History | |
---|---|
United States | |
Name | Kehuku (1920–1926) Chiloil (1926–1947) |
Namesake | Kahuku |
Owner | USSB (1920–1926) Chile SS Co Inc American Tankers of Delaware War Shipping Administration |
Builder | Bethlehem Shipbuilding Corp., Wilmington |
Yard number | 3471 [1] |
Laid down | 3 March 1919 |
Launched | 10 April 1920 [2] |
Sponsored by | Mrs. A.J. Berris |
Completed | June 1920 |
Homeport | Wilmington |
Identification |
|
Fate | Broken up, 1947 |
General characteristics | |
Type | Design 1031 Tanker ship |
Tonnage | |
Length | 391.8 ft (119.4 m) registry length [4] |
Beam | 51.3 ft (15.6 m) [4] |
Draft | 29 ft (8.8 m) [1] |
Depth | 28.8 ft (8.8 m) [4] |
Installed power | 2,600 ihp, 390 Nhp |
Propulsion | Bethlehem Shipbuilding Corp. triple expansion steam engine |
Speed | 11 kn (20 km/h; 13 mph) [2] |
Range | 5,200 nmi (9,600 km; 6,000 mi) [4] |
Capacity | 214,155 gallons [5] |
Crew | 38 [4] |
SSKehuku was a Design 1031 tanker ship built for the United States Shipping Board immediately after World War I.
She was laid down at yard number 3471 at the Wilmington, Delaware shipyard of the Bethlehem Wilmington Shipyard, one of 6 Design 1031 tankers built by Bethlehem for the United States Shipping Board. [1] [4] An additional 5 ships were built by the Terry Shipbuilding Company of Savannah, Georgia. [1] She was launched on 10 April 1920, [2] completed in June 1920, [1] and named Kehuku. [1] [2] Total cost was $1,947,618. [6] In 1926, she was purchased by Chile SS Co Inc (New York City), and renamed Chiloil. [1] [7] In 1935, she was purchased by American Tankers of Delaware (Wilmington). [1] [7] In 1943–1944, she was returned to the War Shipping Administration. [1] [7] She was broken up in the 2q of 1947 in Mobile, Alabama by Hugget. [1] [7]
SS City of Flint, a Hog Islander freighter built by American International Shipbuilding at the Hog Island Shipyard, Philadelphia for the United States Shipping Board (USSB), Emergency Fleet Corporation. City of Flint was named to honor the citizens of Flint, Michigan for their effort in Liberty Loan drives during World War I.
The United States Maritime Commission (MARCOM) was an independent executive agency of the U.S. federal government that was created by the Merchant Marine Act of 1936, which was passed by Congress on June 29, 1936, and was abolished on May 24, 1950. The commission replaced the United States Shipping Board which had existed since World War I. It was intended to formulate a merchant shipbuilding program to design and build five hundred modern merchant cargo ships to replace the World War I vintage vessels that comprised the bulk of the United States Merchant Marine, and to administer a subsidy system authorized by the Act to offset the cost differential between building in the U.S. and operating ships under the American flag. It also formed the United States Maritime Service for the training of seagoing ship's officers to man the new fleet.
The Type C4-class ship were the largest cargo ships built by the United States Maritime Commission (MARCOM) during World War II. The design was originally developed for the American-Hawaiian Lines in 1941, but in late 1941 the plans were taken over by the MARCOM.
SS Managua was a Nicaraguan Cargo ship that the German submarine U-67 torpedoed on 16 June 1942 in the Straits of Florida while she was travelling from Charleston, South Carolina, United States to Havana, Cuba with a cargo of Potash. The ship was built as Glorieta, a Design 1049 ship in 1919, operated by the United States Shipping Board (USSB) until sold to the Munson Steamship Line in 1920 and renamed Munisla. The ship was sold foreign to a Honduran company, Garcia, in 1937 and renamed Neptuno. In 1941 the ship was re-flagged in Nicaragua with the name Managua.
The Design 1023 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's (USSB) Emergency Fleet Corporation (EFC) in World War I. Like many of the early designs approved by the EFC, the Design 1023 did not originate with the EFC itself but was based on an existing cargo ship designed by Theodore E. Ferris for the United States Shipping Board (USSB). The ships, to be built by the Submarine Boat Corporation of Newark, New Jersey, were the first to be constructed under a standardized production system worked out by Ferris and approved by the USSB.
SSCapillo was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
Suremico was a Design 1023 cargo ship built for the United States Shipping Board (USSB) immediately after World War I. She was later named the Nisqually and converted into a barge and later a scow. She was bombed and sunk during the Battle of Wake Island.
SSNew England was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSSuedco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSSuboatco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSSuportco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSCambridge was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
The Design 1031 ship was a steel-hulled tanker ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. A total of 16 ships were ordered; 5 were cancelled and 11 were built from 1919 to 1920. Two shipyards were used in their construction: Bethlehem Wilmington Shipyard of Wilmington, Delaware ; and Terry Shipbuilding Company of Savannah, Georgia.
The Design 1032 ship was a steel-hulled tanker ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. A total of 5 ships were ordered and completed from 1919 to 1920. All ships were constructed by Bethlehem San Francisco Shipyard of San Francisco, California.
SSMary was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCassimir was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCarrabulle was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSCatahoula was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
SSComol Cuba was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I. Converted to a tanker, she spent most of her career transporting molasses, a byproduct of sugar refining, to the United States. During World War II, she transported petroleum before returning to the private sector.
SS Skagway Victory was a Victory ship built for the United States during World War II. She was launched by the Oregon Shipbuilding Corporation on June 21, 1944, and was completed on July 15, 1944. The ship's US Maritime Commission designation was VC2-S-AP3, hull number 116 (V-116). She was built in 64 days under the Emergency Shipbuilding program. The Maritime Commission turned her over to a civilian contractor, the Alcoa, for operation until the end of World War II hostilities. She was operated under the US Merchant Marine Act for the War Shipping Administration.