The two locomotives were both built in 1929 and given the S&DJR numbers 101 and 102. The locomotives replaced three older Highbridge-built saddle tanks, 24A, 25A and 45A. They were both used for shunting coal wagons on the colliery branchlines around Radstock. They were built to a reduced loading gauge as they had to pass under the Tyning Arch which had only 10feet 10inches (3.30m)clearance.
This page is based on this Wikipedia article Text is available under the CC BY-SA 4.0 license; additional terms may apply. Images, videos and audio are available under their respective licenses.