourg - Pont du Chemin de fer sur le Rhin carte postale 1920.jpg
The completed bridge seen in 1920.

The structure would comprise a twin track bridge 253 metres (830 ft) long, with a central truss section of 177 metres (581 ft). On each side of the bridge would be a turntable with 26 metres (85 ft) of usable diameter.

Work began in 1858, the Compagnie des chemins de fer de l'Est taking responsibility for the foundations. In order to sink the piles into the Rhine mud it was necessary to construct protective caissons extending 18 metres (59 ft) below the river level.

The steel superstructure was delivered and assembled by "Gebrüder Benckiser" (Benckiser Brothers), a Pforzheim company. The superstructure weighed approximately 1000 tons, and was assembled on the west (Strasbourg) bank of the river on a site 450 metres (1,480 ft) long.

The bridge became operational on 11 May 1861.

The outbreak in 1870 of the Franco-Prussian War saw the turntable on the eastern (Kehl) end of the bridge dynamited. Until a new steel structure could be erected in 1874, a provisional timber structure was put in place. As a result of the war the frontier moved: between 1871 and 1919 both ends of the bridge were located in and wholly owned by Germany, but in 1919 it was stipulated under the terms of the Treaty of Versailles that the bridge would be wholly owned by France. This was consistent with France's military occupation, under the terms of the treaty, of the formerly German Rhineland: the occupation continued in various forms until 1930.

The destroyed bridge in 1940 Bundesarchiv Bild 121-0476, Gesprengte Rheinbrucke bei Kehl.jpg
The destroyed bridge in 1940
The new bridge shortly before it opened in 2010 Neubau Eisenbahnbrucke Kehl4.JPG
The new bridge shortly before it opened in 2010

By this time a project had reached the planning stage to replace the bridge which by now was more than 75 years old, but no such replacement would be built till well after the Second World War. With the outbreak of war in the late summer of 1939, French troops blew up the bridge's main western support. Until September 1940 the bridge could nevertheless be used courtesy of temporary repairs undertaken. In November 1944 German troops blew up the bridge's main eastern support, effectively destroying the bridge in its totality.

Replacing the 1861 bridge: the 1956 bridge

Topographical map showing the location of the current bridges. France is on the left, Germany on the right. Pont ferroviare de kehl.png
Topographical map showing the location of the current bridges. France is on the left, Germany on the right.

In July 1945 U.S. engineering troops constructed a military kit based provisional single-track bridge.

On 30 January 1953 an agreement was signed between France and Germany concerning permanent bridges and transit over the Rhine on the Franco-German frontier (Abkommen über die festen Brücken und Fähren über den Rhein an der deutsch-französischen Grenze). This included provision for new railway bridges connecting Kehl and Strasbourg. Two separate single-track bridges were envisaged, one for each direction of travel, but a second bridge of this nature was never actually built.

Work began on the first single track rail bridge in May 1954. This is a triple span post-free trellis frame steel bridge supported by a continuous beam. The bridge was opened on 12 August 1956. The frontier was set at the midpoint of the bridge: Germany owns the eastern half and France owns the western half.

Complementing the 1956 bridge: the 2010 bridge

On 14 March 2006 France and Germany agreed the framework for the construction of the extended high speed LGV Est railway line. [1] The project required that trains be able to cross the Rhine at Kehl at speeds of up to 120 km/h (75 mph) at a time when the single track 1956 bridge was restricted to 60 km/h (37 mph). [2] Provision was therefore made for a twin track bridge. Work began in March 2008 with completion scheduled for the end of 2010.

The new bridge is in total 238.4 metres (782 ft) long, 12.2 metres (40 ft) high and 13 metres (43 ft) wide. Clearance for river traffic at high water and flood levels must be at least 7 metres (23 ft).

Related Research Articles

<span class="mw-page-title-main">TGV</span> State-owned intercity high-speed rail service of France

The TGV is France's intercity high-speed rail service, operated mainly by SNCF. SNCF worked on a high-speed rail network from 1966 to 1974 and presented the project to President Georges Pompidou who approved it. Originally designed as turbotrains to be powered by gas turbines, TGV prototypes evolved into electric trains with the 1973 oil crisis. In 1976 the SNCF ordered 87 high-speed trains from Alstom. Following the inaugural service between Paris and Lyon in 1981 on the LGV Sud-Est, the network, centered on Paris, has expanded to connect major cities across France and in neighbouring countries on a combination of high-speed and conventional lines. The TGV network in France carries about 110 million passengers a year.

<span class="mw-page-title-main">Kehl</span> City in Baden-Württemberg, Germany

Kehl is a city with around 38,000 inhabitants in the southwestern German state of Baden-Württemberg. It lies in the region of Baden on the Rhine River, at the confluence with the smaller Kinzig River, directly opposite the French and Alsatian city of Strasbourg. It is the third-largest city of the Ortenaukreis after Offenburg and Lahr/Schwarzwald.

<span class="mw-page-title-main">LGV Est</span> French high-speed railway

The Ligne à Grande Vitesse Est européenne, typically shortened to LGV Est, is a French high-speed rail line that connects Vaires-sur-Marne and Vendenheim. The line halved the travel time between Paris and Strasbourg and provides fast services between Paris and the principal cities of Eastern France as well as Luxembourg and Germany. The LGV Est is a segment of the Main Line for Europe project to connect Paris with Budapest with high-speed rail service.

<span class="mw-page-title-main">Pierre Pflimlin Bridge</span> Bridge near Strasbourg

The Pierre Pflimlin Bridge is a 957-metre (3,140 ft) long motorway cantilever bridge over the river Rhine, with a main span measuring 205 metres (673 ft). It connects Germany and France, at Kehl and Strasbourg. It is named after Pierre Pflimlin, a former French prime minister, and was opened in 2002. It was funded by France, Germany and the European Union.

<span class="mw-page-title-main">Main Line for Europe</span> Paris-Bratislava railway upgrade plan

The Magistrale for Europe or Main Line for Europe is a Trans-European Transport Networks (TEN-T) project for the creation of a high-speed railway line between Paris and Bratislava, with a branch-off to Budapest. It was listed as TEN project No. 17 (Paris—Bratislava) by the European Commission in 1995, and is already under way.

<span class="mw-page-title-main">Siege of Kehl (1733)</span> 1733 during the War of the Polish Succession

The siege of Kehl was one of the opening moves of the French Rhineland campaign in the War of the Polish Succession, at the fortress town of Kehl in the upper Rhine River valley in the Holy Roman Empire. A large French army under the command of the Duke of Berwick besieged and captured the fortress, which was lightly garrisoned and in poor condition.

<span class="mw-page-title-main">Siege of Kehl (1796–1797)</span> Part of the Rhine Campaign of 1796 during the War of the First Coalition

The siege of Kehl lasted from 26 October 1796 to 9 January 1797. Habsburg and Württemberg regulars numbering 40,000, under the command of Maximilian Anton Karl, Count Baillet de Latour, besieged and captured the French-controlled fortifications at the village of Kehl in the German state of Baden-Durlach. The fortifications at Kehl represented an important bridgehead crossing the Rhine to Strasbourg, an Alsatian city, a French Revolutionary stronghold. This battle was part of the Rhine Campaign of 1796, in the French Revolutionary War of the First Coalition.

<span class="mw-page-title-main">High-speed rail in France</span>

France has a large network of high-speed rail lines. As of June 2021, the French high-speed rail network comprises 2,800 km (1,740 mi) of tracks, making it one of the largest in Europe and the world. As of early 2023, new lines are being constructed or planned. The first French high-speed railway, the LGV Sud-Est, linking the suburbs of Paris and Lyon, opened in 1981 and was at that time the only high-speed rail line in Europe.

<span class="mw-page-title-main">Duisburg-Hochfeld Railway Bridge</span> Railway bridge in Germany

The Duisburg–Hochfeld railway bridge spans the Rhine in the German city of Duisburg on the Duisburg-Ruhrort–Mönchengladbach line. The first bridge was built by the Rhenish Railway Company and put into operation at the end of 1873. It was replaced by a new bridge in 1927, which was badly damaged during the Second World War, but rebuilt and is still serves rail traffic between the Ruhr region and Aachen.

<span class="mw-page-title-main">Hindenburg Bridge</span> Train bridge over the Rhine at Rüdesheim, Germany

The Hindenburg Bridge was a railway bridge over the Rhine between Rüdesheim in the German state of Hesse and Bingen-Kempten state of Rhineland-Palatinate, named in 1918 after Field Marshal Paul von Hindenburg, later German President. The bridge was put in service in 1915, destroyed in the Second World War and never rebuilt.

<span class="mw-page-title-main">Wesel Railway Bridge</span> Railway bridge in Wesel, Germany

The Wesel Railway Bridge was a bridge on the Haltern–Venlo railway, built as part of the Hamburg–Venlo railway by the Cologne-Minden Railway Company, and opened on 1 March 1874. The 1,950-metre (6,400 ft) long railway bridge at Wesel was the last Rhine bridge remaining in German hands during World War II.

<span class="mw-page-title-main">Waldshut–Koblenz Rhine Bridge</span>

The Waldshut–Koblenz Rhine Bridge is a single-track railway bridge on the Turgi–Koblenz–Waldshut railway, between Waldshut and Koblenz AG, crossing the Rhine and the border between Germany and Switzerland. It was the first railway bridge built over the Rhine below Lake Constance. It is the only major railway bridge over the Rhine, which is completely preserved in its original condition and is one of Europe's few lattice truss bridges. It is also one of the oldest railway bridges in the world.

<span class="mw-page-title-main">Old Rhine Bridge (Konstanz)</span> Bridge over the Rhine

The Old Rhine Bridge at Konstanz spans the Seerhein. It is a combined road and railway bridge. In addition to one track of the High Rhine Railway at kilometer 413.5, it carries the Konzilstraße, the road that connects the borough of Petershausen with the city centre. The road bridge carries two lanes into the city center and three lanes in the other direction. Additionally, there is a bicycle lane in both directions on the left and a sidewalk on the right. In the 19th century, distance markers were placed along the Rhine; they start counting kilometers at this bridge.

<span class="mw-page-title-main">Incremental launch</span> Bridge building method

Incremental launch is a method in civil engineering of building a complete bridge deck from one abutment of the bridge only, manufacturing the superstructure of the bridge by sections to the other side. In current applications, the method is highly mechanised and uses pre-stressed concrete.

<span class="mw-page-title-main">Saverne Tunnel</span> Rail tunnel in France

The Saverne Tunnel, also known as the Ernolsheim-lès-Saverne Tunnel, is a twin-bore 4-kilometre-long (2.5 mi), high-speed rail tunnel in western Bas-Rhin, France. It carries the LGV Est line of France's TGV high-speed rail network through the narrowest part of the Vosges mountain range, beneath Mont Saint-Michel and adjacent to the Saverne Pass. The tunnel consists of two bores, containing one rail track each, that are connected by passageways every 500 metres (1,600 ft). The LGV Est crosses the 270 m (890 ft) Haspelbaechel viaduct near the western end of the tunnel. The tunnel was excavated by a tunnel boring machine between November 2011 and February 2013. Civil engineering work on the tunnel ended in April 2014 and it opened with the rest of the second phase of the LGV Est on 3 July 2016. The total cost of the tunnel was approximately €200 million.

<span class="mw-page-title-main">Battle of Kehl (1796)</span> Battle in the war of the first coalition

During the Battle of Kehl, a Republican French force under the direction of Jean Charles Abbatucci mounted an amphibious crossing of the Rhine River against a defending force of soldiers from the Swabian Circle. In this action of the War of the First Coalition, the French drove the Swabians from their positions in Kehl and subsequently controlled the bridgehead on both sides of the Rhine.

<span class="mw-page-title-main">Second Battle of Kehl (1796)</span> Part of The French Revolutionary Wars

The Second Battle of Kehl occurred on 18 September 1796, when General Franz Petrasch's Austrian and Imperial troops stormed the French-held bridgehead over the Rhine river. The village of Kehl, which is now in the German state of Baden-Württemberg, was then part of Baden-Durlach. Across the river, Strasbourg, an Alsatian city, was a French Revolutionary stronghold. This battle was part of the Rhine Campaign of 1796, in the French Revolutionary War of the First Coalition.

<span class="mw-page-title-main">Hammer Bridge</span> Bridge

The Hammer Bridge is a 220 metres (722 ft) long railway bridge on the Weser Valley line crossing the Geul valley a few hundred meters to the south of Hergenrath.

<span class="mw-page-title-main">Eckwersheim derailment</span> Train crash in Alsace, France on 14 November 2015

On 14 November 2015, a TGV train derailed in Eckwersheim, Alsace, France, while performing commissioning trials on the second phase of the LGV Est high-speed rail line, which was scheduled to open for commercial service five months later. The derailment resulted in 11 deaths and 42 injuries. It was the first fatal derailment in the history of the TGV and the third derailment since the TGV entered commercial service in 1981.

<span class="mw-page-title-main">Mother Kinzig</span> Monument in Kehl, Germany

Mother Kinzig is a 1861 cast iron statue in the German city of Kehl. It represents a "beautiful, dreamy, and sexy", "marvelously pretty" nude woman, who has been called "the most beautiful girl of Kehl".

References

  1. Interconnexion du TGV-Est français et de l’ICE allemand - LGV-Est Archived 2008-11-14 at the Wayback Machine sur « france-allemagne.fr »
  2. Le nouveau pont de Kehl est sur les rails sur « 20minutes.fr »